Natural Gas Society (NGS) organized a Conference on O&M Activities (Natural Gas Trunk Pipelines and CGD Networks) on February 23 & 24, 2022 (in virtual mode).
A ‘Leadership Panel Discussion’ was held on the topic “Challenges in Gas Sector and how O&M can support business efficiently” in which the leaders of the Gas/CGD sector discussed various challenges in O&M of assets and the ways & means to overcome the same.
Sh A K Jana, MD, IGL, Sh Pradeep kr Chauhan, COO, PIL Sh Sandeep Trehan, Founder & President, THINK GAS Distribution Pvt Ltd, Sh. Gautam Chakraborty, ED (CGD & Renewables) GAIL (India) Ltd, Sh Sridhar Tambraparni, ED, Torrent Gas Pvt Ltd, Sh Raman Chadha, CEO, GAIL Gas Ltd, Sh Deepak Sawant, MD, MNGL, Sh Srinivasan Murali, Sr. VP (O&M), MGL participated in the panel discussion. The session was chaired by Sh M V Iyer Director (BD), GAIL
VIDEO CLIPS
PRESENTATIONS
DAY 1
Integrity Management System for Trunk Pipelines – Key issues / challenges & way forward
- Anbu Selvan R, GM (CIMG), GAIL (India) Limited
- Rama Krishna Putlam, DGM (O&M), GAIL (India) Limited
- Kunapareddy Divakar, VP & Head Field O&M, Pipeline Infrastructure Ltd.
- Sachin Kumar, DGM (PNG), Indraprastha Gas Limited and Arun Kumar Verma, Chief Manager (PNG O&M), Indraprastha Gas Limited
- Sushil Kumar DGM (CGD) – GAIL (India) Limited
DAY 2
Cathodic Protection of Cross-country Steel pipelines – Key issues / challenges & way forward
- Shiv Shanker Verma, DGM (CIMG) CO-O&M, GAIL Noida
- Sushil Kumar, DGM (CGD) – GAIL (India) Limited and Nawazish Ali Ansari, Chief Manager (CGD Project) – GAIL (India) Limited
Cathodic Protection of CGD Steel Pipelines – Key issues / challenges & way forward
Daughter Booster Stations
- Rahul Nigam, Addl. GM (O&M), Indraprastha Gas Limited
- Day 1 01 Abu SalemPratap Ayarekar, DGM (Metering & Plng), Mahanagar Gas LimitedDay 1 02 Rama Krishna
Digital Platforms for Operations Optimization
Meeting expectations from metering – new technology adoption
“Digitization Initiative at M/s Adani Total Gas” – New Technology & Advancement
Corrosion Control of CGD Pipeline Network – Utilization of All-In-One Surveys for CGD Networks
Photo Gallery Day 1
Photo Gallery Day 2