NGS’ NG/LNG SNAPSHOT Ocr 16-31, 2026

NGS’ NG/LNG SNAPSHOT Ocr 16-31, 2026

National News Internatonal News

NATIONAL NEWS

City Gas Distribution & Auto LPG

Rajasthan State Gas launches PNG push in Kota, eyes ‘LPG-free’ zones

As part of the Petroleum and Natural Gas Regulatory Board (PNGRB)’s “Drive 3”, the state government aims to connect as many households as possible to the Piped Natural Gas (PNG) network in the state, a senior official said. RSGL is a joint venture of Rajasthan State Petroleum Corporation Limited – a subsidiary of Rajasthan State Mines and Minerals Limited – and Gas Authority of India Limited (Gail). 

SHOW MORE

To begin with, Rajasthan State Gas Limited (RSGL) has launched an initiative in Kota to facilitate these connections, according to Managing Director Vinay Patni, RSGL.

Both the central and state governments are focusing on transitioning households from LPG to Domestic Piped Natural Gas (DPNG), with plans to organise outreach camps across various areas in Kota.

On October 17, 2026, a campaign was initiated, ending on December 31, 2026, to provide households with access to PNG.

RSGL MD Patni, stated that the central and state governments are prioritising the conversion of LPG connections to DPNG connections, with the ultimate goal of creating “LPG-free zones.”

He noted that this effort is part of the PNGRB “Drive 3” special campaign, which seeks to extend PNG access to the maximum number of homes.

According to him, PNG is a highly safe, economical, and convenient fuel. It is delivered directly to homes via a pipeline—much like a water supply—and is available 24/7, eliminating the hassle of repeatedly booking or replacing gas cylinders.

“For this festive season, we have announced an incentive for new households in Kota that opt for a PNG connection by December 31, 2026: they will receive 5,000 “points” (equivalent to ₹500 worth of PNG),” he said.

The PNGRB, under the Government of India, has launched a nationwide campaign to raise public awareness and facilitate the adoption of DPNG. Throughout this campaign, households in areas with existing infrastructure will be connected to the DPNG network, both through direct outreach and via camps organised at various locations.

Natural gas will be made available via a pipeline network to various establishments in Kota, including multi-story buildings, guest houses, paying-guest accommodations, hostels, hotels, restaurants, and other commercial and industrial facilities.

 In the last three months, RSGL has connected around 4,500 new households and issued 66 commercial connections in the state.

https://www.business-standard.com/industry/news/rajasthan-state-gas-launches-png-push-in-kota-eyes-lpg-free-zones-126101900895_1.html

show less

Web of permits delaying new PNG lines in Noida & Ghaziabad

Noida: For JS Bhadana, moving from LPG cylinders to piped natural gas (PNG) was meant to make life easier. Instead, the resident of Diya Green City in Raj Nagar Extension has spent four years going back and forth between the builder and Indraprastha Gas Limited (IGL), waiting for a connection.

SHOW MORE

As part of the Petroleum and Natural Gas Regulatory Board (PNGRB)’s “Drive 3”, the state government aims to connect as many households as possible to the Piped Natural Gas (PNG) network in the state, a senior official said.
“I was already done with gas cylinders, paying the delivery boy an extra charge, going online and booking the cylinder every month,” Bhadana said. “We are growing old, and it is a bit strenuous to connect to the pipeline and attach a gas cylinder.”

Bhadana moved into his flat in 2024, paying the builder more than Rs 15,000 in possession-related charges that were meant to cover the gas connection and the infrastructure to lay the pipeline. When he approached IGL, its team inspected the society and then sent him back to the builder, who said connections would only follow once occupancy reached around 30%. Pipelines have since been laid inside the society. But his flat, still, awaits one.

Govt is pressing for conversion of LPG connections to PNG amid tensions around the Strait of Hormuz. Residents say the appeal of PNG is straightforward — a continuous supply, with no booking, no waiting for delivery, no hauling cylinders up staircases.

But across Noida and Ghaziabad, families who have filled out applications, sat through verification and paid their connection charges have found themselves waiting for years regardless, stalled by missing pipelines, unresolved ownership papers, thin occupancy figures, or builders who never built the infrastructure they promised. There is no fixed timeline for the wait, and, residents say, no one is clearly accountable for it.

According to an IGL official, consumers can apply for a PNG connection through the company’s website or customer care service, providing details of their accommodation and address. An inspection follows. “Within six to seven working days, we then send our team to inspect the area, check the availability of the pipeline and assess all the requirements,” the official said.

But this is often where things stall. If the network has not reached the area, IGL first determines whether it can be extended at all, and what that would require.

Amartya Sinha, a resident of Krishna Homes in Jalpura, Greater Noida West, said he has been waiting nearly two years. “When I applied for the connection, a verification was conducted and the officials told us that the connection in the area was difficult and that it lacked infrastructure. For two years, nothing changed,” he said.

Sonu Yadav, who owns an independent house in Noida’s Sector 73, has watched highrises built directly across from his home receive connections while his application has gone nowhere. “I have just been doing the rounds of the IGL offices and have written letters to everyone possible, but the connection has not reached my home,” he said. Each time, Yadav was told there was simply no pipeline in his area.

Even a nearby pipeline offers no guarantee. The company must also confirm that the locality is authorised to receive the network, sometimes seeking verification from Noida Authority. “In the past, when we have received requests from residents, we have had to verify from the Noida Authority whether the area is authorised,” a senior IGL official in Noida said.

IGL also weighs how many flats are actually lived in before deciding whether to extend a network, the official said.

“In some cases, especially in newly built societies, when we check the occupancy rate, we find that only a few have shifted. In such cases, pushing for the pipeline infrastructure becomes a problem,” the senior official said, describing a standoff in which residents want gas before they move in while the company wants residents in place before it invests in infrastructure, with flats in some towers sitting empty long after possession begins, freezing the process altogether.

Where a pipeline does exist, the process shifts to paperwork. Consumers have to submit ownership and registry documents, and here too, delays creep in, particularly for those holding an ownership certificate for a property not yet formally registered in their name.

Once the paperwork is cleared, consumers can make the payment. The connection charge is generally around Rs 7,000, though it may vary. The company also offers an EMI facility, allowing consumers to pay around Rs 275, with the balance adjusted through subsequent gas bills.

Even payment is no guarantee of imminent supply. For residents of highrise societies, the final stretch, actually getting the pipeline inside the complex, can prove the hardest.
IGL needs the builder or maintenance body to provide access and dig the trenches required to carry the line in. “If the infrastructure is not there or the builder has not provided the necessary infrastructure for the pipeline, we cannot move ahead,” the IGL official said.

Officials said this remains a hurdle in developing areas such as parts of Crossings Republik and Raj Nagar Extension, and precisely the reason why Bhadana’s family has been caught between a builder and a utility.

Even after permissions and infrastructure are in place, residents may have to wait for the pipeline to be laid. IGL officials said construction conditions, particularly during the monsoon, can affect the schedule. “There is no fixed time. It can take six months for us to give a connection, and in some exceptional cases, when the infrastructure is all ready, it can be given in three to four days as well,” the senior IGL official said.

Not everyone is left waiting. In Lotus Villa, residents credit a proactive RWA for a comparatively swift outcome. Mahipal Singh, a resident of the Greater Noida society, received his PNG connection in May, roughly two months after applying. “The RWA took the initiative after several residents approached them and asked them to start the facility. They brought all the forms to our homes. Within a week, an inspection was conducted and we got the connection,” Singh said.

Digvijay Shukla, the RWA’s president, said the society sits around 300 metres from an existing pipeline. “IGL officials approached us, and we submitted the details of interested residents,” he said. “After verification and inspection, the pipeline was laid, and within two months we got the connections.”

District officials, meanwhile, describe their role as largely supervisory, with primary responsibility resting squarely with IGL.

Ghaziabad district supply officer (DSO) Amit Kumar Tiwari said the administration steps in mainly when individual complaints reach the district magistrate’s office. “If a consumer who wants a connection approaches the DM or me, I call IGL and ask them to look into the process and ensure that the person gets the connection,” he said. “Otherwise, it is solely the responsibility of IGL to provide the connection.”

Ghaziabad currently has around 4.25 lakh PNG connections, with capacity for roughly 1.75 lakh more. In neighbouring GB Nagar, IGL provides about 4.5 lakh domestic connections, with room for another 1.5 lakh.

GB Nagar DSO Smriti Gautam said her office sits on a committee that reviews IGL’s reports on infrastructure expansion and can escalate written complaints on residents’ behalf. But responsibility for actually delivering, and later monitoring, the connections, she said, remains with the company alone.

https://timesofindia.indiatimes.com/city/noida/web-of-permits-delaying-new-png-lines-in-noida-ghaziabad/articleshow/135177378.cms

show less

Ultra Gas targeting to add 15 LNG retail stations by end of fiscal: CEO

Ultra Gas, the Essar-backed green fuel retailer, plans to add 15 retail stations for liquefied natural gas (LNG) used in vehicles by the end of the current financial year, taking its network to 25, Maqsood Shaikh, chief executive officer and managing director, told The Hindu on Thursday.

SHOW MORE

The company aims to expand its network to more than 100 outlets by the end of FY29, entailing an investment of ₹900 crore.

The expansion is expected to improve refuelling access for long-haul freight operators and encourage the adoption of LNG-fuelled trucks. With 25 stations operational by March, the company expects refuelling facilities to be available every 200-250 km across its network.

“With the 25 stations expected by the end of March, there would be 98% assurance that refuelling stations would be available in a span of [every] 200 to 250 kilometres,” Mr. Shaikh said.

The network expansion could generate demand for around 6,000 LNG-fuelled trucks, he added.

Cost advantage

Mr. Shaikh said LNG-powered freight transportation could deliver fuel-cost savings of 25-30% compared with diesel-powered trucks, combining better fuel efficiency with lower fuel prices.

“LNG-fuelled trucks would help augur 25%-30% more savings than diesel. 15% would be because of its standalone fuel efficiency during combustion and the rest because of 10-15% discounting to diesel,” he said.

Ultra Gas is replicating an outlet design that has already received approval and support from the Petroleum and Explosives Safety Organisation (PESO). A recent amendment to the Static and Mobile Pressure Vessels (Unfired) Rules, removing the requirement for a no-objection certificate from the district magistrate, is also expected to accelerate the establishment of new stations, according to him.

Call for dedicated policy

Mr. Shaikh stressed that a dedicated LNG policy was essential to address uncertainty among transporters, lenders and investors.

“Today fund managers and bankers are not wanting to sponsor LNG trucking projects because they are not sure about the government’s viewpoint on the adoption of the fuel. It suffers the lacuna of being overshadowed by electric mobility,” he said.

He also emphasised the need for long-term LNG procurement agreements rather than reliance on spot purchases. Ultra Gas currently has five-to-10-year supply agreements with GAIL, Indian Oil, Shell and Hindustan Petroleum.

https://www.thehindu.com/business/Industry/ultra-gas-to-invest-900-crore-in-100-lng-stations-by-fy29/article71612101.ece

show less

GO TOP

Natural Gas/ Pipelines/ Company News

IGGL and ONGC Sign ₹1,325 Crore Agreement for 175-km Duliajan Feeder Gas Pipeline in Assam 

New Delhi: Indradhanush Gas Grid Limited (IGGL) and Oil and Natural Gas Corporation Limited (ONGC) have signed a Right of Use (RoU) Sharing Agreement for the Duliajan Feeder Line (DFL), a 175-km natural gas pipeline project in Assam. The agreement was signed during the Northeast Region Gas Conclave on October 10, 2026, to strengthen gas transportation infrastructure and connect gas fields in Upper Assam to the North East Gas Grid.

SHOW MORE

The proposed pipeline has an estimated investment of ₹1,325 crore and is designed to transport up to 3.5 million standard cubic metres of gas per day (MMSCMD). The project will connect CGGS-Madhuban in Duliajan to SV-14 of IGGL’s Guwahati-Nagaland Pipeline (GNPL) in Jorhat, improving the integration of regional gas resources with the wider gas grid.

IGGL-ONGC Agreement: Key Details of the Duliajan Feeder Line

The Right of Use Sharing Agreement will allow IGGL to utilise part of ONGC’s existing pipeline corridor for the Duliajan Feeder Line.

Key details of the project include:

Companies involved: Indradhanush Gas Grid Limited (IGGL) and ONGC

Agreement: Right of Use (RoU) Sharing Agreement

Project: Duliajan Feeder Line (DFL)

Agreement date: October 10, 2026

Pipeline length: 175 km

Pipeline diameter: 24 inches

Designed capacity: 3.5 MMSCMD

Estimated investment: ₹1,325 crore

Starting point: CGGS-Madhuban, Duliajan

Connection point: SV-14 of IGGL’s GNPL pipeline in Jorhat, Assam

Existing corridor to be utilised: Approximately 53 km of ONGC’s Right of Use corridor

Duliajan Feeder Line to Connect Upper Assam Gas Fields to the North East Gas Grid

The 175-km Duliajan Feeder Line is planned to connect gas infrastructure in Duliajan with IGGL’s GNPL pipeline in Jorhat. This connection will link gas fields in Upper Assam to the North East Gas Grid, supporting the transportation and distribution of natural gas across the region.

With a designed capacity of 3.5 MMSCMD, the pipeline will add to the region’s gas transportation infrastructure and strengthen connectivity between gas production areas and the broader pipeline network.

The project represents an important step towards developing an integrated gas transmission system in Northeast India.

Sharing ONGC’s Existing Corridor to Reduce Project Impact

Under the agreement, IGGL will use approximately 53 km of ONGC’s existing Right of Use corridor for the proposed feeder pipeline.

The shared-corridor approach is expected to offer several benefits:

Reduced land acquisition: Using an existing corridor will minimise the need to acquire additional land.

Lower environmental impact: Reusing existing infrastructure corridors can help limit the project’s impact on surrounding areas.

Cost optimisation: Sharing the corridor is expected to improve project cost efficiency.

Faster implementation: The arrangement is intended to help expedite project execution.

The collaboration reflects the two companies’ focus on coordinated infrastructure development and more efficient utilisation of existing resources.

IGGL and ONGC Support an Integrated National Gas Grid

The agreement highlights the importance of cooperation between energy companies in developing natural gas infrastructure. By connecting Upper Assam’s gas fields to the North East Gas Grid, the Duliajan Feeder Line is expected to strengthen regional pipeline connectivity.

ADVERTISEMENT

The initiative also aligns with the broader objective of building a stronger and more integrated national gas grid while promoting sustainable infrastructure development in Northeast India.

About Indradhanush Gas Grid Limited (IGGL)

Indradhanush Gas Grid Limited (IGGL) is a joint venture of Indian Oil Corporation Limited, ONGC, GAIL (India) Limited, Oil India Limited and Numaligarh Refinery Limited. Incorporated in 2018, the company is implementing the Northeast Gas Grid to connect the eight Northeastern states with the National Gas Grid.

About Oil and Natural Gas Corporation Limited (ONGC)

Oil and Natural Gas Corporation Limited (ONGC) is a Maharatna public sector undertaking under the Ministry of Petroleum and Natural Gas, Government of India. It is engaged in the exploration and production of crude oil and natural gas and plays a major role in India’s energy sector. Through its technical institutions and international collaborations, ONGC contributes to knowledge development, operational expertise and cooperation across the global energy industry.

https://indianmasterminds.com/news/iggl-ongc-1325-crore-duliajan-feeder-gas-pipeline-assam-242375/

show less

EIL Honoured with ‘Project Innovation of the Year’ Award at Construction World Global Awards 2026

New Delhi: Engineers India Limited (EIL) has been honoured with the ‘Project Innovation of the Year’ award at the 24th Construction World Global Awards 2026, recognising the company’s construction excellence and innovative project execution capabilities.

SHOW MORE

The recognition highlights EIL’s expertise in executing complex infrastructure projects through operational excellence, innovation and a strong commitment to quality and safety. The award further acknowledges the company’s focus on adopting effective project execution practices to meet demanding infrastructure development requirements.

EIL Recognised for Construction Excellence and Innovation

The ‘Project Innovation of the Year’ award recognises Engineers India Limited’s capabilities in delivering complex projects through innovative approaches and efficient execution. The recognition reflects the company’s emphasis on improving project delivery while maintaining high standards of quality and safety.

EIL’s project execution capabilities play an important role in handling technically challenging infrastructure assignments. Its focus on innovation and operational efficiency supports the delivery of projects that require specialised engineering expertise and coordinated execution.

Construction World Global Awards 2026 Recognise EIL’s Project Capabilities

The 24th Construction World Global Awards 2026 recognised EIL for its contribution to construction excellence and innovative project execution. The award underscores the importance of innovation, quality management and safety in delivering complex infrastructure projects.

For Engineers India Limited, this recognition reinforces its position in engineering and project management and highlights its continued focus on operational excellence across its project activities.

EIL’s Focus on Quality, Safety and Operational Excellence

Engineers India Limited places emphasis on innovation, quality and safety in executing complex projects. These priorities support efficient project management and help address the technical and operational challenges associated with large infrastructure developments.

The latest award recognises the company’s capabilities in combining engineering expertise with innovative execution practices. It also highlights the role of quality and safety standards in achieving construction excellence.

About Engineers India Limited (EIL)

Engineers India Limited (EIL) is a Government of India public sector enterprise under the Ministry of Petroleum and Natural Gas. The company provides engineering consultancy and project management services, with expertise in sectors including oil and gas, petrochemicals, fertilisers and other industrial infrastructure. EIL supports the development and execution of complex projects through its engineering and technical capabilities.

https://indianmasterminds.com/news/psu-news/eil-project-innovation-of-the-year-construction-world-global-awards-2026-243273/#:~:text=Read%20also%3A-,GAIL,-Wins%20Midstream%20Project

show less

GAIL Wins Midstream Project of the Year – India at Asian Oil & Gas Awards 2026 for Major Pipeline Project

NEW DELHI: GAIL (India) Limited has won the Midstream Project of the Year – India award at the Asian Oil & Gas Awards 2026 for its execution of the Mumbai-Nagpur-Jharsuguda Pipeline Project. The cross-country natural gas pipeline is a major infrastructure initiative under India’s National Gas Grid programme, aimed at strengthening gas transportation and supporting the country’s transition towards a gas-based economy.

SHOW MORE

Spanning four states—Maharashtra, Madhya Pradesh, Chhattisgarh and Odisha—the pipeline connects western and eastern gas sources through bidirectional gas flow. It forms an important longitudinal axis of the national gas network, improving connectivity between different gas supply regions.

The recognition highlights GAIL’s project execution capabilities, engineering solutions and coordination efforts in delivering critical energy infrastructure across challenging geographical and regulatory environments.

GAIL’s Mumbai-Nagpur-Jharsuguda Pipeline Strengthens National Gas Grid

The Mumbai-Nagpur-Jharsuguda Pipeline Project is designed to strengthen India’s natural gas transportation infrastructure by connecting gas sources across the western and eastern regions.

As part of the National Gas Grid initiative, the pipeline supports the development of an integrated gas network capable of transporting natural gas in both directions. This connectivity can improve the flexibility of gas movement between supply regions and consuming markets.

The project also supports India’s broader efforts to expand natural gas infrastructure for households, transport, commercial establishments and industries.

GAIL Overcomes Complex Terrain and Land Acquisition Challenges

The pipeline project involved significant engineering and implementation challenges due to the diverse terrain and multiple infrastructure constraints along its route.

The pipeline passed through hilly regions, forest areas, wildlife corridors and heavily constrained utility zones. Its execution also required coordination among multiple agencies, management of land-related restrictions and the handling of thousands of physical crossings.

To address these challenges, GAIL implemented three distinct Right of User (RoU) acquisition mechanisms. These included laying major sections of the pipeline within the utility corridor of an under-construction expressway, along national highways and through statutory land acquisition.

The use of these different approaches helped the company navigate land availability issues and infrastructure restrictions while progressing with construction.

Strategic engineering solutions and active stakeholder engagement played an important role in managing the project’s complex requirements and ensuring its completion.

Safety Remained a Key Priority During Project Execution

Despite the challenging construction environment, GAIL maintained a strong focus on safety throughout the pipeline’s execution.

The project involved work across difficult landscapes and areas with multiple physical and infrastructure constraints. Safety considerations remained central to construction activities, with the project recording millions of safe man-hours.

The achievement reflects the importance of safety management, coordinated execution and effective planning in delivering large-scale natural gas infrastructure projects.

Pipeline to Support India’s Transition Towards a Gas-Based Economy

The Mumbai-Nagpur-Jharsuguda Pipeline is expected to contribute to the expansion of natural gas availability across several regions.

By strengthening the National Gas Grid, the project supports the wider distribution of natural gas for piped natural gas (PNG) connections to millions of households and fuel supply to thousands of compressed natural gas (CNG) stations across dozens of districts.

Natural gas infrastructure can support cleaner energy use in households, transport and industrial activities. Wider access to gas can also contribute to lower emissions compared with more carbon-intensive fuels in suitable applications, while supporting industrial development and energy diversification.

The pipeline’s connectivity between western and eastern gas sources is therefore an important element in strengthening the country’s energy transportation network.

Asian Oil & Gas Awards 2026 Recognise Industry Excellence

The Asian Oil & Gas Awards recognise organisations delivering excellence and measurable impact across the oil and gas value chain.

The awards highlight companies that demonstrate successful strategies, adapt to changing industry conditions, promote digital transformation and overcome operational challenges in a demanding business environment.

GAIL’s recognition in the Midstream Project of the Year – India category acknowledges its work on a major natural gas transportation project and its contribution to strengthening India’s gas infrastructure.

About GAIL (India) Limited

GAIL (India) Limited is a Maharatna public sector enterprise under the Ministry of Petroleum and Natural Gas, Government of India. It is one of India’s leading natural gas companies, with operations spanning natural gas transmission and marketing, gas processing, petrochemicals, LPG and related energy businesses. GAIL plays a significant role in developing the National Gas Grid and supporting India’s efforts to expand natural gas infrastructure and diversify its energy mix.

https://indianmasterminds.com/news/gail-wins-midstream-project-of-the-year-india-asian-oil-gas-awards-2026-243213/#:~:text=GAIL,-Wins%20Midstream%20Project&text=its%20Mumbai%2CNagpur%2CJharsuguda%20natural-,gas%20pipeline,-…%20Read%20also%3A&text=PNGRB%20Awards%20for-,Gas%20Pipeline,-Transportation%20and%20HSSE

show less

Vadodara councillor seeks answers over allocation of three LNG stations

Vadodara: Vadodara Municipal Corporation councillor Deepa Shrivastav has sought a 15-day response from Vadodara Gas Limited (VGL) over the allocation of LNG stations at Por, Waghodia and Asoj. She has questioned the selection process, due diligence and possible links between the companies awarded the stations.
VGL allocated the stations to LNG Express India Pvt Ltd and LNG Express (Global) Pvt Ltd. According to Shrivastav, Registrar of Companies records show that the directors of both companies and Cryogas Equipment Pvt Ltd are the same.

SHOW MORE

She also cited an ongoing legal dispute between Cryogas and INOX for alleged copyright infringement of proprietary engineering drawings and works related to cryogenics and LNG semi-trailers. Vadodara Commercial Court passed an interim injunction in favour of INOX on June 11, 2025, while Gujarat High Court declined to interfere with the order on July 7, 2026. Shrivastav has asked VGL to clarify whether the dispute has any bearing on the allocations or related assets.

According to Shrivastav, VGL’s replies to her representations dated July 1, Aug 20 and Oct 9 did not adequately address her concerns over common directorships, the selection process and due diligence. She has also written to the VMC, GAIL and the Petroleum and Natural Gas Regulatory Board.

She has sought details on whether the stations were allotted through a competitive process and, if not, the policy and approvals governing the decisions. She has also asked for information on statutory clearances, including those from the Petroleum and Explosives Safety Organisation, where applicable, and utilisation agreements covering asset ownership, tenure and charges.

Referring to VGL’s expression of interest for a station at Dabhoi, Shrivastav said the selection process for the three earlier locations remained unclear.

If VGL fails to provide a satisfactory response within 15 days, she plans to raise the matter before the VMC General Board or Standing Committee and explore other legal remedies.

https://timesofindia.indiatimes.com/city/vadodara/vadodara-councillor-seeks-answers-over-allocation-of-three-lng-stations/articleshow/135019652.cms

show less

Petronet LNG’s Dahej and Kochi Terminals Earn 5-Star Rating, Sword of Honour for Fourth Consecutive Year

New Delhi: Petronet LNG Limited has announced that its Dahej and Kochi LNG terminals have received a 5-Star rating and the Sword of Honour from the British Safety Council for the fourth consecutive year in 2026.

SHOW MORE

The recognition reflects the company’s continued focus on occupational health and safety, employee well-being and maintaining safety standards across its terminal operations.

According to the company, the achievement reflects the collective efforts of its management and employees, supported by a strong workplace safety culture.

The repeated recognition at both terminals highlights Petronet LNG’s emphasis on safety practices across its liquefied natural gas (LNG) infrastructure.

https://www.psuconnect.in/psu-news/petronet-lng-dahej-and-kochi-terminals-earn-5-star-rating-sword-of-honour-for-fourth-consecutive-year

show less

BPCL Wins Green Hydrogen Project of the Year – India at Asian Oil & Gas Awards 2026

New Delhi: Bharat Petroleum Corporation Limited (BPCL) has won the Green Hydrogen Project of the Year – India award at the Asian Oil & Gas Awards 2026 for its pioneering 5 MW Green Hydrogen Plant at Bina Refinery in Madhya Pradesh. The project marks a significant milestone in BPCL’s energy transition journey and supports India’s efforts to develop a low-carbon, hydrogen-based economy.

SHOW MORE

The project aligns with the Government of India’s National Green Hydrogen Mission and the country’s Net Zero 2070 vision. It also supports BPCL’s commitment to reducing its Scope 1 and Scope 2 emissions by 2040.

BPCL Commissions 5 MW Green Hydrogen Plant at Bina Refinery

BPCL has successfully commissioned the 5 MW Green Hydrogen Plant at Bina Refinery, making it one of the largest refinery-integrated green hydrogen facilities in India. The project was executed within just 15 months, highlighting the company’s focus on timely project delivery and operational excellence.

The facility uses advanced alkaline water electrolysis technology to produce 2.15 metric tonnes of green hydrogen per day, with an energy consumption of 50.75 kWh per kilogram of hydrogen.

The plant is equipped with two state-of-the-art alkaline electrolysers and an advanced purification system capable of delivering hydrogen with a purity of 99.999%. These technologies enable the production of high-purity green hydrogen for integration into refinery operations.

Green Hydrogen Plant to Reduce Carbon Emissions

Powered entirely by renewable energy, the Bina facility will serve as an important platform for demonstrating the technical viability of integrating green hydrogen into refinery operations.

The project enables the direct replacement of conventionally produced grey hydrogen with green hydrogen. This transition is expected to reduce carbon dioxide emissions by approximately 9,000 metric tonnes annually, contributing to industrial decarbonisation and BPCL’s emissions-reduction targets.

The plant will also help demonstrate the potential for wider adoption of green hydrogen technology across the refining sector, supporting the transition towards cleaner industrial processes.

Project Supports India’s National Green Hydrogen Mission

As one of India’s early large-scale green hydrogen initiatives in the refining sector, the project reinforces BPCL’s role in the country’s energy transition.

By integrating renewable energy with hydrogen production, the facility supports the objectives of the National Green Hydrogen Mission and contributes to India’s long-term Net Zero 2070 vision. It also strengthens energy sustainability and demonstrates how green hydrogen can help reduce the carbon footprint of energy-intensive industries.

The commissioning of the plant reflects BPCL’s commitment to sustainable growth, technological advancement and operational excellence while supporting the development of a hydrogen-based economy in India.

Asian Oil & Gas Awards Recognise Energy Sector Excellence

The Asian Oil & Gas Awards recognise organisations that demonstrate excellence and measurable impact across the oil and gas value chain.

The awards highlight companies implementing successful strategies to adapt to evolving industry conditions, advance digital transformation and overcome challenges in a demanding operating environment.

BPCL’s recognition for its Bina Green Hydrogen Plant highlights the significance of its investment in clean energy technologies and its contribution to the transformation of India’s refining sector.

About Bharat Petroleum Corporation Limited (BPCL)

Bharat Petroleum Corporation Limited (BPCL) is a Maharatna public sector undertaking under the Ministry of Petroleum and Natural Gas, Government of India. The company operates across the petroleum value chain, including refining, fuel marketing and related energy businesses. BPCL is also advancing its energy transition initiatives through investments in cleaner fuels, renewable energy and green hydrogen to support sustainable growth and India’s decarbonisation goals.

https://indianmasterminds.com/news/bpcl-green-hydrogen-project-year-asian-oil-gas-awards-2026-243553/

show less

NMDC Signs Gas Supply Agreement with GAIL Gas to Reduce Emissions at Nagarnar Pellet Plant

New Delhi: State-owned NMDC Limited has signed a Gas Sales Agreement (GSA) with GAIL Gas Limited to secure a dedicated supply of Re-gasified Liquefied Natural Gas (RLNG) for its iron ore pellet plant at Nagarnar in Jagdalpur, Chhattisgarh. The agreement marks a significant step towards cleaner industrial operations, improved process efficiency and sustainable industrial development.

SHOW MORE

Under the long-term agreement, GAIL Gas will develop the required pipeline connectivity and establish a gas receiving and metering station at Nagarnar to ensure a reliable supply of natural gas to the pellet plant. The expansion of the natural gas pipeline network into the Jagdalpur region is expected to facilitate the transition from furnace oil to a cleaner industrial fuel.

The shift to natural gas is expected to help NMDC reduce emissions while improving operational efficiency, product quality and the long-term cost competitiveness of its pellet operations.

NMDC and GAIL Gas Sign Agreement for Cleaner Energy Supply

The Gas Sales Agreement was signed by G.S.S.V. Suresh, Executive Director (Works) at NMDC, and Mohd. Zafar Khan, Head of Marketing at GAIL Gas Limited.

The signing ceremony was attended by Vinay Kumar, Director (Technical) at NMDC; Vivek Nishant Nath, Director (Commercial) at NMDC; and senior officials from both organisations.

The partnership aims to strengthen energy infrastructure at the Nagarnar facility and support the adoption of cleaner fuel in industrial operations. The development of dedicated pipeline connectivity and a gas receiving and metering station will be crucial to ensuring a dependable natural gas supply for the plant.

NMDC Highlights Commitment to Sustainable Industrial Growth

NMDC Chairman and Managing Director Amitava Mukherjee described the agreement as an important milestone in the company’s efforts to make its operations cleaner and more sustainable.He said the transition to natural gas at Nagarnar would help substantially reduce emissions while strengthening the efficiency and competitiveness of NMDC’s pellet operations.

According to Mukherjee, the initiative reflects the company’s commitment to combining environmental responsibility with long-term industrial growth. The adoption of natural gas is expected to support more efficient industrial processes while contributing to NMDC’s broader sustainability objectives.

Benefits of Switching from Furnace Oil to Natural Gas

The transition from furnace oil to natural gas is expected to deliver several operational and environmental benefits for NMDC’s Nagarnar pellet plant.

Lower emissions: Natural gas can help reduce emissions compared with furnace oil, depending on operating conditions and the overall fuel-use system.

Improved process efficiency: A reliable natural gas supply is expected to support efficient pellet plant operations.

Better product quality: Improved control over industrial heating processes can contribute to consistent product quality.

Long-term cost competitiveness: The fuel transition may strengthen the plant’s cost competitiveness, depending on gas prices, infrastructure costs and operating requirements.

Stronger energy infrastructure: The planned pipeline connectivity and gas receiving and metering station will support reliable fuel delivery to the facility.

The agreement also represents a step towards expanding natural gas infrastructure in the Jagdalpur region, potentially supporting the wider adoption of cleaner industrial energy sources.

About NMDC Limited

NMDC Limited is a Government of India-owned mining company under the Ministry of Steel. It is one of the country’s major iron ore producers and operates across the mining and mineral value chain. The company also focuses on strengthening its operational capabilities and supporting sustainable industrial development.

About GAIL Gas Limited

GAIL Gas Limited is a subsidiary of GAIL (India) Limited, a major public-sector natural gas company. GAIL Gas develops and operates city gas distribution networks and related natural gas infrastructure, supporting the supply and use of natural gas across industrial, commercial and other consumer segments.

https://indianmasterminds.com/news/nmdc-gail-gas-rlng-supply-agreement-nagarnar-pellet-plant-243826/

show less

Petronet LNG to participate in investor roadshow in Hong Kong

Petronet LNG Limited, a major player in the Indian natural gas sector, has announced its plans to participate in an investor roadshow scheduled to take place in Hong Kong. The event, organised by UBS Securities India Pvt Ltd, will occur on 6th November 2026. This disclosure comes as part of the company’s adherence to Regulation 30 of the Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015.

SHOW MORE

The company has stated that the format of the meeting will include both one-to-one and group meetings, providing an opportunity to engage directly with institutional investors and analysts. Such interactions are critical for companies like Petronet LNG Limited as they offer a platform to discuss business strategies, operational updates, and future growth prospects.

While the investor roadshow is an integral part of Petronet’s investor communication strategy, the company has emphasised that no unpublished price sensitive information will be disseminated during the discussions. This commitment ensures compliance with regulatory standards and maintains market integrity.

Petronet LNG Limited operates two major liquefied natural gas (LNG) terminals in India, located in Dahej, Gujarat and Kochi, Kerala. The company’s participation in international investor roadshows signals its commitment to transparent communication with global stakeholders and its interest in expanding its influence and understanding within international markets.

The upcoming roadshow in Hong Kong is a part of Petronet LNG’s continuous efforts to engage with analysts and investors, promoting a better understanding of its business operations and financial performance. Such events are also crucial in fostering investor confidence and strengthening the company’s position in the competitive energy sector.

https://businessupturn.com/business/petronet-lng-to-participate-in-investor-roadshow-in-hong-kong/

show less

Mahanagar Gas signs MoU to explore biogas projects in Maharashtra, Karnataka

Mahanagar Gas (MGL) has signed a Memorandum of Understanding (MoU) with Organic Recycling Systems (ORSL) to explore opportunities in the compressed biogas (CBG) value chain across Maharashtra and Karnataka.

SHOW MORE

The partnership will focus on evaluating potential CBG projects using agricultural waste, organic food waste and other organic feedstocks. The companies will also assess project feasibility, techno-commercial viability, project development and potential CBG offtake arrangements.

Mahanagar Gas to explore CBG opportunities

The MoU aims to combine Mahanagar Gas’ expertise in city gas distribution with Organic Recycling Systems’ capabilities in organic waste processing and CBG project development.

Through the collaboration, the companies will explore commercially viable CBG projects and potential offtake opportunities in Maharashtra and Karnataka.

MoU is non-binding

The agreement is non-binding and does not specify any consideration or definitive investment commitment. Any future commercial arrangements, including engineering, procurement and construction (EPC) contracts, will be subject to feasibility studies, due diligence, mutual agreement, requisite approvals and definitive agreements, wherever applicable.

https://www.financialexpress.com/business/industry-mahanagar-gas-signs-mou-to-explore-biogas-projects-in-maharashtra-karnataka-4366707/

show less

IGL Director Mohit Bhatia Addresses 10th LNG India Summit on Gas Security

Mr. Mohit Bhatia, Director (Commercial), Indraprastha Gas Limited, delivered the inaugural address at the 10th LNG India Summit in New Delhi, highlighting strategies for India’s gas security through diversified LNG sourcing and Compressed Biogas.

SHOW MORE

New Delhi: Mr. Mohit Bhatia, Director (Commercial), Indraprastha Gas Limited (IGL), delivered the inaugural address at the 10th LNG India Summit being held on 14–15 October 2026 at The Lalit, New Delhi.

The summit is being organised under the theme “Commemorating a Decade of Impact, Innovation and Energy Transition.”

Speaking on the topic “Sourcing LNG for India’s Gas Security of Supply in a Volatile and Changing Global LNG Landscape,” Mr. Bhatia shared perspectives on strengthening India’s energy security through diversified LNG sourcing, flexible procurement strategies, resilient gas infrastructure and competitive pricing.

He emphasised that energy security must extend beyond the mere availability of supplies to ensuring affordability, reliability and accessibility for end consumers.

Mr. Bhatia also highlighted the growing role of Compressed Biogas (CBG) in reducing import dependence, promoting the circular economy and complementing LNG as a key pillar of India’s gas security strategy. He underscored the importance of an integrated, future-ready gas ecosystem in which imported LNG, domestic natural gas and indigenous renewable gases work together.

https://www.psuconnect.in/psu-news/igl-director-mohit-bhatia-addresses-10th-lng-india-summit-on-gas-security

show less

IGL rolls out AI system to check CNG cylinder safety at pumps

NEW DELHI: To prevent CNG vehicles without a valid cylinder hydrotest certificate from refuelling, Indraprastha Gas Ltd (IGL) on Thursday launched an artificial intelligence-enabled vehicle recognition system at 10 CNG stations in the capital.

SHOW MORE

The system uses station cameras to capture vehicle registration numbers, which are processed through an AI application linked to the online Petroleum and Explosives Safety Organisation (PESO) portal to verify the hydrotest status of CNG cylinders. “If a cylinder’s certification has expired or is invalid, automated alerts are immediately sent to station staff via handheld devices, LED displays and public announcement systems, enabling quick action before refuelling,” IGL said.

The AI system supplements the existing manual checks carried out by station staff. CNG cylinders must undergo hydrotesting once every three years at PESO-approved testing centres. Following a cylinder blast at a retail outlet in the capital in Aug, PESO had asked all city gas distribution companies to strictly enforce safety norms at CNG stations. The vehicle involved in the blast had additional cylinders illegally mounted on it.

IGL said the system would soon be installed at all its CNG stations across Delhi-NCR and other cities under its jurisdiction. The company operates over 300 CNG stations across 12 geographical areas covering 32 districts in Delhi, Uttar Pradesh, Haryana and Rajasthan. CNG is also available at nearly 650 petrol pumps operated by oil marketing companies.

The pilot project was launched by PESO joint chief controller of explosives (north circle) Sanjay Kumar Singh at the Shantipath CNG station.

IGL director (marketing) Kumar Shanker said every vehicle entering an IGL station should undergo prescribed safety checks to protect customers, employees and the public.

IGL said it had also strengthened its safety management plan for CNG station operations, with mechanisms to monitor compliance, identify violations, take corrective action and enforce penalties where necessary.

https://timesofindia.indiatimes.com/articleshowprint/134971405.cms

show less

Policy Matters/ Gas Pricing/ Others

PNGRB revises fee rules for gas, petroleum sector; civil penalty of up to Rs 1 crore for each violation

Under the amended rules, entities that violate the regulations may face civil penalties, and their operations may also be suspended or terminated, subject to the applicable provisions and prescribed procedure. The Petroleum and Natural Gas Regulatory Board (PNGRB) has amended its fee and other charges regulations for the gas and petroleum sector, introducing revised charges for installations and pipeline projects, new processing fees and provisions for civil penalties of up to Rs 1 crore for each contravention.

SHOW MORE

The amendments to the Petroleum and Natural Gas Regulatory Board (Levy of Fee and Other Charges) Regulations, 2007, were notified on October 16, 2026. The revised regulations will come into force from the date of their publication in the Official Gazette.

Under the amended rules, entities that violate the regulations may face civil penalties, and their operations may also be suspended or terminated, subject to the applicable provisions and prescribed procedure.

PNGRB’s new penalty provisions

The amended regulations distinguish between authorised entities and other entities in dealing with defaults and non-compliance.

Authorised entities that fail to comply with the regulations will be treated as defaulting entities under the applicable PNGRB authorisation regulations governing city or local natural gas distribution networks, natural gas pipelines, and petroleum and petroleum products pipelines. The Board may also impose civil penalties under Section 28 of the PNGRB Act, 2006, in addition to action under the Act’s provisions on offences and punishment.

For other entities, the Board will issue a notice and provide an opportunity to be heard. If an entity fails to offer a reasonable justification for the default or non-compliance, the Board may impose a civil penalty of up to Rs 1 crore for each contravention. In case of continuing non-compliance, an additional penalty of up to Rs 10 lakh per day may be imposed.

“In case the entity fails to provide reasonable justification for such default and/or non-compliance, the Board may, after giving such entity an opportunity of being heard, by order in writing, direct that, without prejudice to any other penalty which the entity may be liable for, such entity shall pay, by way of civil penalty, an amount which shall not exceed one crore rupees for each contravention, and in case of a continuing failure, additional penalty which may extend to ten lakh rupees for every day,” the notification read.

If an entity fails to comply with the Board’s directions, further action may be taken under the applicable provisions of the Act. Payment of a penalty will not exempt an entity from paying other applicable charges or surcharges.

Annual charges for gas and petroleum installations

The amendments specify annual charges for different types of installations.

The amended regulations revise the charges applicable to natural gas and petroleum and petroleum products pipelines.

Before the commencement of operations, the charge will be Rs 5 lakh for each pipeline longer than 50 km and Rs 1 lakh for each pipeline up to 50 km.

After operations commence, the charge will be the higher of the prescribed minimum amount or 0.02 per cent of revenue, excluding taxes, for the immediately preceding financial year. The minimum charge will be Rs 5 lakh for pipelines longer than 50 km and Rs 1 lakh for pipelines up to 50 km.

For the first financial year, when revenue from the preceding financial year is unavailable, the charge will be calculated on projected revenue. The difference between the amount paid and the amount payable will subsequently be adjusted when payment is made for the next financial year.

New processing fees for pipeline projects

The revised rules introduce additional processing fees for certain pipeline-related applications.

A processing fee of Rs 5 lakh per request will apply from the fourth application onwards for an extension of the project completion schedule for natural gas pipeline (NGPL) and petroleum and petroleum products pipeline (PPPL) projects.

For dedicated pipeline processing requests covered by the amendment, a fee of Rs 5 lakh per request has been prescribed. A fee of Rs 1 lakh per request will apply for tie-in connectivity from a compressed biogas (CBG) source located within 50 km of a pipeline or for a decompression unit near a natural gas pipeline operating as a common carrier or contract carrier.

PBG reduction applications to attract fees of up to Rs 10 lakh

Entities seeking a reduction in their performance bank guarantee (PBG) will have to pay a processing fee based on the value of the PBG.

The fee must be submitted along with the application for PBG reduction. If the Board’s verification concludes that the PBG amount should not be reduced, the processing fee will not be refunded.

Reference to latest Census of India

The amendment replaces references to the 2011 Census of India in the relevant provisions and Form I with the words “Latest Census of India”.

The changes form part of the amendments to the existing fee and other charges framework governing entities and projects regulated by the PNGRB.

https://www.zeebiz.com/economy-infra/news-pngrb-revises-fee-rules-for-gas-petroleum-sector-civil-penalty-of-up-to-rs-1-crore-for-each-violation-404188

show less

PNGRB clears IGX platform to book unused LNG regasification capacity

Oil and gas regulator PNGRB has approved a proposal by the Indian Gas Exchange (IGX) to introduce a platform for listing and booking unutilised liquefied natural gas (LNG) regasification capacity, in a move aimed at improving infrastructure utilisation and widening access to the country’s gas market.

SHOW MORE

The Petroleum and Natural Gas Regulatory Board (PNGRB) said the voluntary platform would allow LNG terminal operators and capacity holders to list unused capacity, enabling prospective users to identify and book available slots according to their requirements.

The initiative comes as several LNG terminals report low capacity utilisation, leaving scope to attract additional cargoes by offering unused regasification capacity at competitive charges. Regasification is the process of converting LNG, transported in liquid form, back into gas for supply through pipelines.

The platform is expected to improve price discovery for regasification services by providing a transparent mechanism through which available capacity can be listed and accessed. Buyers will also be able to indicate their capacity requirements, helping market participants better match available infrastructure with demand.

IGX will facilitate capacity bookings, while commercial negotiations, payment settlements and risk management will remain directly between buyers and sellers under their respective agreements. Participation by terminal operators, capacity holders and prospective users will be voluntary.

PNGRB said the initiative would complement its earlier decision to reduce the number of natural gas pipeline tariff zones to two, a measure intended to improve the competitiveness of LNG terminals located farther from consumption centres.

The combined measures could help make better use of existing gas infrastructure by easing access to regasification capacity and improving the economics of sourcing LNG through different terminals.

India has been seeking to expand the role of natural gas in its energy mix, making efficient use of LNG import terminals and pipeline infrastructure important to improving supply flexibility. However, the extent to which the new platform boosts utilisation will depend on the availability of unutilised capacity, the competitiveness of regasification charges and demand from prospective users.

The proposed facility preserves the bilateral nature of commercial arrangements while introducing an organised exchange-based mechanism for identifying and booking available capacity, PNGRB said.

(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)

https://www.business-standard.com/industry/news/pngrb-clears-igx-platform-to-book-unused-lng-regasification-capacity-126101600740_1.html

show less

Govt to launch AgriPV support scheme, 5 GW capacity possible: MNRE secy

The government will soon launch a new central sector scheme to support solar power capacity creation using agriphotovoltaic (AgriPV) technology to bridge the 25-30 per cent higher cost of setting up such plants, Santosh Kumar Sarangi, secretary, Ministry of New and Renewable Energy (MNRE), said on Monday.

SHOW MORE

Briefing the media on the upcoming AgriVoltaics World Conference 2026 here, he said it may be possible to set up around 5 gigawatts (GW) of AgriPV solar capacity over the next three to four years, depending on the enthusiasm of state governments in notifying feed-in tariffs for such plants.

 “In order to nudge all the states and to provide them with some kind of an initial incentive we are planning for a central sector scheme which will support AgriPV. We will probably make it part of one of our existing schemes, as and when they get revised,” Sarangi said.

He also added that MNRE is working with the Ministry of Finance to work out the details of the support scheme and how states could be incentivised to launch different AgriPV models. He said it is yet to be decided whether it will be launched as an upgrade under the existing PM-KUSUM scheme for farm-level solarisation or as a standalone initiative.

“In AgriPV, due to the tilted structure, the additional cost is of the civil infrastructure. This makes projects 25-30 percent more costly as compared to conventional ground-mounted solar. So, our objective will be to meet this cost gap under AgriPV. The broad idea is to nudge the states to take it to scale so that it becomes competitive over time and tariffs become commercially more viable,” he said.

https://www.business-standard.com/economy/news/govt-to-launch-agripv-support-scheme-5-gw-capacity-possible-mnre-secy-126101901005_1.html

show less

PNGRB Panel Seeks Tougher River-Crossing Standards and Backup Gas Supply After Pipeline Failures

Floods and shifting rivers have exposed weaknesses in pipeline crossings, while damage to a single feeder can interrupt gas supply across a city. A high-level expert committee recommends changes to pipeline design, monitoring and city-gas contingency planning

SHOW MORE

Key Details

PNGRB’s Report of the High-Level Expert Committee examines recent damage to natural-gas and petroleum-product pipelines and proposes two connected responses: protect vulnerable stretches more effectively and keep supplies moving when a pipeline fails.

The committee was formed after pipeline exposure and ruptures associated with natural calamities. Its central finding is that a pipe can remain intact while the ground protecting it changes: floods scour riverbeds, erode banks and leave buried sections exposed or unsupported.

Some failures occurred beyond the ends of underground drilled crossings. That matters because a crossing designed around an earlier estimate of a river’s width may not protect the pipeline if the channel later shifts. The committee proposes longer crossings, more conservative assessments of flooding and erosion, and stronger protection where pipelines run close to rivers. It also recommends avoiding open-cut river crossings except where a technical case is formally approved.

Local Damage Has Disrupted Gas Supply Far Beyond the Failure Site

The consequences extend beyond repair of the damaged pipe. An August 2025 rupture on the Karanpur–Moradabad–Kashipur–Rudrapur gas pipeline disrupted supply to 97 industries, more than 56 commercial customers and 19 compressed natural gas (CNG) stations. Another rupture on the Dadri–Bawana–Nangal pipeline affected 464 industries, more than 176 commercial customers and 21 CNG stations.

Not every threat came from flooding. The committee also examined damage caused by third-party construction work, underscoring the need for coordination between pipeline operators and agencies working near buried lines. These cases show why physical safety and continuity of supply need to be planned together.

City-Gas Networks Need Ways Around a Failed Feeder

A city-gas distribution network may depend heavily on one upstream pipeline. The committee recommends that operators progressively build looped networks and multiple supply connections, so gas can be redirected when one route is unavailable. It also proposes links between neighbouring service areas, backup compressed or liquefied gas supplies where feasible, and plans identifying which consumers would receive priority during an interruption.

The recommendations would add supply-continuity measures to PNGRB’s technical standards and emergency-response planning. They have not yet amended those requirements.

What Is a Trenchless Crossing? A pipeline can be drilled or tunnelled beneath a river instead of being laid through an excavated riverbed. The committee’s concern is not only how deep such a crossing runs, but whether it extends far enough beyond the river’s possible future course.

https://www.policyedge.in/p/pngrb-panel-seeks-tougher-river-crossing-standards-and-backup-gas-supply-after-pipeline-failures

show less

Hydrogen in your kitchen gas? Petroleum regulator PNGRB proposes up to 5% blending in household piped gas; details here

PNGRB proposes up to 5% hydrogen blending in limited domestic piped-gas networks, subject to technical checks and approvals. The draft guidelines also specifically address the impact of hydrogen blending on consumer billing.

SHOW MORE

The Petroleum and Natural Gas Regulatory Board (PNGRB) has proposed allowing up to 5% hydrogen blending in natural gas supplied to households through domestic piped natural gas (PNG) networks, according to its draft guidelines.

The proposal outlines a framework for introducing hydrogen into selected portions of existing gas distribution networks, subject to technical assessments, safety requirements and regulatory approvals. However, the draft does not by itself authorise commercial hydrogen blending.

 “This draft does not by itself authorise commercial hydrogen blending. Applicability is subject to statutory enablement, PNGRB approval and all other competent-authority permissions,” the document states.

The regulator has proposed restricting the initial deployment to small, hydraulically defined areas supplied through a single injection point. The proposed framework is limited to domestic PNG consumers and does not cover the entire city gas distribution networks.

What will change for households?

Under the draft guidelines, hydrogen could be mixed with natural gas before being supplied to households through existing PNG networks. However, the proposal does not mean that every household connected to a piped gas network will immediately receive a hydrogen blend.

PNGRB has specified that the proposed deployment must be confined to areas where the blended supply can be controlled and monitored. Injection at a District Regulating Station that cannot ensure the supply is restricted to domestic consumers has been excluded at this stage.

The draft also clarifies that the 5% limit is a ceiling rather than the routine operating level.

“Five per cent is the maximum commercial concentration, not the routine control target,” it states, adding that normal operating levels must be lower and determined through validated technical assessments.

 “No commercial supply under these guidelines shall exceed 5.0%,” the document adds.

What about household appliances and safety?

PNGRB’s draft requires operators to assess whether existing pipelines, meters, regulators and other equipment are compatible with hydrogen blending before introducing the mixture.

The assessment would also cover household appliances connected to the network. The document says the experience of pilot projects in Indore and Shantigram cannot be treated as universal proof that every gas network and appliance is suitable for hydrogen blending.

The proposed framework also requires continuous monitoring of hydrogen concentration, gas flow, pressure and other relevant parameters.

According to the draft, hydrogen supply must be automatically isolated in situations such as invalid concentration measurements, hydrogen levels reaching the specified high-high limit, loss of natural gas flow, gas detection or fire alarms, emergency shutdowns, unsafe pressure or temperature conditions, and loss of essential control systems or power.

Will consumers’ gas bills change?

The draft guidelines specifically address the impact of hydrogen blending on consumer billing.

“Consumer billing shall account for the reduction in heat content attributable to hydrogen blending so that consumers are not charged for energy not delivered,” the document states.

The proposed framework also requires operators to disclose the basis of billing adjustments. Where the necessary data is unavailable or inaccurate, the draft calls for a consumer-favourable estimate.

When could hydrogen blending begin?

The draft makes clear that commercial supply would require statutory and policy enablement, specific PNGRB approval and permissions from other competent authorities.

Before the first supply, operators would ordinarily have to provide consumers with at least 30 days’ notice. The proposed information would include the hydrogen concentration, changes in gas characteristics, appliance-related precautions, emergency procedures, billing adjustments and complaint channels.

The guidelines also prescribe a minimum six-month trial operation, with monthly reporting and independent verification. Completion of six months alone would not automatically permit routine commercial supply. Operators would need written confirmation from PNGRB.

The regulator has also clarified, “These guidelines do not by themselves create a right to blend or commercially supply hydrogen.”

https://www.livemint.com/news/india/hydrogen-in-your-kitchen-gas-petroleum-regulator-pngrb-proposes-up-to-5-blending-in-household-piped-gas-details-here-11791982794724.html

show less

LNG Use / LNG Development and Shipping

Oman replaces US as India’s top LNG supplier, overall LNG imports robust despite Hormuz hit

India’s liquefied natural gas (LNG) import slate underwent a discernible reshuffle in September with the US slipping a couple of positions from the top supplier spot — which it had secured in recent months following the outbreak of the West Asia conflict — as European importers stepped up competition for American cargoes. Nonetheless, New Delhi continued to import higher volumes of super-chilled gas on a year-on-year basis from a diversified pool of sources despite the disruption in supplies through the Strait of Hormuz crisis.

SHOW MORE

Robust LNG demand in India has led to Indian importers competing hard to pick up cargoes from the spot market at super-normal prices, even as some of the other major Asian LNG buyers have curtailed imports. The West Asia crisis has pushed India to secure cargoes from non-hormuz dependent supply sources, as New Delhi has been prioritising supplies over price considerations amid demand from various sectors, which include city gas distribution (CGD), fertiliser, power, and ceramics.

Robust LNG demand in India has led to Indian importers competing hard to pick up cargoes from the spot market at super-normal prices, even as some of the other major Asian LNG buyers have curtailed imports. The West Asia crisis has pushed India to secure cargoes from non-hormuz dependent supply sources, as New Delhi has been prioritising supplies over price considerations amid demand from various sectors, which include city gas distribution (CGD), fertiliser, power, and ceramics.

According to tanker data, Oman and Nigeria topped the list of LNG suppliers in September, followed by the US. In August, the US was the top supplier to India, followed by Nigeria, Oman, and the UAE. Imports from the UAE rose significantly on a sequential basis in September, and volumes from Qatar also saw an uptick, reflecting the growing risk appetite of these Gulf states in sending their cargoes through the fraught waters of the strait, according to trade sources. Prior to the West Asia conflict, Qatar was India’s top source of LNG, while the UAE and the US frequently traded the second and third places between them.

LNG imports from the US in September declined 60.7% month-on-month to 0.34 million tonnes, while volumes from Oman rose 11.6% to 0.59 million tonnes, according to vessel tracking data from commodity market analytics firm Kpler. Imports from Nigeria declined 35.1% from August to 0.35 million tonnes, while those from the UAE rose 27.3% to 0.31 million tonnes.

LNG imports from Qatar rose 6.7% sequentially to 0.1 million tonnes in September, but were down 88.5% year-on-year. India’s total LNG imports in September were down 12.7% month-on-month at 2.24 million tonnes, largely due to seasonal demand fluctuations. On a year-on-year basis though, September LNG imports were 7% higher.

According to industry insiders and experts, the UAE has been able to export sizeable cargoes despite the Hormuz blockade using tactics like switching off the LNG tankers’ transponders to avoid detection and capitalising on windows of opportunity based on maritime security assessments in the region. While Qatar has also exported some cargoes using this strategy, the UAE has been far more aggressive, displaying a higher risk-tolerance.

India depends on LNG imports to meet about half of its natural gas requirement, and about 60% of those imports came through the critical maritime chokepoint of the Strait of Hormuz, primarily from Qatar and also the UAE. The two Gulf countries are major LNG exporters at the global level as well. Unlike Qatar and the UAE, Oman’s LNG exports don’t depend on the strait.

Story continues below this ad

“September LNG imports were also supported by higher gas-fired power generation, as weaker hydropower availability and stretched coal-fired generation increased the call on gas despite the power sector’s high price sensitivity. We expect India’s LNG demand to remain resilient through the end of 2026 despite elevated prices, as growing city-gas consumption, including LPG-to-PNG (liquefied petroleum gas to piped natural gas) switching, and declining domestic natural gas production sustain import requirements,” said Sonal Ranjan, LNG and natural gas analyst at Kpler.

“While elevated Asian spot LNG prices should constrain discretionary demand in the industrial sector, these underlying requirements provide a firmer floor for imports,” Rajnan said. According to her, India is competing hard for LNG cargoes in the international market, while other major Asian buyers like China, Japan, and South Korea aren’t buying as much in the current high-price environment, and are curbing natural gas use by shifting to alternative fuels. China is also buying LNG from Russia. India and most other large importers don’t import Russian LNG due to Western sanctions on Moscow’s LNG projects.

After falling in March and April — the first two months of the West Asia war — India’s LNG imports have trended consistently higher on a year-on-year basis. In the May-September period, super-chilled gas imports rose 17.8% year-on-year to 11.87 million tonnes, as per Kpler data.

In the five-month period, the US was India’s largest source of LNG with volumes at 3.41 million tonnes, or 28.7% of total LNG imports. US LNG import volumes during the period were almost 175% higher than the year-ago period. But over the past couple of months, aggressive pre-winter buying from European importers have altered global flows with a large number of American LNG cargoes going to Europe.

India’s LNG imports from Oman were 2.33 million tonnes, up nearly 419% year-on-year and accounting for almost a fifth of India’s LNG imports in May-September. LNG imports from Nigeria in the five-month period stood at 2.20 million tonnes, up nearly 169% year-on-year and accounting for 18.5% of India’s LNG import basket. UAE had a share of 9.3% and LNG volumes from the country declined 10.1% over May-September of last year to 1.11 million tonnes. Qatari LNG volumes crashed 90.2% year-on-year in the five-month period to 0.41 million tonnes, and had a paltry market share of 3.4%.

Although high and largely inelastic demand from critical sectors like CGD and fertilisers has ensured that LNG imports remain strong, a few other sectors, most notably power and ceramics, added to the demand for super-chilled gas due to the weather and the broader fuel supply constraints. Given the continuing limitations in supplies via the Strait of Hormuz, LNG prices are likely to remain higher and could push some of the more price-sensitive sectors to alternative fuels.

https://indianexpress.com/article/business/oman-replaces-us-india-lng-imports-hormuz-hit-10920946/

show less

Electric Mobility/ Hydrogen/Bio-Methane

HYDGEN inaugurates 20 MW green hydrogen electrolyser facility in Mangaluru

Mangaluru, October 15, 2026: HYDGEN marked a significant milestone in India’s green hydrogen sector by inaugurating its new electrolyser manufacturing facility at Ganjimutt, Mangaluru, with an annual production capacity of 20 MW. The company also unveiled its 250 kW Anion Exchange Membrane (AEM) and Proton Exchange Membrane (PEM) electrolysers, designed, assembled and tested in Mangaluru to meet the growing demand for hydrogen production.Track Sea Cargo.

SHOW MORE

The facility was inaugurated, and the new electrolysers were unveiled, by the chief guests, Captain Brijesh Chowta, Hon’ble Member of Parliament, Lok Sabha, and Dr. Y. Bharath Shetty, Hon’ble MLA, Mangaluru City North, during HYDGEN Innovation Day 2026, held at the company’s manufacturing facility in Ganjimutt.

The inaugural event was attended by Dr. Michael Gryseels, Co-Founder and Chairman of HYDGEN; Mohammad Shoeb Ali, Founder and Managing Partner of Transition VC; Dr. Avishek Kumar, Founder and CEO of AAGM; Dr. Goutam Kumar Dalapati, Co-Founder and Chief Technology Officer of HYDGEN; Dr. Krishna Kumar, Co-Founder and Chief Operating Officer of HYDGEN; and Ms. Ramyasri DS, Corporate Director of HYDGEN, along with other members of the HYDGEN team, industry representatives and invited guests.

Addressing the gathering, Captain Brijesh Chowta highlighted the importance of the “Back to Ooru” initiative, which encourages professionals and entrepreneurs to return to their hometowns and contribute to regional development. He welcomed and congratulated HYDGEN’s promoters, directors and the entire team for establishing and expanding their venture in Mangaluru. He expressed hope that the company’s growth would create more employment opportunities for local people and contribute to the region’s economic development.Buy Maps

In his introductory address, Dr. Michael Gryseels thanked the HYDGEN team for their dedication and contribution to the company’s progress. He emphasised that the achievements being presented at Innovation Day reflected the consistent efforts of the team, much of which takes place behind the scenes.

Explaining the significance of the event, Dr. Gryseels said that HYDGEN Innovation Day was intended to foster open discussions, practical learning and new partnerships. He encouraged participants to ask questions, challenge assumptions and share their experiences, noting that their feedback would help the company develop better products and make more informed decisions.

Dr. Y. Bharath Shetty congratulated the HYDGEN team on establishing a manufacturing facility in Ganjimutt, within his constituency of Mangaluru City North. He welcomed the company’s investment in the region and wished the team continued success in its future endeavours.

Shri U. T. Khader, Hon’ble Minister for Health and Family Welfare, Govt. of Karnataka, conveyed his best wishes to the HYDGEN team through a message, expressing his support for the company’s initiative. Although he was unable to attend the inaugural event, he extended his congratulations and wished the team continued success in its future endeavours.

Mohammad Shoeb Ali, Founder and Managing Partner of Transition VC, congratulated the HYDGEN team for their hard work, dedication and commitment in bringing the company to new heights. He appreciated the team’s efforts in advancing hydrogen technology and establishing a state-of-the-art manufacturing facility in Mangaluru, wishing HYDGEN continued success and growth in its future endeavours.

Dr. Avishek Kumar, Founder and CEO of AAGM, spoke about the significance of HYDGEN’s new electrolyser manufacturing facility at Ganjimutt, Mangaluru, highlighting its potential to strengthen hydrogen technology development and industrial manufacturing in India. He congratulated the HYDGEN team on this important milestone and wished the entire team continued success, growth and excellence in its future endeavours.

Industry is already making that switch. In the last 12 months, HYDGEN has executed 20+ projects across India, Singapore and Thailand and recorded over USD 1 million in sales. The Ganjimutt facility is built for the next stage of that demand: larger systems, more customers, and a local base of component suppliers here in Mangalore, serving customers in India and abroad.

The day opens with a tour of the facility, where guests walk through stack assembly, system integration, testing and hydrogen quality checks, all on one site. Dr. Ashish Lele, Director, CSIR–National Chemical Laboratory, Pune, delivers the keynote address on how hydrogen technologies in India move from the lab into commercial use. Expert talks and panel discussions follow on taking membrane electrolysers from pilot units to multi-MW plants, where on-site hydrogen is already paying off for industry, and how to finance lower hydrogen costs.

A day Programme attended by policymakers, government officials, researchers, academics, investors and entrepreneurs from across India.

https://newskarnataka.com/mangaluru/hydgen-inaugurates-20-mw-green-hydrogen-electrolyser-facility-in-mangaluru/15102026/

show less

India and South Korea explore cooperation in nuclear energy, green hydrogen

Seoul,  (IANS) India and South Korea continue to explore areas of cooperation in environment and energy transition, including nuclear energy, green hydrogen and renewable energy, the Indian Embassy in Seoul said on Thursday

SHOW MORE

India’s Ambassador to South Korea, Gourangalal Das, met Kim Jung-ho, Chairman of the Environment, Climate, Energy and Labour Committee of the National Assembly.

“Ambassador met Chairman of the Environment, Climate, Energy and Labour Committee of the National Assembly, Kim Jung-ho and explored areas of cooperation between India and the ROK in the domain of environment, energy transition including nuclear energy, green hydrogen and renewable energy,” the Embassy posted on X.

The Indian envoy has held a series of meetings with South Korean lawmakers in recent weeks.

Latest news updates

Ambassador Das held a meeting with members of the South Korea-India Parliamentary Friendship Group in the National Assembly on September 15, with discussions held on ways to further strengthen parliamentary, cultural and people-to-people ties.

“Strengthening India-ROK Parliamentary Ties. Ambassador met with members of the ROK-India Parliamentary Friendship Group in the National Assembly, including Chairperson Yun Ho-jung, Vice Chairpersons Moon Jeong-bog and Yoon Young-seok, and Members Kim Young-jin and Kim Jung-ho. They explored ways to further strengthen the parliamentary, cultural and people-to-people ties between the two countries,” the Indian Embassy in South Korea had posted on X.

On September 3, Gourangalal Das met the Chairperson of the Trade, Industry, Energy, Small and Medium-sized Enterprises (SMEs) and Startups Committee, Kim Seong-won, and discussed strengthening economic and commercial relations, supply chain cooperation, clean energy and promoting SMEs and startups of both nations.

“Ambassador met Rep. Kim Seong-won, Chairperson of the Trade, Industry, Energy, SMEs and Startups Committee and exchanged views on a wide range of issues of mutual benefit, including strengthening economic and commercial relations, supply chain cooperation, clean energy and promoting SMEs and Startups of both countries,” the Indian Embassy in South Korea posted on X. –IANS

https://ianslive.in/india-and-south-korea-explore-cooperation-in-nuclear-energy-green-hydrogen–20261015201257

show less

Delhi CM inaugurates ₹16-crore biogas plant in Najafgarh

Chief minister Rekha Gupta on Monday launched a biogas plant with a processing capacity of 200 tonnes per day at Goyla in southwest Delhi’s Najafgarh. The plant has been built by Municipal Corporation of Delhi (MCD), at a cost of ₹16 crore, and is supposed to ensure scientific processing of cattle dung, preventing it from flowing into Yamuna through drains, officials said.

SHOW MORE

At the launch event, CM Gupta said previous governments did not pay enough attention to basic facilities such as drainage system, water supply, garbage collection and cow dung collection in Delhi’s dairy colonies. “No biogas plant was set up in Delhi for years, leaving the problem of cow dung management unresolved. The present government has started work at three biogas plants in the past 18 months, while work is underway to establish six more. Nangli Sakrawati plant had used 55,000 tonnes of cow dung in a year, for which farmers had been paid ₹3.5 crore,” she added.

Gupta said ₹50 crore in the Budget had been allocated to improve drainage systems in Delhi’s dairy colonies. “Instead of allowing cow dung to flow into drains, converting it into clean fuel and organic fertiliser demonstrates the effective use of resources. Cleaning the river alone is not enough, effective action must also be taken against factors that cause pollutants to reach there,” the CM said.

According to officials, the Goyla plant is expected to generate around 14,000 cubic metres of raw biogas and approximately 5.6 tonnes of purified compressed biogas every day. The gas will be supplied to Indraprastha Gas Limited through a pipeline. The biogas slurry left after processing will be used as an organic fertiliser, helping improve soil fertility.

The initiative will thus convert cow dung into a useful resource, supporting clean energy production, agricultural benefits and efforts to prevent pollution of the Yamuna, officials said.

According to MCD estimates, authorised dairies in Delhi house 123,164 cattle while there are more than 500 unauthorised gaushalas, cumulatively generating around 1,500 tonnes of dung every day. Of this, only about 200 tonnes is being processed, as per a livestock enumeration submitted as part of Yamuna clean-up, being overseen by the Union home ministry.

Delhi’s first large-scale biogas plant with a processing capacity of 200 TPD, is located at Nangli Dairy in Najafgarh and was inaugurated on September 20, 2025. Another 100 TPD plant in Ghogha dairy was inaugurated last month on September 25 and Goyla Dairy is the third such plant. Delhi still faces a processing gap of 1,000 TPD.

According to the MCD data, the largest share of the cattle population — 60,210 animals — come from unauthorised dairy colonies. Government animal shelters (gausadans)– where captured stray cattle are kept– account for 19,638 cattle, while 20,776 are housed in private gaushalas. The enumeration also records 22,540 cattle in other legal dairies.

Several other projects are in the pipeline, including plants with processing capacities of 200 TPD at Ghogha, a 300 TPD facility at Ghazipur dairy and a 125 TPD plant at Bhalswa dairy. According to the MCD report, a 75 TPD plant will come up at Masoodpur dairy, 200 TPD plant at Indira Camp Sector 3 Rohini, 50 TPD plant at Sri Ram Colony in Khajoori, 100 TPD plant at Sarita Vihar, and 200 TPD plant in Indira Park in Sagarpur.

“These facilities are expected to be completed by June 2027. Once all the plants are operational, the total cattle dung processing capacity will rise to 1,625 TPD,” an official explained.

https://www.hindustantimes.com/cities/delhi-news/delhi-cm-inaugurates-16-crore-biogas-plant-in-najafgarh-101792434407157.html

show less

Green hydrogen, data centres to drive ninefold rise in combined power consumption in India by 2035: S&P Global

India’s electricity demand is expected to grow significantly by 2035, with consumption by data centres and green hydrogen production alone projected to rise nearly ninefold to around 240 terawatt-hours (TWh), reported The Economic Times, citing S&P Global. Electricity demand is projected to grow at an annual rate of 5.56% between 2025 and 2035, compared with 2.47% for overall energy demand. Consequently, electricity’s share in India’s total energy consumption is expected to increase to nearly 25% by 2035 from around 19% in 2025, the ratings agency said.

SHOW MORE

The combined electricity consumption of data centres and green hydrogen production is projected to increase nearly ninefold to around 240 terawatt-hours (TWh) by 2035, making them significant sources of additional demand. The shift towards electricity is already visible, with electric vehicles reducing dependence on fossil fuels. The trend is expected to gather pace as industries increasingly adopt electricity and green hydrogen in their production processes. Industrial expansion, higher household incomes, greater ownership of electrical appliances and rising cooling requirements are also expected to support growth in power consumption. While the electricity grid will remain the main source of supply, distributed generation is expected to account for a larger share of electricity consumption. Its contribution could rise to around 16% by 2035 from approximately 13% in 2025, S&P Global said. The agency warned that rising consumption and less predictable demand patterns would place additional pressure on India’s power infrastructure. Meeting future requirements would call for a diversified energy mix, stronger transmission and distribution networks, greater storage capacity and more flexible generation and electricity market arrangements. S&P Global also noted that India had achieved its 2030 Nationally Determined Contribution (NDC) target of 50% cumulative installed power capacity from non-fossil fuel sources ahead of schedule. The country has set a higher target of 60% for 2035. However, the agency cautioned that achieving capacity targets ahead of schedule would shift the focus towards ensuring that the power system can reliably integrate and deliver electricity from these sources.

https://bioenergytimes.com/green-hydrogen-data-centres-to-drive-ninefold-rise-in-combined-power-consumption-in-india-by-2035-sp-global/

show less

GO TOP

INTERNATIONAL NEWS

Natural Gas / Transnational Pipelines/ Others

Egypt: Chevron Reports Positive Results at Egypt’s Nargis-2 Gas Well

Chevron and Egypt’s Ministry of Petroleum and Mineral Resources reported positive results from drilling the Nargis-2 natural gas well in the Mediterranean Sea, with drilling confirming the extension of previously discovered gas-bearing formations and identifying an additional gas-bearing layer, according to a statement by the ministry on October 24.

SHOW MORE

Drilling operations began in May 2026 in cooperation with Chevron’s partners and the Egyptian Natural Gas Holding Company (EGAS). The results will support further evaluation of the Nargis discovery, made in 2022, and studies into its commercial development.

The well was drilled to a final depth of more than 5,000 metres. Evaluation results identified gas-bearing formations with a net thickness of up to 35 metres, supporting further technical studies to assess the discovery’s overall resource potential and development prospects.

The drilling programme aimed to evaluate the extension of the Nargis discovery and test deeper geological formations, including those characterised by high pressure and temperature, as part of efforts to expand exploration activities in the Mediterranean.

The results support Egypt’s strategy to accelerate the development of undeveloped discoveries, encourage investment partners to intensify exploration, and convert discovered resources into recoverable reserves, helping boost domestic natural gas production.

Minister of Petroleum and Mineral Resources Karim Badawi witnessed the start of drilling at Nargis-2 in May aboard the Stena Forth drilling vessel.

He highlighted the importance of accelerating the evaluation and development of undeveloped gas discoveries and strengthening cooperation with international energy companies.

Chevron operates the Nargis area in partnership with Italy’s Eni, the UAE’s Mubadala Energy, and Egypt’s Tharwa Petroleum.

Discovered in December 2022, Nargis field holds an estimated natural gas reserve of approximately 3.5 trillion cubic feet (tcf). Commercial operations at the deepwater asset are slated to begin production in 2025 under a partnership among Chevron, the main operator with a 45% interest; Eni’s subsidiary, IEOC, with 45%; and Tharwa Petroleum Company, which holds the remaining 10% stake.

https://egyptoil-gas.com/news/chevron-reports-positive-results-at-egypts-nargis-2-gas-well/

show less

Indonesia Begins Trimming Pipeline Gas Exports to Singapore

Indonesia is reducing natural gas exports to neighboring Singapore as President Prabowo Subianto seeks to shore up domestic supply and strengthen energy security for Southeast Asia’s largest economy.

SHOW MORE

Pipeline gas deliveries to the city-state were being cut by about 31 million standard cubic feet per day to help bolster domestic energy generation, said Djoko Siswanto, who leads SKK Migas, the government agency overseeing Indonesia’s upstream oil and gas industry. The cuts are equivalent to about 14% of Indonesia’s average pipeline-gas exports to Singapore last year, according to Bloomberg calculations based on energy ministry data compiled from SKK Migas reports.

https://www.bloomberg.com/news/articles/2026-10-24/indonesia-begins-trimming-pipeline-gas-exports-to-singapore

show less

Azerbaijan is Türkiye’s second-largest gas supplier in August

According to the data from Türkiye’s Energy Market Regulatory Authority (EPDK), Azerbaijan supplied 752.44 million cubic meters of natural gas to Türkiye in August, down 28.15% from 1.047 billion cubic meters in the same month of 2025. Iran ranked first, with its supplies rising by 9.08% year-on-year to 916.25 million cubic meters, from 840.01 million cubic meters a year earlier. Russia was Türkiye’s third-largest gas supplier, decreasing supplies by 60.6% year-on-year to 723.07 million cubic meters, compared with 1.835 billion cubic meters in August 2025.

SHOW MORE

Türkiye’s total natural gas imports fell 32.66% year-on-year to nearly 2.776 bcm in August, from around 4.122 bcm a year earlier, according to EPDK. Pipeline gas imports declined 35.75% to 2.392 bcm, while liquefied natural gas (LNG) imports fell 3.87% to 383.76 million cubic meters.

According to Azerbaijan’s State Statistics Committee, the country produced 33.4 billion cubic meters of natural gas from January through August 2026. Over the reporting period, natural gas production decreased by 177.4 million cubic meters, or 0.5%, compared with the same period last year (33.58 billion cubic meters).

Azerbaijan has also signed a long-term natural gas supply agreement with Türkiye for gas from the Absheron field. The agreement was signed in Baku by SOCAR, TotalEnergies, XRG and Türkiye’s state-owned pipeline operator BOTAŞ.

https://www.trend.az/azerbaijan/4238625.html

show less

Canadian Utilities breaks ground on 235-km Yellowhead natural gas pipeline in Alberta

(P&GJ) — Canadian Utilities has broken ground on the Yellowhead Pipeline, a 235-km (146-mile) natural gas line that will run from Peers, Alta., to Fort Saskatchewan, Alta., and deliver 1.1 Bft3d of gas to Alberta’s industrial heartland. The company called the roughly $2.9 billion project the largest in its history. Executives from Canadian Utilities and ATCO, government officials and Indigenous leaders attended the groundbreaking Tuesday.

SHOW MORE

The Alberta Utilities Commission approved the project in July, and pre-construction work has been under way since. Canadian Utilities expects the pipeline to enter service by late 2027. The company said the line was fully subscribed before the regulatory approval process finished, and that it will add capacity to a constrained system as population growth, industrial activity and power generation demand rise.

Canadian Utilities expects the pipeline to create about 2,000 direct construction jobs. It estimates that the downstream investments the line enables could support another 12,000 construction jobs and 20,000 permanent jobs annually, and add $3.9 billion a year to Alberta’s gross domestic product once operating.

Canadian Utilities CEO Bob Myles said the project shows the company’s ability to plan, finance, permit, build and operate large-scale infrastructure. Jason Sharpe, chief operating officer of ATCO Energy Systems, said the project reflects support from industry partners, contractors and Indigenous and community leaders.

https://pgjonline.com/news/2026/october/canadian-utilities-breaks-ground-on-235-km-yellowhead-natural-gas-pipeline-in-alberta

show less

Egypt: Eni, EGPC launch Meleiha Phase 2 gas project in Egypt

Workers stand on white storage tanks pointing to the blue-sky horizon at Melehia field in the western Egyptian desert. The Meleiha Phase 2 project includes new wells, gathering systems, and a dedicated export pipeline, which collectively aim to increase Egypt’s natural gas processing capacity and facilitate rapid resource monetization via exports of the country’s natural resources.

SHOW MORE

Agiba Petroleum Co.—a 50-50 joint venture of Eni SPA subsidiary IEOC Production BV and Egyptian General Petroleum Corp. (EGPC)—has initiated startup activities for its Meleiha Phase 2 project in Egypt’s Western Desert, advancing development of a gas hub in the Merged Meleiha concession.

Part of the operator’s development of a new gas hub within the Merged Meleiha concession and designed to increase processing capacity for from the area’s natural gas fields to support growth of Egypt’s domestic output, the planned installation will be equipped to process up to 100 MMcfd of gas production, Eni said in a release Oct. 20.

Planned infrastructure at the site includes development wells, gathering systems, trunklines, and a dedicated gas-export pipeline connecting new production to Egypt’s existing gas network.

Eni did not reveal a schedule for completing full startup and commissioning activities for Meleiha Phase 2, but—once completed—the company said the project will help enable the rapid monetization of Egypt’s natural resources and enhanced operational efficiency.

Western Desert development

Meleiha Phase 2 builds on Agiba’s ongoing exploration and development in the Western Desert concession. In April 2022, Eni reported that three discoveries in the Meleiha concessions had been tied into production, adding an estimated 8,500 boe/d.

The Nada E Deep 1X well encountered 60 m of net hydrocarbon pay in the Alam El Bueib and Khatatba formations. Meleiha SE Deep 1X found 30 m in the Matruh and Khatatba formations, while Emry Deep 21 encountered 35 m in Alam El Bueib.

Including discoveries made in 2021, Eni said the results brought the exploration total to eight wells, with a 75% success rate.

Agiba operates the Meleiha concession, in which it holds a 76% interest alongside partner Lukoil PJSC (24%), according to Eni’s website.

https://www.ogj.com/refining-processing/gas-processing/news/55413143/eni-egpc-launch-meleiha-phase-2-gas-project-in-egypt

show less

Australia: APA to Build Major Australia Gas Pipeline to Avert Shortfalls

APA Group reached a final investment decision on a natural gas pipeline between Queensland and New South Wales states, which could help alleviate projected shortfalls in the more heavily populated southeast of Australia.

SHOW MORE

Construction on the Bulloo Interlink Pipeline will start early next year, with commercial operations targeted for winter 2029, the company said in a filing to the Australian Stock Exchange on Thursday. The decision was supported by a five-year transport and storage agreement with retailer Origin Energy Ltd., it said.

While Australia is one of the world’s biggest exporters of liquefied natural gas, the plants and associated fields are located in the northern half of the vast nation. The Australian Energy Market Operator has said southern markets could face peak-demand shortfalls by 2029 and require additional supply from 2030 as east coast gas fields decline.

“Delivery of the BIL is critical to east coast energy security, unlocking the significant volumes of gas available in Queensland and the Northern Territory,” Chief Executive Officer Adam Watson said in the statement. “The BIL is designed to ensure pipeline capacity is not a constraint to meet projected gas demand for Australia’s southern states later this decade and into the early 2030s.”

The 340 kilometer (211 mile) link will have a capacity of 800 terajoules a day, making it one of the biggest gas pipelines in the east of the country that isn’t linked to an LNG plant. APA has committed A$920 million ($646 million) to the project.

https://www.bloomberg.com/news/articles/2026-10-21/apa-to-build-major-australia-gas-pipeline-to-avert-shortfalls

show less

UK approves development of Jackdaw gasfield in North Sea

Andy Burnham’s government has approved the development of the Jackdaw gasfield in the North Sea but ministers indicated this would not necessarily mean a green light for the larger Rosebank oilfield later this year. Energy secretary Miatta Fahnbulleh said that the Jackdaw gasfield, 150 miles east of Aberdeen, would help boost Britain’s energy supplies this winter and help to protect jobs and energy security over the longer term.

SHOW MORE

She also announced the establishment of a new Energy Wealth Fund, which will invest tax revenues from the North Sea into renewables and low-carbon energy. It will start with £2bn in seed funding from the Treasury.

But Fahnbulleh warned that Rosebank, 80 miles to the north-west of Shetland, is a “different proposition” from Jackdaw because its oil would mostly not be used in Britain. Her judgment on Rosebank is expected in December, according to officials.

“Jackdaw is producing gas that predominantly is used in the domestic market, Rosebank is a different proposition because it is oil that is exported,” Ms Fahnbulleh told BBC Radio Scotland.

Officials were asked months ago to draw up the positive case for approving both schemes as Burnham responded to criticism that climate policies have hurt British industry and energy security, the FT has been told.

But climate activists believe there is still an opportunity to convince the government to block Rosebank.

Fahnbulleh said each application would be judged “in its own right” and it was critical that any decisions were consistent with Britain’s climate obligations.

Ministers have been under pressure from the Conservatives and Reform UK, as well as US President Donald Trump, to increase fossil fuel production and scrap Britain’s net zero policies.

On Wednesday, Trump wrote on Truth Social that the approval of Jackdaw was “Great news for the wealth and prosperity of the United Kingdom”.

He added that more drilling in the North Sea “will make the UK very wealthy again. TAKE DOWN THE COSTLY AND RIDICULOUS WINDMILLS!”

Burnham has promised to be “pragmatic” on oil and gas drilling following a sharp rise in energy prices following the US-Israeli war with Iran.

Two large trade unions, GMB and Unite, have pushed ministers to approve the Jackdaw and Rosebank projects to protect jobs and bolster tax revenue.

Gary Smith, general secretary of the GMB, said Burnham’s government deserved “real credit for doing the right thing” for the UK with Jackdaw’s approval.

“GMB will continue to press for further essential measures that increase our domestic energy capacity, such as granting permission for Rosebank.”

But Jess Ralston, analyst at the Energy and Climate Intelligence Unit, a non-profit organisation focused on energy and climate issues, said the approval would not bring down UK gas and electricity bills or improve the country’s energy security substantially.

“The field is expected to supply only a minuscule share of UK gas demand for a limited period,” she added. “Against a backdrop of a summer of extreme heat, and rising public concern, eyes will now turn to the Rosebank oilfield.”

Danny Gross, climate campaigner for Friends of the Earth, said there was “nothing that justifies giving the go-ahead to a colossal new fossil fuel project in [the] North Sea”.

“Jackdaw won’t make a jot of difference to our energy bills, but it will fuel the climate chaos already unfurling in front of us,” he added.

Rosebank and Jackdaw have become a lightning rod for the wider debate around the future of the North Sea and Labour’s attitude towards an industry that directly employs about 28,000 people.

Supporters argue the fields can help meet the UK’s energy needs with lower carbon emissions than imports, but critics argue they will add to emissions and not bring down energy bills.

The government’s approval of Jackdaw was delayed while Labour competed with the Green Party in a parliamentary by-election campaign in Sir Keir Starmer’s former seat of Holborn and St Pancras. Labour won.

The two fields had their government development consents quashed in 2025 following a landmark decision by the Supreme Court, which said authorities had to take into account the greenhouse gas emissions of consumers burning the fossil fuels. Both projects secured exploration licences decades ago.

Adura, a joint venture between Shell and Equinor, is responsible for the development of Jackdaw and Rosebank.

Neil McCulloch, chief executive of Adura, the Shell and Equinor joint venture that is developing the project, said the decision “demonstrates the value of pragmatic, evidence-led decision-making”.

Jackdaw could produce 10bn cubic metres of gas, equivalent to 2 per cent of the UK’s projected gas imports between 2025 and 2050, under an optimistic scenario, according to the House of Commons Library.

The prime minister’s aides have made clear he has no plans to end Labour’s 2024 election manifesto pledge to not issue new exploration licences in the North Sea.

Instead he is expected to emphasise Labour’s support for greater use of “tiebacks”, which allow further drilling next to existing fields.

The government will set out more details about how the tiebacks will be approved in legislation set to be published this month.

https://www.ft.com/content/9cfa52b2-77cb-4b53-ad74-badd53f24fc6

show less

US Department of Energy grants $42M for gas pipeline from Pennsylvania to New York

The U.S. Department of Energy (DOE) announced it will use up to $42 million in Defense Production Act (DPA) funding to advance the development of a proposed 125-mile natural gas pipeline from Pennsylvania to New York. 

SHOW MORE

Constitution Pipeline Company’s project will transport natural gas to markets across the Northeast that currently experience limited access to the fuel. The project will also lower electricity and home heating costs across the region, the DOE said.

“Despite America having an abundant supply of low-cost natural gas, tens of millions of Americans have limited access to this reliable energy source due to a lack of pipeline infrastructure,” U.S. Secretary of Energy Chris Wright said in a news release.

“The Constitution Pipeline [is] a project that will transform the lives and economic opportunities for Americans across New York and New England. It will also reduce the risk of blackouts during periods of peak electricity demand and make our nation more secure.”

From The Working Families Tax Cut, $1 billion in federal funding has been appropriated for energy-related projects deemed critical to national security, the DOE said. Presidential Determination No. 2026-12 identifies natural gas pipelines, processing and storage as essential to national defense.

“For too long, families and businesses in New York and other blue states have paid the price for anti-energy policies that kneecap production, block critical infrastructure and drive up costs,” Secretary of the Interior Doug Burgum said. “This historic investment in New York will help deliver the reliable, secure energy Americans deserve while saving families across the Northeast billions of dollars.”

The DPA funding will support eligible pre-construction and permitting activities necessary to advance the project and, after permits are completed, the deployment of complementary natural gas infrastructure.  

https://www.mining.com/us-department-of-energy-grants-42m-for-gas-pipeline-from-pennsylvania-to-new-york/

show less

Kinder Morgan Approves $4.7B Gas Pipeline Expansions as Backlog Hits Record

U.S. pipeline operator Kinder Morgan announced Wednesday it has approved $4.7 billion in investments for two major natural gas pipeline joint ventures. According to the company, the expansion has been driven by surging demand from data centers, power plants and liquefied natural gas exporters.

SHOW MORE

The new approvals pushed Kinder Morgan’s project backlog to a record $14.4 billion, with natural gas projects accounting for $13.2 billion of the total.

The company will invest approximately $3.1 billion in Southern Natural Gas Co.’s Southeast Connector project and $1.6 billion in Natural Gas Pipeline Co. of America’s Permian Link project.

Both developments aim to expand energy infrastructure to meet growing regional consumption and technology sector needs.

The Southeast Connector project involves constructing about 470 miles of new pipeline capable of transporting up to 2.6 billion cubic feet per day of natural gas to expanding markets across the Southeastern United States.

Phase-in operations for the project are expected to begin in the fourth quarter of 2030.

The Permian Link project will span roughly 434 miles of new pipeline designed to carry about 2.8 billion cubic feet of natural gas per day.

It will connect the Permian Basin near Pecos County, Texas, to the Midcontinent system. The pipeline is scheduled to enter service in the third quarter of 2030.

According to Kinder Morgan, the Permian Link will supply gas to power providers servicing an investment-grade hyperscale data center customer.

Company executives noted during an earnings call that the project has attracted strong interest from additional potential customers beyond the initial anchor tenant.

Alongside the infrastructure announcement, Kinder Morgan reported strong quarterly financial results.

The Houston-based firm posted an adjusted profit of 35 cents per share for the quarter ended Sept. 30, topping average analyst estimates of 32 cents per share, according to LSEG data.

Shares of Kinder Morgan rose 2.7% in extended trading following the pipeline announcements and earnings beat.

https://www.pipeline-journal.net/news/kinder-morgan-approves-47b-gas-pipeline-expansions-backlog-hits-record

show less

GO TOP

Natural Gas / LNG Utilization / Bio-LNG

GTT receives order from Hanwha Ocean for LNG carrier tank design

GTT Energy has received an order from the Hanwha Ocean shipyard for the design of cryogenic tanks for two new LNG carriers. GTT Energy, the Group’s business unit dedicated to containment and energy management systems, has received, in 3Q26, an order from the Hanwha Ocean shipyard for the design of cryogenic tanks for two new LNG carriers.

SHOW MORE

Each vessel will have a total capacity of 174 000 m3. The tanks will be fitted with the NO96 Super+ membrane containment system, a technology developed by GTT.

https://www.lngindustry.com/lng-shipping/15102026/gtt-receives-order-from-hanwha-ocean-for-lng-carrier-tank-design/

show less

\

LNG terminal expansion projects in Louisiana, Texas boosted by wars

Over the past 14 months, liquefied natural gas companies have proposed new expansion projects at seven gas export terminals along the Gulf Coast, encouraged in part by wars in the Middle East and Ukraine that have boosted the market for U.S. LNG shipments.

SHOW MORE

Three of the expanding terminals are in Louisiana, including southeast of New Orleans at the Plaquemines LNG terminal; and in Cameron, in southwest Louisiana, at the CP2 and Commonwealth LNG terminals, according to public records available in the Oil & Gas Watch database. Four expanding terminals are in Texas, near Port Arthur, Brownsville and Corpus Christi.

If built, these new expansions would increase by about 14%, or 75 million metric tons per year, the capacity of U.S. LNG export terminals that are operating, under construction, or previously proposed.  The expansions and associated pipelines could also damage hundreds of acres of fragile coastal wetlands and release millions of tons of greenhouse gases, according to permit applications.

“These gas export facilities are a radical transformation of the Louisiana coast,” said Anne Rolfes, director of the Louisiana Bucket Brigade. “This coastal area, including our wetlands, protects south Louisiana from storms, a crucial buffer as hurricanes get more fierce. Now that protection is paved over, transformed into concrete so that an out-of-state corporation can make money.”

Developers of the LNG projects argue that the wars in Iran and Ukraine are contributing to increasing market demand overseas for U.S. LNG exports, and the new expansions of Gulf Coast export terminals would help meet that rising need.

 “Recent disruptions to LNG exports through the Strait of Hormuz are increasing demand for LNG cargoes from outside the strait,” Venture Global, which is building the CP2 LNG expansion project near Cameron,  said in its May 26 application to the Federal Energy Regulatory CommissionCommittee.

Overall, nine LNG export terminals have been built across the U.S. over the past 10 years. The industry’s rise was driven by the proliferation of new drilling techniques, including hydraulic fracturing and horizontal drilling, which dramatically expanded production of natural gas from shale rock formations. 

The expansions at seven LNG terminals, proposed since August 2025, would not be completed for several years. The largest expansions are proposed at the Port Arthur LNG Terminal in Texas, the CP2 LNG Terminal in Cameron and the Plaquemines LNG Terminal in Port Sulphur.

This new wave of expansions are on top of projects to build 24 new or expanded LNG terminals that were previously proposed, before August 2025, along the Gulf Coast, Alaska, and in other states, according to public records in the Oil & Gas Watch database. 

The boom started in Louisiana, which has been an epicenter of the LNG industry. The first export of LNG from the U.S. came in 2016 from Cheniere Energy’s Sabine Pass Liquefaction Terminal located in Cameron Parish.

Since then, U.S. LNG exports have grown into a $44 billion annual industry that, within the next five years, has the potential to become the second largest net export from the U.S., behind only civilian aircrafts and parts, according to an estimate by S&P Global Energy.

As wars overseas continue to destabilize global energy markets, Wall Street investors are reportedly eager to fund U.S. LNG export opportunities that are perceived as more reliable and stable than LNG coming out of Russia or the Middle East. 

One of the expansions is of the Venture Global CP2 LNG Terminal under construction in Cameron Parish. The terminal, as originally proposed, would have had a processing capacity of 28 million metric tons of liquified natural gas per year.

But then in June 2026, Venture Global received permission to increase this terminal’s capacity by 7 million metric tons per year. On top of that, Venture Global also submitted an application in May seeking approval to increase the terminal’s export capacity by an additional 11.7 million metric tons per year. 

The company’s Chief Executive Officer, Mike Sabel, said that Venture Global is positioning itself to become the largest exporter of LNG in the U.S. “We will build on the strong construction progress already underway and deliver reliable American LNG to customers around the world,” Sabel said in a press release.

But Breon Robinson, the Southwest Louisiana organizer for Healthy Gulf, a nonprofit organization, said the scale and the pace of the construction projects are threatening radical changes along the Gulf Coast. 

“What’s especially concerning is the trajectory we’re seeing,” Robinson said. Regulators should “stop looking at these projects as isolated developments and start asking what the cumulative impact of continually expanding LNG infrastructure means for our communities, our environment, and Louisiana’s long-term future.”

 The potential emissions of the expansions are significant. The CP2 expansion project alone could release more than 4.8 million tons of greenhouse gases per year, according to permit applications and public records. That would be the equivalent of the carbon dioxide from roughly one million cars and trucks driven for a year.

“Southwest Louisiana is already living with the health impacts, the traffic and the loss of fishing grounds from the terminals we have, and families are being asked to absorb even more,” said James Hiatt, executive director of For a Better Bayou. “Regulators keep approving these expansions one piece at a time while the people of the Gulf Coast live with the whole thing. 

Venture Global has also proposed a similar expansion its Plaquemines LNG Terminal, on the west bank of the Mississippi River about 25 miles southeast of New Orleans.

As planned originally, the facility would have been capable of producing 24 million tons of liquefied natural gas per year. But Venture Global has since applied for various expansions that would almost triple this capacity to 66 million metric tons of LNG per year.

These expansions are not limited to Louisiana. Similar proposals are also being announced for LNG terminals in Texas. One example is the Port Arthur LNG Export Terminal in East Texas, which is already under construction and could process up to 27 million metric tons of LNG per year. But in September of 2026, Sempra announced plans to build an expansion of the terminal that would double the facility’s processing capacity, bringing its annual total of 54 million metric tons of LNG, according to permit documents.

Impacts from these projects extend beyond the projects themselves to associated infrastructure, including pipelines. 

The Cloud Connector, a proposed 165-mile pipeline that would transport natural gas to the Plaquemines LNG Terminal, is expected to damage up to 1,428 acres of wetlands, according to public records. Despite these impacts, the public was only given 11 days to notice to submit public comments — instead of the normal 30-day public comment period — because of expedited “energy emergency” procedures the Trump administration enacted. 

Wetlands are a shrinking resource in Louisiana. The Bayou State has lost close to 2,000 square miles of land since the 1930s, according to the Louisiana Coastal Protection and Restoration Authority.

https://lailluminator.com/2026/10/15/lng-louisiana-war/

show less

Poland: Over 500 piles lay the foundation for Poland’s floating LNG terminal (Gallery)

With more than 500 massive steel piles now hammered into place on time and on budget, Poland’s gas transmission system operator (TSO), Gaz-System, has cleared a critical hurdle for the country’s upcoming floating storage and regasification unit (FSRU) in Gdańsk. This work lays the physical bedrock for a project designed to rewrite Poland’s energy playbook, bringing the nation one step closer to welcoming its first FSRU vessel by early 2028.

SHOW MORE

GAZ-SYSTEM has completed the driving of more than 500 piles forming the foundation of the jetty for the FSRU terminal in the Gulf of Gdańsk in accordance with the approved schedule, said to be completed on time and on budget as a key phase in the project to enable Poland to make inroads in launching the second liquefied natural gas (LNG) terminal on the Polish coast.

Miłosz Motyka, Minister for Energy, commented: “Developing LNG infrastructure directly strengthens Poland by securing its energy supply, boosting the economy, and upgrading the country’s position across Europe. The FSRU terminal in Gdańsk will increase our capacity to import natural gas from global markets and bolster Poland’s role in the regional supply system.

 “This project is of particular importance considering ongoing geopolitical tensions and the evolving dynamics of the energy landscape. The significance of strategic investment projects extends beyond the energy sector itself – they also provide a boost to Polish businesses, harness domestic expertise and lay the foundations for stable development conditions for industry and the economy as a whole.”

The installed piles form the basis of the jetty structure and will support the platforms and enable the installation of all the equipment and systems necessary to operate the FSRUs. The construction of the offshore section of the project involves the consortium of companies, including FABE Polska.

Wojciech Wrochna, Secretary of State at the Ministry of Energy and the Government Plenipotentiary for Strategic Energy Infrastructure, said: “The completion of pile driving operation for the jetty in the FSRU Terminal in Gdańsk marks another step towards the commissioning of a new gas supply facility in Poland.

“This initiative will effectively increase our gas import capacity by sea, reinforce supply diversification, and create additional opportunities for adaptable response to domestic energy demand. We remain committed to delivering investment projects that enhance the resilience and competitiveness of the Polish economy, thereby reinforcing our energy independence.”

In parallel with the jetty construction, Gaz-System underlines that operations continue to integrate the offshore and onshore parts of the facility, with August 2026 marking the drilling of a microtunnel over a kilometer in length, routed under the forest, dunes, and beach in Górki Zachodnie.

Sławomir Hinc, President of Gaz-System, stated: “We have just completed a critical and highly challenging phase of the project. We faced difficult conditions and changeable weather conditions.

“Nevertheless, owing to the determination of the contractors and meticulous coordination of the works, we have reached this critical milestone within the planned timeline. Now, the terminal features a robust physical foundation. Next, we will be assembling the platforms and preparing for the construction of the subsea gas pipeline.”

A specialized tunnel boring machine (TBM) remained beneath the Baltic Sea seabed following the drilling operation, as it was used for the construction; thus, preparations are now in progress to facilitate its retrieval. A gas pipeline will be laid inside the tunnel connecting the terminal to the onshore part of the facility.

The work on the onshore section is also well advanced, as the Gdańsk–Gustorzyn gas pipeline underwent tests in September, which is reported to have confirmed a high standard of work and the pipeline’s good working order.

Łukasz Radomski, Deputy Contract Director at GAP–FABE–UNITEK Consortium, underscored: “The steel piles driven into the seabed of the Gulf of Gdańsk form the foundation of the structure on which the prefabricated jetty platforms will be mounted along with necessary equipment. Concurrently, a microtunnel spanning over one kilometer was completed, designed for the installation of the gas pipeline connecting the offshore facility to the onshore system.

“The greatest challenge was the seamless coordination of all operation components in one place and at one time; the delivery of materials, the availability of vessels and specialist equipment, and the work of teams at sea and on land. It was precisely this highly efficient logistical framework that enabled us to incorporate engineering solutions into timely project delivery.”

Meanwhile, works are underway to complete the outfitting of the FSRU at the South Korean shipyard in Ulsan, with commissioning scheduled for early 2028. Following the regasification process, natural gas from the Solidarity vessel will be delivered to customers.

https://www.offshore-energy.biz/2026/10/21/over-500-piles-lay-the-foundation-for-polands-floating-lng-terminal-gallery

show less

Global LNG Development

 

Netherland: Equinor (Norway) signs five-year gas supply agreement with Eneco (Netherlands) 

Norwegian energy company Equinor has signed a five-year natural gas supply agreement with Dutch utility Eneco covering gas deliveries to the Netherlands between 2026 and 2031 (Equinor press release, 13/10/2026). The agreement covers deliveries for around 9 TWh/year of natural gas, or approximately 900 mcm/year, to the Dutch gas grid with deliveries starting on 1 October 2026.

SHOW MORE

Equinor will provide gas from the Norwegian continental shelf, of which the company has agreed to provide verified emissions data associated with the supplied gas volumes, allowing Eneco to incorporate upstream emissions information into its reporting and procurement processes. The companies stated that the arrangement is intended to increase transparency regarding emissions associated with natural gas supply chains.

The agreement strengthens Equinor’s position in the European gas market and supports Eneco’s gas supply portfolio for customers in the Netherlands and Belgium. Further commercial terms, including contract volumes and pricing arrangements, were not disclosed.

https://www.enerdata.net/publications/daily-energy-news/equinor-norway-signs-five-year-gas-supply-agreement-eneco-netherlands.html

show less

Vietnam: AFRY appointed international technical advisor for LNG thermal power project in Vietnam

AFRY has been selected as the international technical advisor for the 1.5 GW Quynh Lap LNG thermal power plant project in Vietnam. AFRY has been selected as the international technical advisor (ITA) for the 1.5 GW Quynh Lap LNG thermal power plant project in Tan Mai Ward, Nghe An Province, Vietnam.

SHOW MORE

The Quynh Lap LNG thermal power plant project is included in Vietnam’s Power Development Plan VIII, which sets out the country’s power sector development through 2030 with a vision to 2050. With an installed capacity of 1.5 GW, the project will support Vietnam’s efforts to expand and diversify its power generation capacity, helping to meet growing electricity demand while strengthening energy security and supporting continued economic and industrial development.

AFRY’s scope includes FEED for the onshore LNG receiving terminal and associated marine infrastructure, as well as environmental and social impact assessment (ESIA) services for the entire plant. The assignment covers key elements including jetty design, onshore LNG terminal facilities, associated infrastructure, and onshore and offshore surveys.

A distinctive aspect of the assignment is the combination of LNG terminal engineering, marine infrastructure, environmental and social assessment, and site survey activities within a single technical advisory role. This integrated approach enables marine, terminal, environmental and site-specific requirements to be considered together from the early stages of project development.

“AFRY brings extensive experience in LNG-to-power developments and a strong track record in delivering technical advisory and engineering services for complex energy infrastructure. Its integrated approach covering LNG terminal engineering, environmental and social assessment, together with its regional presence and understanding of local conditions, made AFRY a well-suited partner for this project,” said Le Hai Long, CEO, Quynh Lap LNG Power JSC.

The planned development will comprise an onshore LNG receiving terminal supplying natural gas to a 1.5 GW power plant, forming an integrated LNG-to-power development.

“We are proud to support this project and contribute to the development of an important energy infrastructure project in Vietnam. Bringing together our LNG, marine, environmental and engineering capabilities enables an integrated approach from the early stages of development, supporting the successful delivery of the LNG receiving terminal and associated marine infrastructure,” added Rishi Agrawal, Global Director, LNG & LNG-to-Power Solutions at AFRY.

https://www.lngindustry.com/liquid-natural-gas/15102026/afry-appointed-international-technical-advisor-for-lng-thermal-power-project-in-vietnam/

show less

FERC launches first LNG authorisation programme

The Federal Energy Regulatory Commission has proposed accelerating LNG infrastructure development through a landmark blanket authorisation programme.  In a historic, unanimous vote, the Federal Energy Regulatory Commission (FERC) proposed accelerating LNG infrastructure development through a landmark blanket authorisation programme. The proposal would streamline permitting, speed energy infrastructure development, and deliver unprecedented regulatory certainty for project developers.

SHOW MORE

In a Notice of Proposed Rulemaking (NOPR), FERC proposes to establish an LNG blanket authorisation programme to allow eligible activities at LNG facilities to proceed without case-specific authorisation orders under Sections 3 and 7 of the Natural Gas Act. The programme is modelled on the Commission’s 40-year blanket certificate programme for interstate natural gas pipelines.

“I am immensely proud of FERC’s historic proposal. It shows what can be possible when we combine regulatory excellence, robust safeguards, and a firm commitment to the nation’s energy future. Consumers benefit when more energy infrastructure is online, dependable, and affordable, and FERC is helping make that future a reality,” said FERC Chairman, Laura V. Swett.

FERC is proposing a three-tiered authorisation framework under which certain activities could proceed automatically, with periodic reporting, while others would require advance notice to the Commission. The proposed categories are as follows:

Automatic authorisation: Activities that would not increase an LNG plant’s authorised capacity, expand the authorised vertical or horizontal extents within the plant’s footprint, or cause flows, levels, volumes, pressures, temperatures, compositions, or loads to exceed applicable design limits.

60-day prior notice: Activities that may increase the plant’s authorised capacity but remain within the plant’s footprint and do not cause operating conditions to exceed the design limits of the affected or remaining facilities.

90-day prior notice: Construction of new LNG facilities – such as liquefaction trains, LNG tanks, and marine berths – and related auxiliary systems, including those located outside the plant’s footprint, subject to limitations on facility type, location, and size.

FERC’s NOPR also proposes standard environmental and engineering design conditions to address the potential impacts of projects approved under the blanket authorisation programme, as well as other requirements to ensure compliance with all applicable laws.

https://www.lngindustry.com/liquefaction/16102026/ferc-launches-first-lng-authorisation-programme/

show less

GCL Group and Jurong Group sign co-operation agreement on Ethiopia LNG project

The Ethiopia Branch of GCL Energy Investment Co., Ltd and Jurong Group (Holdings) Co., Ltd have signed an LNG contracted construction and toll processing contract for an LNG project in Ethiopia. Wang Dong, Executive President of GCL Group and President of GCL Africa Industrial Group, and Lin Rongsheng, Chairman of China Jurong Group, and their respective teams visited the Ministry of Mines of Ethiopia. They paid a courtesy call on the newly appointed Minister of Mines, H.E. Alemtsehay Paulos, and held a working meeting. Afterwards, the two sides held a cooperation agreement signing ceremony.

SHOW MORE

Witnessed by Alemtsehay Paulos and other officials, the Ethiopia Branch of GCL Energy Investment Co., Ltd and Jurong Group (Holdings) Co., Ltd formally signed the LNG contracted construction and toll processing contract. Fu Zhidong, Executive President of the Ethiopia Regional Liquefaction and Refining Business Division of GCL Africa Industrial Group, and Yi Min, Vice President of Jurong Group, signed on behalf of the two sides respectively.

Paulos welcomed Jurong Group’s participation in the development of GCL’s Ogaden Basin oil and gas project. She spoke highly of the important contributions made by GCL Group as a long-term trusted strategic partner of the Ethiopian government and the Ministry of Mines. She expressed the hope that both sides would take this signing as an opportunity to promptly launch the construction of the first phase (module) of LNG Phase II and strive for early commissioning and tangible results. She noted that Ethiopia has a vast territory and abundant resources, with broad development potential in oil and gas, minerals, and other fields. She welcomed Chinese investors such as GCL and Jurong to expand the scope of co-operation and deepen the level of cooperation, and said that the Ministry of Mines will continue to provide all-round policy support and service guarantees.

Jurong Group will leverage its professional strengths in natural gas liquefaction resource integration, full-cycle project management, and international storage, transportation, and trade. It will work closely with GCL Group to advance the LNG liquefaction project and simultaneously improve supporting infrastructure, storage, and transportation systems, and international trade corridors, helping Ethiopia accelerate the building of a localised and systematic natural gas industrial system and achieve win-win-win outcomes for the company, the host country, and partners.

Wang Dong conveyed Chairman Zhu Gongshan’s sincere gratitude to the Ethiopian government for its long-term support for GCL’s oil and gas exploration and development, and briefed on GCL’s latest progress in oil and gas development, natural gas production capacity construction, and market application of LNG in Ethiopia. He said that GCL has been deeply engaged in Ethiopia’s energy sector for many years. The Ogaden Basin natural gas project has achieved industrialised production of domestic natural gas and built Ethiopia’s first skid-mounted LNG liquefaction unit. The signing with Jurong Group will accelerate LNG engineering construction based on the Calub gas field and is a key measure for GCL to expand LNG production capacity and broaden domestic application markets and international export channels.

The project will adhere to lawful and compliant development, boost local employment and improve livelihoods, and practice green and low-carbon principles. It will also use the project as a pivot to build an integrated industrial chain covering “natural gas extraction–liquefaction–storage and transportation–application,” helping Ethiopia build an autonomous, controllable, safe, and efficient modern energy industrial system.

In the future, the two sides will leverage their respective strengths in oil and gas exploration and development, LNG production capacity construction, and storage, transportation, and trade, accelerate high-quality project implementation and tangible results, continue to deepen practical co-operation in energy technology, equipment manufacturing, cross-border trade, green and low-carbon fields, and continuously expand energy market space in East Africa and beyond, striving to create a new model for China-Africa energy cooperation and support high-quality Belt and Road co-operation.

Birhane Yadesa, Vice Minister of Mines of Ethiopia, and relevant staff from GCL Africa Industrial Group also attended the activities.

https://www.lngindustry.com/liquefaction/22102026/gcl-group-and-jurong-group-sign-co-operation-agreement-on-ethiopia-lng-project/

show less

Cheniere signs long-term SPA to supply QatarEnergy with LNG through 2054

Cheniere Energy, Inc. has announced that its subsidiaries have each entered into long-term LNG sale and purchase agreements with QatarEnergy to supply a total of 4 million tpy of LNG through 2054. Cheniere Energy, Inc. has announced that its subsidiaries, Sabine Pass Liquefaction, LLC (SPL) and Corpus Christi Liquefaction, LLC (CCL), have each entered into long-term LNG sale and purchase agreements (SPA) with QatarEnergy to supply a total of 4 million tpy of LNG through 2054.

SHOW MORE

Under the SPAs, QatarEnergy has agreed to purchase 2 million tpy of LNG from each of SPL and CCL on a free-on-board (FOB) basis for a purchase price indexed to the Henry Hub price plus a fixed fee. Deliveries under the SPAs will begin in the early 2030s and continue through the end of 2054, with 1 million tpy of the SPL SPA subject to a positive final investment decision with respect to the first phase of the SPL Expansion Project.

“These pivotal, multi-decade agreements with QatarEnergy, one of the world’s most important energy companies and a cornerstone of the global LNG industry, represent a major long-term commercial commitment and reinforce Cheniere’s position as the leader in US LNG,” said Jack Fusco, Chairman, President and CEO. “We take pride that Cheniere’s track record of operational excellence, reliability, and long-term customer focus provided the foundation for this landmark commercial relationship with QatarEnergy. We look forward to reliably supplying QatarEnergy from both Sabine Pass and Corpus Christi into the second half of this century.”

https://www.lngindustry.com/liquid-natural-gas/23102026/cheniere-signs-long-term-spa-to-supply-qatarenergy-with-lng-through-2054/

show less

GO TOP

LNG as a Marine Fuel/Shipping

Saudi Aramco’s New China Refinery Venture Gets First Crude Cargo

Saudi Aramco and its local partners have received the first crude cargo for their new refining complex in China, bringing the billion-dollar mega plant a step closer to production. The shipment of Arabian crude arrived late last week at the complexin Liaoning Province in northeast China, according to an emailed statement from Aramco on Wednesday. The release didn’t provide an official start date.

SHOW MORE

The huge refinery is nearing commercial operations as China and the broader oil market grapple with the fallout from the US-Iran war, which is heading toward an eighth month. The Asian nation has taken various measures to soften the impact, including reducing crude imports and tapping stockpiles, along with temporarily suspending fuel exports.

“The arrival of the first shipment of Arabian crude marks a major milestone in the development of the project and brings us closer to the start of operations,” Zheng Baoming, general manager and deputy party secretary of North Huajin Chemical Industries Group Corp., said in the statement. The company is one of the project partners, along with Panjin Xincheng Industrial Group Co.

The complex will include a 300,000-barrel-a-day refinery and a petrochemical plant with annual production capacity of 1.65 million metric tons of ethylene and 2 million tons of paraxylene. The joint venture is known as HAPCO. The plant is expected to start commercial operations in the first quarter of next year, according to an Oct. 13 note from Energy Aspects.

The shipment of Arabian crude was discharged by the tanker Kassab, according to a photo in the press release. The cargo was loaded at Saudi Arabia’s Juaymah port in the Persian Gulf, Kpler data shows.

https://www.bloomberg.com/news/articles/2026-10-14/saudi-aramco-s-new-china-refinery-venture-gets-first-crude-cargo 

show less

PetroChina Launches First LNG Bunkering Operation in Singapore

PetroChina is expanding its alternative marine fuel business in Singapore with its first LNG bunkering operation and an upcoming methanol vessel acquisition.

PetroChina International is set to conduct its first liquefied natural gas (LNG) bunkering operation in Singapore, marking a significant step in the Chinese energy giant’s expansion into alternative marine fuels. The operation will broaden the company’s fuel supply options for shipowners at Singapore, the world’s leading marine refuelling hub, as the shipping industry accelerates its transition towards lower-emission alternatives.

SHOW MORE

PetroChina International, the trading arm of state-owned PetroChina, received one of eight LNG bunkering licences granted by the Singapore government. The company is also authorised to supply methanol as a marine fuel, positioning it to benefit from growing demand for alternative bunker fuels.

Speaking at the Singapore International Bunkering Conference, Chairman Wu Junli said the company would complete the acquisition of a methanol bunkering vessel on Friday. The move will strengthen PetroChina’s ability to supply methanol to vessels and expand its operational presence in the emerging alternative marine fuel market.

According to Wu, data from Clarksons showed that global orders for alternative-fuel vessels approached 2,000 ships by the end of 2025. More than 1,200 of these vessels were LNG-fuelled, highlighting LNG’s established position among alternative marine fuels. Methanol-powered vessels are also expanding rapidly, while ammonia-fuelled ships are beginning to gain momentum.

However, the development of bunkering infrastructure remains a major challenge for the industry. Wu noted that fewer than 50 existing and planned ports offered methanol bunkering infrastructure, compared with approximately 220 LNG bunkering ports worldwide. This gap highlights the need for additional investment in fuel storage, distribution and vessel-to-vessel or shore-to-ship transfer capabilities as alternative-fuel fleets grow.

PetroChina already maintains a substantial position in Singapore’s conventional bunker market. The company accounted for approximately 10% of the city-state’s bunker sales last year, when total sales exceeded 56 million metric tons. Globally, PetroChina sold 7.95 million tons of bunker fuel during the same period and can serve 18 ports using 16 bunker vessels on time charter.

The company has also been developing its international alternative-fuel operations. Last year, PetroChina completed its first commercial LNG bunkering operation in Europe and obtained methanol bunkering qualification in Rotterdam, the Netherlands.

Wu added that China has an annual green methanol production capacity of 380,000 tons. As shipping companies explore lower-carbon fuels, PetroChina’s expansion into LNG and methanol bunkering could strengthen its competitive position in marine energy markets, although future growth will depend on fuel availability, infrastructure investment, regulatory developments and shipowner demand.

Product and Chemical Commodity Price Impact

PetroChina’s LNG bunkering debut in Singapore is expected to support demand for LNG as a marine fuel and encourage investment in LNG storage, transportation and bunkering infrastructure. The acquisition of a methanol bunker vessel could also improve marine methanol distribution and support demand for methanol, particularly as alternative-fuel fleets expand. However, the immediate impact on LNG and methanol prices is likely to remain limited because the announcement does not establish significant additional fuel consumption or supply constraints. For ChemAnalyst-tracked commodities, LNG and methanol prices will continue to depend primarily on feedstock costs, regional supply-demand balances, energy prices and trade flows.

https://www.chemanalyst.com/NewsAndDeals/NewsDetails/petrochina-launches-first-lng-bunkering-operation-in-singapore-45002

show less

China completes world’s first commercial green ammonia ship-to-ship bunkering

China has completed the world’s first commercial ship-to-ship green ammonia bunkering operation, transferring 1,000 tonnes of the fuel to Belgian shipowner CMB.TECH’s newly delivered Mineral Europa. The operation, carried out on October 13 and 14 at an anchorage off Zhoushan, saw the dedicated bunkering vessel Shenghang Yongle supply the 210,000 dwt bulker, the world’s first ammonia-powered dry bulk carrier.

SHOW MORE

The fuel was produced using renewable electricity at China Energy Engineering’s Songyuan green hydrogen and ammonia project in Jilin province, before being transported through Nanjing to Zhoushan.

The operation brought together China Energy Engineering, CMB.TECH and Jiangsu Andefu Energy Technology, establishing a commercial supply chain stretching from renewable fuel production to delivery onboard an oceangoing vessel.

“The offshore ship-to-ship bunkering model offers remarkable advantages,” said Li Jingguang, chairman of China Energy Engineering’s hydrogen division, noting that future transfers could reach 2,000 or even 3,000 tonnes.

Chinese maritime authorities supervised the operation, implementing special safety measures to handle the highly toxic fuel.

Mineral Europa, delivered earlier this month, is heading across the Pacific to Australia for commercial operations.

CMB.TECH expects 21 ammonia-powered vessels to enter its fleet by 2029, including 18 bulkers.

https://splash247.com/china-completes-worlds-first-commercial-green-ammonia-ship-to-ship-bunkering/

show less

Six shipments of LNG being purchased from Singapore and Qatar

The cabinet committee on government purchase has approved a proposal to purchase five cargoes of liquefied natural gas (LNG) from Singapore-based BP Singapore Pte. Ltd. and one cargo from Qatar Energy Trading LLC.

SHOW MORE

The prices set for the purchase of the six LNG cargoes are lower than the international market’s Japan-Korea Marker (JKM) index.

The proposal was approved at a meeting of the cabinet committee on government purchase held yesterday, Saturday. The Ministry of Finance announced the decision in a press release today, Sunday.

According to the press release, LNG will be purchased from BP Singapore at a price of $0.17 per million British thermal units (MMBtu) below the JKM index.

Meanwhile, a proposal to purchase an additional LNG cargo from Qatar Energy Trading LLC under a long-term contract has been approved. In this case, the price has been set at $0.10 per MMBtu below the JKM index.

Separately, at the 33rd meeting of the Cabinet Committee on Economic Affairs, the Energy and Mineral Resources Division presented a proposal to purchase LNG from JERA Global Markets Pte. Ltd. through the direct procurement method.

Under Section 68 of the Public Procurement Act, 2006, and Rule 99(2) of the Public Procurement Rules, 2025, the proposal called for direct negotiations with the company and the signing of a short-term LNG sale and purchase agreement (SPA) and a term sheet.

According to the press release, it was decided that the proposal would be presented at the next meeting after vetting by the Legislative and Parliamentary Affairs Division.

https://en.prothomalo.com/business/icrwrszl95

show less

Technological Development for Cleaner and Greener Environment Hydrogen & Bio-Methane 

Finnish gas grids receive first green hydrogen-based e-methane

P2X Solutions has injected green hydrogen-based e-methane into the Finnish gas network, receiving what it said is the country’s “first” guarantee of origin (GO) from state-owned transmission system operator Gasgrid. E-methane produced at P2X’s Harjavalta plant will supply European markets via the Balticonnector pipeline, which links the country to the European mainland through a subsea connection to Estonia.

SHOW MORE

It will be used in national grids, supplying domestic and commercial gas users.

P2X claimed the GO “lays the foundation for the hydrogen economy,” labelling it the only way of demonstrating the molecule’s green credentials to the market.

The company was also the first receiver of a green hydrogen GO in 2025.

E-methane has been gaining traction for its potential as a low-carbon alternative in maritime and shipping fuels and heavy industrial heating appliances, as well as commercial and domestic utilities.

Finland has particularly embraced the gas.

Espoo-based e-methane developer Ren-Gas is launching a 25MW plant in Tampere and will supply Swiss Liquefied natural gas operator Avanca Energy with the drop-in fuel under a €1bn ($1.1bn) deal.

Finnish start-up Reduciner also plans to launch e-methane production by 2027 following a €1.5m ($1.7m) investment from non-profit-owned hydrogen developer the Central Finland Mobility Foundation (Cefmof).

https://www.gasworld.com/story/finnish-gas-grids-receive-first-green-hydrogen-based-e-methane/2261975.article/

show less

 

GO TOP