NGS’ NG/LNG SNAPSHOT Ocr 1-15, 2026
National News Internatonal News
NATIONAL NEWS
City Gas Distribution & Auto LPG
BGCL commissions CNG station at SBSTC depot in Belgharia, West Bengal
Bengal Gas Corporation Limited (BGCL) has commissioned a compressed natural gas (CNG) station at South Bengal State Transport Corporation (SBSTC) depot in Belgharia. The station was developed through a joint venture (JV) of Bengal Gas Corporation Limited (BGCL) and South Bengal State Transport Corporation (SBSTC) at an estimated cost of Rs 32 million.
SHOW MORE
BGCL has about 33 operational CNG stations across its geographical area (GA) where three are already operating from state transport depots at West Bengal Transport Corporation (WBTC) Kasba depot, North Bengal State Transport Corporation (NBSTC) Ultadanga depot and WBTC Tollygunge depot and Belgharia is the fourth.
BGCL is planning to set up CNG facilities WBTC Nilgunj and Barasat depots, SBSTC Howrah depot and Santragachi bus depot.
Source: https://cgdindia.net/bgcl-commissions-cng-station-at-sbstc-depot-in-belgharia/
show less
Odisha’s Geologists And Scientists Shine As ONGC Discovers Natural Gas Reserves In Mahanadi Basin
ONGC has been conducting exploration in the Mahanadi offshore basin based on state-of-the-art technology, geological data, and geoscientific analysis, reports Bhwani Sankar Das. Bhubaneswar: The Oil and Natural Gas Corporation (ONGC) has discovered natural gas reserves in a well drilled approximately 43 kilometres out at sea from the Konark coast in Odisha’s Puri.
SHOW MORE
It is hoped that the discovery could transform Odisha into a key energy hub of Eastern India. Young scientists and geologists from the state contributed to the exploration, which was undertaken as part of ‘Samudra Manthan’.
The ones who played a major role in the exploration are geologists Vivekananda Barik from Keonjhar, Anil Kumar Badhai from Jharsuguda, and Soumyakanta Pradhan from Keonjhar. The Mahanadi Basin lies approximately 43 kilometres off the coast of Odisha. The three geologists worked alongside scientists and technical experts from various parts of the country on the mission. Apart from the geologists, the team included drilling engineers Anubhav Ojha, Raunak Arora, and Manjit Kumar; chemist Utsav Ghosh and production engineers Chandrakanti Mahawar and Ankit Choudhary. Pradhan, an ONGC employee had been part of the team for a brief period
Barik, a key figure behind the success of the mision, is the eldest son of Surendra Barik and Nirupama Barik from Handibhanga village in Keonjhar district. He completed his matriculation from Police High School in Keonjhar town. After completing his Plus 2 (Class XII) from Sri Aurobindo College in Cuttack, he pursued a Bachelor’s degree in Geology at Dharanidhar College, Keonjhar.
Subsequently, he completed his higher education from IIT Dhanbad. He is currently working as a senior geoscientist at ONGC. Vivekananda played a vital role in accomplishing complex tasks such as understanding the subsurface geological structure of the seabed, analyzing geological data, and identifying hydrocarbon potential. Suresh said Barik is posted at the Mumbai branch of ONGC and was in charge of gas exploration operations in the Mahanadi offshore basin.
Badhai, a native of Jharsuguda, was also a vital part of the ONGC initiative. He hails from Hirma village, located approximately 10 kilometres from Jharsuguda town, and is the son of Sundar Badhai. After completing his early education at Sainik School, he graduated from Ravenshaw University in Cuttack.
He subsequently pursued studies in Geology at IIT Dhanbad and later became associated with IIT Kharagpur for further research. He went on to join ONGC as a geologist. Badhai is part of a team engaged in critical research linked to the nation’s energy and fuel security.
‘The significant gas discovery by ONGC in the Mahanadi offshore basin is a matter of pride for us all. The initiative was launched under the visionary leadership of Prime Minister Narendra Modi as part of the Government of India’s ‘Samudra Manthan’ campaign,” he said.
Badhai said the success if the mission is the result of the tireless day-and-night efforts of skilled professionals—including geoscientists and experts from drilling, production, and other departments—hailing from various parts of India.
“This is not the achievement of a single person or institution, but the result of the dedication of individuals hailing from diverse locations,” said Badhai. His father, Sundar said, “We are all delighted with the success of this project. I am proud that my son has contributed to the nation. I extend my thanks to everyone.”
ONGC has been conducting exploration in the Mahanadi offshore basin based on state-of-the-art technology, geological data, and geoscientific analysis. On July 25 this year, the drilling of the first well of this deep water campaign began. The target depth of the well was 1,623 metres. After long research and data analysis, gas bearing zone between 1,441 and 1,452 metres was identified.
Gas flow started after the well was perforated on September 18. According to ONGC, the well has seen encouraging gas flow and stable reservoir pressure. The discovery of gas in the Mahanadi Basin has further intensified discussions regarding Odisha’s offshore hydrocarbon potential.
The well is located approximately 43 kilometers off the Konark coast. If, following further assessment, the find proves to be commercially viable, there is also talk of developing it by utilizing infrastructure shared with other offshore discoveries. However, the immediate next steps involve further evaluation, estimation of reserve volumes, and testing for commercial viability.
Should it prove suitable for commercial production, the impact on Odisha could be significant across various levels as a new source of domestic natural gas could emerge for the state’s power, chemical, steel, petrochemical, and industrial sectors.
The development of the region’s offshore gas resources, alongside the infrastructure at Paradip and other coastal areas, could further strengthen Odisha’s position as a key energy hub in Eastern India in the future. According to geologists, this subsurface discovery signifies more than just finding gas in a single well; it offers a promising new indication of further hydrocarbon potential within the Mahanadi offshore basin.
However, it cannot yet be classified as a major gas reserve or a site ready for commercial production as further evaluation is required to determine the gas volume, recoverable reserves, and commercial viability.
The presence of gas or oil beneath the seabed is not visible to the naked eye. To detect it, geological, geophysical, and seismic surveys are conducted. Exploration in the Mahanadi Basin did not begin just recently. In fact, exploration activities in the Mahanadi offshore area have been ongoing since 1978.
Gravity, aeromagnetic, and seismic surveys have been carried out in the past, and extensive 2D and 3D seismic data have also been collected. In layman’s terms, a seismic survey involves sending sound waves beneath the seabed to determine the composition of rock and soil layers.
Specialized survey vessels operate at sea, transmitting seismic wave signals down to the ocean floor. The waves strike the geological layers and bounce back. Specialized sensors capture these returning signals. To put it even more simply, a long sensor cable—or streamer—is towed behind the survey vessel; hundreds of sensors attached to it record the seismic wave signals returning from the seabed.
By processing data on a computer, scientists can determine the location of sedimentary basins, the dip of geological strata, the presence of geological structures, the layers with potential for resource reservoirs, and the prospective sites suitable for drilling. A 2D seismic survey can be likened to viewing the seabed’s geological structure along a single long line.
In contrast, a 3D seismic survey involves collecting data from multiple directions to create a three-dimensional (3D) image of the seabed’s geological structure. This enables scientists to gain a clearer understanding of the size, structure, and location of potential reservoirs prior to drilling.
The ‘Samudra Manthan’ initiative places special emphasis on the acquisition of such seismic survey data. Drilling operations for this mission commenced on July 25 this year. The MN-DWN18-1-HD well is the first of four deep-water wells planned for the Mahanadi Basin. The drilling vessel maintains its position at a specific location on the sea surface, and the seabed strata are drilled continuously using a string of drill pipes.
Data regarding the reservoir is obtained through the tests. A gas-bearing stratum was identified in the MN-DW18-1-H-D well at a drilling depth of 1,441–1,452 metres. Promising gas flow and reservoir pressure were observed from the well over a period of time. However, the total reserves or commercial production capacity have not yet been announced. Its actual size and commercial viability will be determined following reservoir evaluation and well testing.
The Central Government had launched the ‘Samudra Manthan’ initiative (National Offshore Exploration Scheme) to accelerate oil and natural gas exploration in India’s deep-water and ultra-deep-water regions. A budget of Rs84,084 crore has been allocated for phase-1 of the scheme, extending up to the 2030-31 financial year.
The scheme provides for supporting exploration wells across 60 deep-water and ultra-deep-water blocks and offers government assistance of up to 50 per cent of the eligible drilling costs.
show less
Centre Launches Revamped GOBARdhan Scheme, Targets Over 10-Fold Rise In CBG Production
New Delhi:Union Minister for Petroleum and Natural Gas Hardeep Singh Puri on Thursday launched the revamped GOBARdhan scheme at Bharat Mandapam in New Delhi, outlining a major push to expand domestic Compressed Bio-Gas (CBG) production, strengthen energy security and promote a waste-to-wealth economy.
SHOW MORE
The scheme aims to increase India’s CBG production more than tenfold by addressing longstanding challenges faced by the sector, including uncertain returns, inadequate infrastructure, pricing fluctuations and fragmented policy implementation.
Puri stressed the need to make greater use of locally available biomass, particularly amid rising energy demand and India’s continued dependence on imported natural gas.
He said biomass availability was not the primary obstacle to expanding CBG production. Instead, the government is focusing on building an integrated ecosystem involving the Centre, state governments, producers and other stakeholders to ensure the sector’s sustainable growth.
The minister noted that nearly 50% of India’s natural gas requirement is met through imports, with the country’s LNG import bill exceeding $13 billion in FY2025-26. Expanding domestic CBG production, he said, would help reduce this dependence while creating economic opportunities in rural areas.
Assured Offtake, Stable Pricing to Support Producers
A key feature of the revamped scheme is the introduction of assured offtake, stable pricing and enhanced financial assistance to improve the commercial viability of CBG projects.
Under the framework, producers will receive capital assistance of up to ₹2 crore per tonne per day (TPD) of installed capacity, along with support for pipeline infrastructure and connectivity to feedstock clusters. The government has also introduced a credit guarantee mechanism to facilitate financing for smaller enterprises.
According to the ministry, the scheme provides long-term price visibility, with assured gas pricing of around $20–21 per million British thermal units (MMBtu) for 10 years. The offtake price is expected to be around 30% higher than prevailing global prices, as outlined by the minister.
The programme has been approved with a total budgetary outlay of ₹23,731 crore and will be implemented from FY2026-27 to FY2035-36.
States to Play Key Role in Implementation
Emphasising the importance of state-level participation, Secretary, Ministry of Petroleum and Natural Gas, Dr Neeraj Mittal, said the scheme was developed after consultations with CBG producers, industry enablers and state governments.
He said the Centre had circulated a model CBG policy to states, covering areas such as land availability, feedstock access, incentives and regulatory approvals.
“States are the ‘karm bhoomi’ of this entire scheme. The Centre can formulate the programme, provide incentives and facilitate offtake, but the actual implementation will take place at the state level,” Mittal said.
He added that the Ministry of Finance had included state-level CBG policy adoption as an enabler under the Special Assistance to States for Capital Investment (SASCI) scheme, through which states can access capital support of up to ₹3,000 crore, subject to prescribed conditions.
Mittal also highlighted the potential of CBG plants to generate employment in rural and peri-urban areas, given their proximity to agricultural and organic waste sources. The organic manure produced as a by-product can also provide farmers with an additional resource for agricultural use.
Describing the initiative as a multi-stakeholder programme, he said the government had streamlined the payment mechanism by linking payments directly to gas production rather than relying on multiple payment schedules and certification processes.
Production will be monitored through Supervisory Control and Data Acquisition (SCADA) systems, with data uploaded to the portal for verification.
CBG Could Replace 20% of Gas Imports
Alok Tripathi, joint secretary (Gas) at the Ministry of Petroleum and Natural Gas, said India has an estimated CBG production potential of around 4 million tonnes per annum.
Realising this potential could enable CBG to replace nearly 20% of the country’s natural gas imports, he said. Tripathi noted that India currently produces approximately 0.4 million metric standard cubic metres per day (MMSCMD) of CBG, while natural gas accounts for around 6–7% of the country’s energy mix.
He said the earlier CBG ecosystem faced challenges such as uncertainty over project returns, fluctuating international gas prices, limited long-term policy visibility and a fragmented regulatory framework.
The new scheme seeks to address these issues through a unified policy framework, assured demand, stable pricing and improved infrastructure support. Tripathi added that the government was also extending the CBG-CBG synchronisation scheme until 2047 to facilitate the utilisation of domestically produced gas.
Digital Monitoring and Quality Compliance
To access the scheme’s benefits, CBG producers will be required to register on the GOBARdhan portal and comply with specified technical standards. These include installing SCADA systems, online gas chromatographs and automatic shut-off valves to ensure that gas supplied to the grid meets prescribed quality requirements.
Producers will also have to complete the necessary contractual formalities to transition to the administered pricing mechanism. The government is seeking to expand the programme through coordinated action involving the Department of Fertilisers, Ministry of Power, Department of Animal Husbandry and Dairying, state governments, banks and city gas distribution entities.
With the revamped GOBARdhan framework, the Centre aims to bring agricultural residue, cattle dung and other organic waste into the mainstream energy supply chain, while creating additional income opportunities for farmers and strengthening India’s domestic clean-fuel production capacity.
show less
OAGPL plans to expand PNG network in Prayagraj
Indian Oil and Adani Gas Private Limited (IOAGPL) is planning to expand Piped Natural Gas (PNG) network in Prayagraj. The expansion is expected to provide new PNG connections to about 3,00,000 households.
About 800 km of PNG pipeline has been laid, including 600 km in urban areas and 200 km in rural regions. The company aims to lay 200 to 250 km of pipeline by 2028. It aims to lay 130 km pipeline in FY 2026-27 and 120 km in FY 2027-28.
SHOW MORE
Pipeline laying works in Naini have commenced.
Indian Oil and Adani Gas Private Limited (IOAGPL) is planning to expand Piped Natural Gas (PNG) network in Prayagraj. The expansion is expected to provide new PNG connections to about 3,00,000 households.
About 800 km of PNG pipeline has been laid, including 600 km in urban areas and 200 km in rural regions. The company aims to lay 200 to 250 km of pipeline by 2028. It aims to lay 130 km pipeline in FY 2026-27 and 120 km in FY 2027-28.
Pipeline laying works in Naini have commenced.
Source: https://cgdindia.net/ioagpl-plans-to-expand-png-network
show less
Natural Gas/ Pipelines/ Company News
GAIL Gas to lay 172 km PNG pipeline across Dhanbad and Giridih GAs
GAIL Gas Limited is likely to lay 172 km piped natural gas (PNG) pipeline across the Dhanbad and Giridih geographical areas (GAs).
SHOW MORE
The process of hiring consultants and agencies is underway.
Source: https://cgdindia.net/gail-gas-to-lay-172-km-png-pipeline-across-dhanbad-and-giridih-gas/
show less
BPCL Wins Two Awards at PNGRB Excellence Awards 2026 for CGD Excellence
New Delhi, 2 October 2026: Bharat Petroleum Corporation Limited (BPCL) has received two prestigious recognitions at the PNGRB Excellence Awards 2026 for its contributions to the City Gas Distribution (CGD) ecosystem.
SHOW MORE
Awards Won by BPCL
2nd Winner – HSSE Excellence in CGD
PACE Team Recognition Award – Unified PNG Portal
Award Presentation
The HSSE Excellence award was received on behalf of BPCL by:
Shri Sanjay Khanna, Chairman & Managing Director
Shri Subhankar Sen, Director (Marketing)
Shri Rahul Tandon, Business Head (GAS)
Shri Rouf Khan, Executive Director (Projects, Marketing & Strategy)
And members of the BPCL team
The awards were presented by Hon’ble Minister of Petroleum & Natural Gas, Shri Hardeep Singh Puri.
PACE Team Recognition Award
The PACE Team Recognition Award honours the PACE Team, led by Shri Rahul Tandon from BPCL, along with other industry members. The team was recognised for conceptualising, designing and implementing the Unified PNG Portal (mypng.gov.in).
The Hon’ble Minister also appreciated this initiative during his Vote of Thanks at the event.
Commitment to Safer and Digital CGD Ecosystem
These recognitions reflect BPCL’s continued focus on building a safer, more efficient and digitally enabled City Gas Distribution ecosystem through commitment, collaboration and collective efforts of its teams.
show less
IGL Wins PNGRB Excellence Award 2026 for Overall Performance in City Gas Distribution
New Delhi: Indraprastha Gas Limited (IGL) has been awarded the PNGRB Excellence Award 2026 for its “Overall Performance in CGD: I”, recognising the company’s performance in the city gas distribution (CGD) sector. The award was presented by the Petroleum and Natural Gas Regulatory Board (PNGRB) at an event held in New Delhi on October 1, 2026, in the presence of senior officials from IGL and the Ministry of Petroleum and Natural Gas (MoPNG).
SHOW MORE
IGL Recognised for Overall Performance in City Gas Distribution
IGL received the recognition under the “Overall Performance – City Gas Distribution” category at the PNGRB Excellence Awards 2026.
The award acknowledges IGL’s performance and continued focus on excellence in the city gas distribution sector.
The recognition is also significant for IGL as it highlights the collective efforts of its employees towards maintaining operational and service standards.
IGL Leadership Appreciates Team’s Contribution
Following the award, Kumar Shanker, Managing Director, IGL, and Mohit Bhatia, Director (Commercial), IGL, addressed the company’s team.
They appreciated the collective efforts, dedication and commitment of IGL employees towards achieving excellence.
The leadership also acknowledged the contribution of every “IGLian” behind the company’s recognition at the PNGRB Excellence Awards 2026.
PNGRB Excellence Award Highlights IGL’s CGD Focus
The recognition comes as IGL continues its operations in the city gas distribution sector, supplying natural gas to customers through its CGD network.
The award reflects the organisation’s continued focus on performance and excellence in the sector.
The company described the recognition as a proud moment for the entire IGL family and reiterated its commitment to continuing its journey of excellence.
IGL PNGRB Excellence Award 2026: Key Highlights
Award: PNGRB Excellence Award 2026
Company: Indraprastha Gas Limited (IGL)
Category: Overall Performance in CGD: I
Recognition: Overall Performance – City Gas Distribution
Awarding body: Petroleum and Natural Gas Regulatory Board (PNGRB)
Event location: New Delhi
Event date: October 1, 2026
IGL officials: Kumar Shanker, Managing Director, and Mohit Bhatia, Director (Commercial)
Ministry presence: Ministry of Petroleum and Natural Gas (MoPNG)
About IGL
Indraprastha Gas Limited (IGL) is a natural gas distribution company engaged in the city gas distribution business. The company supplies compressed natural gas (CNG) and piped natural gas (PNG) to customers across its operational areas and is focused on expanding and strengthening its CGD network.
https://indianmasterminds.com/news/igl-pngrb-excellence-award-2026-city-gas-distribution-238512/
show less
HPCL Wins Three PNGRB Awards for Excellence in CGD Services and Pipeline Operations
New Delhi: Hindustan Petroleum Corporation Limited (HPCL) has received three awards from the Petroleum and Natural Gas Regulatory Board (PNGRB), recognising the company’s performance in City Gas Distribution (CGD) customer care and service delivery as well as pipeline operations.
SHOW MORE
ADVERTISEMENT
The awards were presented in New Delhi on October 1, 2026, by Union Minister for Petroleum and Natural Gas Hardeep Singh Puri to senior HPCL officials.
The recognition highlights HPCL’s focus on customer service, operational efficiency and service excellence across its energy operations.
HPCL Receives Three PNGRB Awards
The three awards recognise HPCL’s performance across two major areas:
CGD Customer Care and Service Delivery
Product transportation and pipeline operations
The pipeline-related recognition covers HPCL’s operations through MHMSPL under the LPG category and ASPL under the POL category.
HPCL said the awards reflect its continued commitment to customer care, service excellence and operational efficiency.
Awards Recognise MHMSPL and ASPL Operations
The PNGRB awards include recognition for HPCL’s pipeline operations through two entities:
MHMSPL: Recognised under the LPG category
ASPL: Recognised under the POL category
The honours recognise performance in the transportation and movement of energy products through HPCL’s pipeline network.
HPCL Leadership Receives Awards
The awards were presented by Union Minister Hardeep Singh Puri to senior HPCL executives.
The HPCL leadership present to receive the honours included:
Vikas Kaushal, C&MD, HPCL
Amit Garg, Director – Marketing
- Ramesh, Executive Director – Pipelines
Animesh Sinha, Head – CGD
The recognition was described as a reflection of the collective efforts of HPCL teams working across customer service, CGD and pipeline operations.
PNGRB Recognition Highlights HPCL’s Operational Focus
The awards highlight HPCL’s work across customer-facing CGD services and energy transportation infrastructure.
The company said the recognition reinforces its focus on:
Customer care and service delivery
Operational efficiency
Pipeline operations
Reliable movement of energy products
Excellence across its energy network
HPCL operates across various segments of the petroleum and energy value chain, with its CGD and pipeline businesses supporting the distribution and transportation of energy products.
HPCL PNGRB Awards 2026: Key Highlights
Company: Hindustan Petroleum Corporation Limited (HPCL)
Awards: Three PNGRB awards
Awarding body: Petroleum and Natural Gas Regulatory Board (PNGRB)
Date: October 1, 2026
Location: New Delhi
Key areas: CGD customer care, service delivery and pipeline operations
MHMSPL: LPG category
ASPL: POL category
Presented by: Union Minister Hardeep Singh Puri
About HPCL
Hindustan Petroleum Corporation Limited (HPCL) is a diversified oil and gas company engaged in refining, marketing and distribution of petroleum products. The company also operates in areas including city gas distribution and pipeline transportation, supporting India’s broader energy infrastructure.
https://indianmasterminds.com/news/hpcl-three-pngrb-awards-2026-cgd-pipeline-operations-238520/
show less
GAIL Bags Four Awards at PNGRB 20th Foundation Day for Pipeline Excellence
New Delhi: GAIL (India) Limited has been honoured with four prestigious awards by the Petroleum and Natural Gas Regulatory Board (PNGRB) on the occasion of its 20th Foundation Day celebrated on 1 October 2026. The awards recognise GAIL’s excellence in pipeline transportation and Health, Safety, Security & Environment (HSSE) performance.
SHOW MORE
Awards Won by GAIL
- Gas Transporter of the Year – Operational Length >1000 km
Dabhol Bengaluru Natural Gas Pipeline (DBPL) – 1,182 km - Gas Transporter of the Year – Operational Length up to 1000 km
Mumbai Regional Natural Gas Pipeline – 125 km - HSSE Excellence – Pipeline >1000 km
Jagdishpur Haldia Bokaro Dhamra Natural Gas Pipeline (JHBDPL) – 3,340 km - HSSE Excellence – LPG Pipeline
Jamnagar Loni Pipeline (JLPL) – 1,427 km
Officials Who Received the Awards
The awards were received on behalf of GAIL by:
Shri Deepak Gupta, Chairman & Managing Director
Shri Manoj Kumar Sharma, Director (Projects)
Shri A.K. Tripathi, Executive Director (O&M-CO)
Shri Sanjay Chauhan, Executive Director (O&M-NR)
Shri Devesh Varshney, Executive Director (Projects)
Company’s Statement
GAIL stated that these recognitions reaffirm its commitment to operational excellence, safety, reliability and robust pipeline integrity management.
show less
GAIL’s Director (Marketing) Sanjay Kumar to take over as Petronet LNG MD & CEO in May 2027
Sanjay Kumar, Director (Marketing) at state-run GAIL India, will take over as the Managing Director and CEO of India’s largest LNG importer Petronet LNG from May 13, 2027.
“It is hereby informed that the board, in its meeting held on October 2, has approved the appointment of Sanjay Kumar, Director (Marketing) GAIL (India) as Managing Director & CEO of the company with effect from the date of vacancy–May 13, 2027 on the recommendation of Nomination and Remuneration Committee of the Board,” Petronet LNG said in a BSE filing.
SHOW MORE
The detailed disclosure will be sent to the stock exchanges once Kumar assumes the charge as Managing Director & CEO, it added.
Kumar will replace Akshay Kumar Singh, who retires on May 12 next year. Singh joined the top post at Petronet in February 2021. His tenure was extended by the Board for roughly 15 months from February 1, 2026 to May 12, 2025 as a one-off final extension.
Prior to this, Singh served as Director (Pipelines) at state-run Indian Oil Corporation (IOCL). He is known for executing challenging, complex and large-sized cross-country pipeline networks of national importance.
Sanjay Kumar joined GAIL (India) as Director (Marketing) in June 2023. Prior to that he was serving as the Managing Director of state-run Indraprastha Gas (IGL), India’s largest CNG distribution company, since April 2022.
Prior to his role as MD, IGL, he was also GAIL’s nominee Director on the Boards of Maharashtra Natural Gas (MNGL) and GAIL Global (Singapore) Pte.
IOCL, GAIL (India), Oil and Natural Gas Corporation and Bharat Petroleum Corporation hold 12.5 per cent stake each in Petronet LNG.
show less
Reliance to invest Rs 1 lakh crore in Andhra
Reliance Industries plans to invest Rs 1 lakh crore in Andhra Pradesh to set up compressed biogas plants, creating more than 3 lakh jobs and generating nearly Rs 60,000 crore in revenue for the state over the coming decades, the company’s executive director Anant M Ambani said on Friday.
SHOW MORE
Speaking at the foundation stone laying ceremony for the Rayalaseema Horticulture Hub and Indian School of Agriculture in Madanapalle, Ambani said the investment would support the state’s transition towards cleaner energy while creating new opportunities for farmers.
“Our kisans, who ensure India’s food security, will now strengthen India’s energy security too – making India self-reliant in energy,” he said. “That is why Reliance Industries is grateful to the Government of Andhra Pradesh for the opportunity to invest Rs 1 lakh crore in the state to set up compressed biogas (CBG) plants.”
CBG is a renewable fuel produced by processing organic waste such as agricultural residue, animal dung, food waste and other biomass into methane-rich gas that can be used as a cleaner alternative to conventional natural gas, including in transport, industry and commercial applications.
Beyond reducing waste and emissions, CBG can help cut dependence on imported fossil fuels, create new markets for agricultural and organic waste, generate rural jobs and income, and support a more circular economy by converting waste into energy and nutrient-rich bio-manure.
show less
GAIL Appoints Rajeev Kumar as Government Nominee Director
New Delhi | October 6, 2026** — State-owned natural gas major GAIL (India) Limited has appointed Rajeev Kumar, Deputy Director General in the Ministry of Petroleum and Natural Gas (MoP&NG), as a Government Nominee Director to its Board, effective October 1, 2026.
SHOW MORE
Key Highlights: Appointee: Rajeev Kumar (2006-batch Indian Statistical Service Officer) Role: Government Nominee Director, GAIL (India) Ltd. Tenure: 3 Years (or co-terminus with government assignment) Key Focus Areas: PM GatiShakti infrastructure, project monitoring, CSR, and sector statistics.
Why Rajeev Kumar’s Background Matters for GAIL
Kumar brings nearly two decades of experience across economic and social sectors. At the Ministry of Petroleum and Natural Gas, his brief centers on monitoring strategic petroleum projects and spearheading PM GatiShakti implementation—a critical initiative for expanding India’s natural gas pipeline networks and energy infrastructure.
As a 2006-batch Indian Statistical Service (ISS) officer holding a Master’s in Statistics from Delhi University, Kumar previously led key national initiatives, including the major base revision of India’s GDP and National Accounts Statistics (2011–12 to 2022–23). His background spans: – Merchandise trade and demographic statistics – Member of Parliament Local Area Development Scheme (MPLADS) management – Health statistics and CPSE Corporate Social Responsibility (CSR) oversight
Strategic Impact on GAIL’s Infrastructure Roadmap
Kumar’s background in data analytics and national project tracking aligns closely with GAIL’s upcoming capital deployment plans, particularly regarding nationwide pipeline expansion and CPSE governance.
https://www.newsip.in/news-gail-appoints-rajeev-kumar-government-nominee
show less
Dilip Buildcon secures PNGRB license for ₹1,800 crore LPG pipeline project
Dilip Buildcon Limited has received a Grant of Authorisation from the Petroleum and Natural Gas Regulatory Board (PNGRB) for laying, building, operating, or expanding an LPG pipeline from Paradip, Odisha to Raipur, Chhattisgarh.
SHOW MORE
The project entails an exclusive license to develop the pipeline infrastructure for transporting LPG. The authorized entity will handle financing, construction, and operations, with the right to levy and collect tariffs for transportation up to the designated delivery point.
Project Structure and Execution
The initiative will be implemented through a Special Purpose Vehicle (SPV) in which Dilip Buildcon holds 100% equity. The company’s role is strictly limited to developing and operating the infrastructure and providing transportation services. It will not engage in the procurement, trading, distribution, or sale of LPG, nor bear associated commercial risks.
The Engineering, Procurement, and Construction (EPC) works are proposed to be awarded to the company. This represents a business opportunity valued at approximately ₹1,800 crore (excluding GST), to be executed over a period of 36 months.
Operational Framework and Impact
The pipeline is designed to facilitate the transportation of LPG to bottling plants of various Oil Marketing Companies (OMCs). This shift aims to replace existing road-based transportation via tankers, thereby enhancing road safety. The infrastructure will operate as a Common Carrier under the applicable PNGRB framework, allowing eligible OMCs and users to access pipeline capacity.
Revenue generation will occur through the applicable Petroleum and Petroleum Products Pipeline Transportation Tariff. The trading window for dealing in the company’s securities remains closed for insiders until 48 hours after the declaration of financial results for the quarter ended September 30, 2026.
What the Numbers Show
The disclosure highlights a dual revenue mechanism for the company: immediate recognition from EPC works valued at ₹1,800 crore over three years, followed by long-term annuity-like income from tariff collection over a 25-year operation period. This structure diversifies the company’s income stream from one-time construction contracts to sustained operational cash flows.
show less
Policy Matters/ Gas Pricing/ Others
J&K govt notifies City Gas Distribution Policy, plans PNG, CNG expansion across all 20 districts
SRINAGAR: The Jammu and Kashmir Government has notified the City Gas Distribution (CGD) Policy, 2026, paving the way for a phased expansion of cleaner natural gas infrastructure across the Union Territory and aimed at improving energy access for households, industries, businesses and the transport sector.
SHOW MORE
The policy was notified following its approval by the Council of Ministers headed by Chief Minister Omar Abdullah. It seeks to create an investor-friendly and time-bound framework for expanding the use of Piped Natural Gas (PNG) and Compressed Natural Gas (CNG) across households, commercial establishments, industries and the transport sector in the UT.
Under the policy, City Gas Distribution networks will be expanded in phases across all 20 districts of the UT, bringing cleaner and reliable natural gas closer to consumers and supporting a gradual shift from conventional fuels to cleaner energy alternatives.
A key component of the policy is the simplification and acceleration of project implementation. It provides for single-window and time-bound clearances, streamlined procedures for setting up CNG stations and standardised norms for the Right of Way, with the objective of reducing procedural delays and facilitating investment in gas distribution infrastructure.
The policy also places emphasis on providing gas connectivity to major industrial estates, including those in Kathua, Samba and Pulwama, to support industrial growth and improve access to reliable energy.
Improved access to natural gas is expected to support industrial activity, enhance energy efficiency and help businesses manage fuel costs, while improving their competitiveness and encouraging greater investment in the emerging clean-energy sector.
The policy is also expected to give a boost to local employment, apprenticeships and skill development, creating new opportunities in the construction, operation and maintenance of gas distribution infrastructure and associated services.
Chief Minister Omar Abdullah described the policy as an important step towards cleaner growth, sustainable development and a modern energy ecosystem in Jammu and Kashmir.
“The City Gas Distribution Policy will help expand clean and reliable energy access while creating an enabling environment for industry and investment. It is an important step towards building a cleaner, more efficient and sustainable energy future for J&K,” he said.
show less
Centre launches National PNG Drive 3.0 to boost natural gas in India’s energy mix
Petroleum and Natural Gas Minister Hardeep Singh Puri on Thursday launched National PNG Drive 3.0 to accelerate the adoption of piped natural gas (PNG) and support the government’s goal of increasing natural gas’s share in India’s primary energy mix from around 6 per cent, while promoting cleaner, reliable and affordable energy.
SHOW MORE
The drive launched at the event celebrating the 20th Foundation Day of the Petroleum and Natural Gas Regulatory Board (PNGRB), is being organised from October 1 to March 31, 2027, in collaboration with the Ministry of Petroleum and Natural Gas, Petroleum and Natural Gas Regulatory Board Act, city gas distribution entities, public sector oil marketing companies, and other stakeholders.
It aims to encourage the shift from LPG to PNG, and make better use of existing infrastructure.
The Minister said that the focus will be on activating dormant connections, maximising existing city gas distribution (CGD) networks, expanding PNG in semi-urban and rural areas, and connecting new consumers.
With 6,87,966 inch-km of pipeline already laid, there is potential for another 1.30 crore connections.
The drive targets 50 lakh new domestic piped natural gas connections, 40 lakh conversions to active users, and another 50 lakh domestic piped natural gas registrations.
Earlier, under the PNG Drive 2.0 ensured 12.10 lakh connections, 13.37 lakh billed connections and 15.31 lakh DPNG registrations.
Daily domestic piped natural gas (DPNG) additions rose 43 per cent while billed consumer additions increased 166 per cent.
PNG Drive 3.0 will take this progress further and provide clean, convenient and reliable PNG to many more households across India, the Minister added.
With the aim to increase the availability of natural gas across the country, PNGRB has authorised around 34,233 km of NGPL network, which includes common carrier, spur line, tie-in connectivity and dedicated pipeline across the country to various entities, of which 25,429 km have been made operational as of June 2025.
As much as 10,459 km of pipeline length is under various stages of construction.
The Union government has taken various measures to implement ‘One Nation, One Gas Grid ‘, which includes approving key trunk pipelines, providing viability gap funding in low-demand areas, introducing a unified tariff, accelerating expansion of the CGD network and setting up Liquefied Natural Gas (LNG) terminals.
The expansion of gas pipeline networks offers enhanced access to clean, reliable and affordable energy, improving household convenience, reducing dependence on traditional fuels across rural areas, industrial clusters and City Gas Distribution networks.
In industrial areas, assured gas supply at competitive prices strengthens manufacturing competitiveness, attracts new investments, reduces operational costs and fosters job creation.
Within CGD networks, the availability of CNG and PNG promotes cleaner mobility and domestic energy usage, leading to improved air quality and greater environmental sustainability.
show less
PNGRB bats for level playing field across EV, CNG and LNG vehicles
A level-playing field across vehicle types — from electric vehicles (EVs) to compressed natural gas (CNG) and liquefied natural gas (LNG) — is essential to ensure consumer economics work for each segment, said Anjani Kumar Tiwari, Member, Petroleum and Natural Gas Regulatory Board (PNGRB).
SHOW MORE
Speaking to The Hindu on the sidelines of the launch of The Energy and Resources Institute’s (TERI) comparative assessment of vehicular fuels, Mr. Tiwari said consumer economics must remain central while framing policies for all fuels.
“Economic consideration is important for consumers. At the same time, it is important to have a level-playing field for all vehicle technologies,” he said.
According to him, such parity could be achieved through a mix of appropriate taxation, subsidies, infrastructure support and policy interventions. Without a balanced framework, he said, consumers would find it difficult to compare the true economics of different vehicle options.
The TERI-PNGRB report aims to address these gaps by identifying areas where infrastructure creation, incentives and tax structures need alignment across fuel categories.
“Where infrastructure is required to be created, where incentives are to be accorded or tax rates must be made similar across the board. These are some of the things that would help carve a level-playing field and is what the report seeks to put forth,” he said, adding that leaving any segment unattended would make the overall paradigm “unbalanced”.
On recent CNG price increases, he attributed the pressure to higher input costs following the renewed conflict in West Asia. India’s immediate priority, he said, was ensuring fuel availability.
“Once that [disruptions because of the West Asia crisis] stabilises, prices will eventually come down and ultimately passed on to consumers,” he added.
Mr. Tiwari also highlighted the role of compressed biogas (CBG) in reducing India’s dependence on imported gas. Under the government’s target of setting up 5,000 CBG plants by 2030, the sector could contribute significantly to domestic gas availability.
“If these 5,000 plants operate at 50% capacity, around 30-40 million metric standard cubic metres per day (MMSCMD) of gas could be produced, depending on the [feedstock] yield,” he said.
show less
TERI study finds CNG has lower lifecycle environmental burden than EVs under India’s current power mix
As India steps up efforts to accelerate electric mobility and reduce its dependence on imported crude oil, a new study by The Energy and Resources Institute (TERI) has found that compressed natural gas (CNG) currently has a lower overall lifecycle environmental burden than electric vehicles (EVs) across most vehicle categories, primarily due to the country’s coal-dependent electricity generation mix.
SHOW MORE
New Delhi [India], September 30 (ANI): As India steps up efforts to accelerate electric mobility and reduce its dependence on imported crude oil, a new study by The Energy and Resources Institute (TERI) has found that compressed natural gas (CNG) currently has a lower overall lifecycle environmental burden than electric vehicles (EVs) across most vehicle categories, primarily due to the country’s coal-dependent electricity generation mix.
The findings assume significance as India seeks to expand EV adoption through incentives, charging infrastructure and support for domestic manufacturing, while also navigating wider energy security challenges and dependence on imported energy and critical minerals.
Under the government’s PM E-DRIVE scheme, incentives have been provided to promote electric vehicle adoption, while Rs 2,000 crore has been allocated for setting up public EV charging stations.
However, TERI’s “Study on Comparative Assessment of Vehicular Fuels in India’s Energy Transition” said the environmental performance of different vehicle technologies needs to be assessed across their entire lifecycle rather than solely on emissions produced during vehicle operation.
“Under the current Indian electricity mix, CNG generally demonstrates the lowest overall environmental burden across most vehicle categories, owing to performance across several of the LCA indicators considered in the analysis,” the report said.
Lifecycle assessment (LCA) considers impacts across the entire value chain, including fuel or electricity production, vehicle manufacturing, operation and end-of-life disposal. TERI assessed parameters such as climate change, particulate matter, human toxicity, water consumption, fossil-resource use and consumption of minerals and metals.
The report noted that EVs have a clear advantage in terms of operational air pollution as they produce no tailpipe emissions. However, their overall lifecycle performance remains sensitive to the source of electricity used for charging and the environmental footprint associated with battery manufacturing.
“EVs perform favorably when considering operational air pollutants loading, which are present in other fuels; however, their current life-cycle assessment was found sensitive to electricity generation mix (which at present is predominantly coal-dependent) and battery manufacturing,” TERI said.
The study, however, does not suggest that EVs perform poorly across all vehicle segments. TERI found that EVs currently have the lowest ownership costs for two-wheelers and three-wheelers, supported by lower running costs and high utilisation rates.
At the same time, the challenges associated with electrification become more pronounced in larger vehicle categories due to charging infrastructure requirements, payload considerations, battery-related environmental impacts and dependence on imported critical minerals and components.
According to the study, electric mobility emerges as a preferred option for two-wheelers, three-wheelers and certain urban mobility applications. CNG, meanwhile, currently offers a stronger balance of economic, environmental and operational considerations for passenger cars, taxis, buses and light commercial vehicles.
The report also outlined a differentiated transition pathway for heavy-duty transport. CNG is expected to remain relevant for regional freight movement, while LNG could gain importance in long-haul transport. Battery-electric trucks, meanwhile, are expected to remain suitable for select applications under the conditions assessed by the study.
TERI also highlighted an important dimension of India’s energy transition: electrification can reduce direct dependence on imported crude oil, but it can simultaneously increase exposure to global supply chains for critical battery minerals.
Lithium, cobalt, nickel and graphite are among the key materials used in battery manufacturing, making supply-chain resilience an important consideration as India expands its EV ecosystem.
The study assessed petrol, diesel, CNG, electricity and LNG across six vehicle categories, examining technical, environmental, economic, social and geopolitical factors for the current period as well as projections for 2030, 2040 and 2050.
Its broader assessment is that there is no single fuel or powertrain that consistently performs best across every vehicle category and evaluation criterion, underscoring the need for a differentiated approach to India’s energy transition. (ANI)
show less
LNG Use / LNG Development and Shipping
GAIL India Exploring Stake in US LNG Project
GAIL India is evaluating three to four liquefaction and liquefied natural gas (LNG) export projects in the United States for a possible minority investment, according to industry executives familiar with the development. The review is part of the company’s effort to diversify its LNG portfolio and strengthen long-term supplies for India after disruptions linked to the Strait of Hormuz crisis.
SHOW MORE
GAIL is assessing nearly four US LNG export projects to secure long-term supply agreements and is open to becoming a minority partner in one of them. An investment would give the company a direct interest in an export project while supporting supply security for its domestic customers. The discussions are at an evaluation stage, and no investment decision has been announced.
The company has a diversified LNG portfolio of about 16.56 mn t per annum (MMTPA), with supplies sourced from international markets including the United States, Qatar and Australia. Additional US opportunities would broaden its sourcing base and reduce exposure to disruptions affecting individual markets or supply routes.
India’s natural gas demand is supported by fertiliser production, city gas distribution, power generation, refining and petrochemicals. Reliable long-term LNG supplies are therefore important for meeting industrial and commercial requirements, particularly as domestic consumption expands across these sectors.
A potential investment could combine upstream participation with long-term offtake arrangements, strengthening GAIL’s position across the global LNG supply chain. The structure, value and timing of any transaction remain undisclosed. GAIL did not respond to an email seeking comment by press time.
show less
Electric Mobility/ Hydrogen/Bio-Methane
Cabinet approves Rs 1.86 lakh crore green energy corridor scheme
The government on Wednesday approved the Rs 1.86 lakh crore Green Energy Corridor Phase-III (GEC-III) scheme to facilitate the evacuation of up to 135 GW of renewable energy across states and Union Territories by 2032-33. The government said the scheme would strengthen the intra-State transmission system (InSTS) and help integrate increasing renewable power into the national grid.
SHOW MORE
Under the scheme, Rs 1,36,378 crore out of the total outlay of Rs 1,86,405 crore will be spent on developing intra-State transmission systems, while Rs 50,000 crore will be used to deploy 50 GWh of Battery Energy Storage Systems (BESS).
The government will provide Central Financial Support of Rs 54,082 crore under the scheme. The assistance will help offset intra-State transmission charges and keep electricity costs down, benefiting consumers, according to the government.
The BESS will be deployed at renewable energy developer or generator sites, or at other locations considered important for grid flexibility. The storage systems will help address the intermittent nature of renewable power, transmission congestion and peak-hour curtailment, besides meeting electricity demand during non-solar hours.
The scheme will facilitate the integration and evacuation of renewable power within states and Union Territories and is expected to support India’s target of achieving 900 GW of installed non-fossil fuel capacity by 2035.
All greenfield projects under the InSTS component will be implemented through Tariff Based Competitive Bidding (TBCB), while brownfield upgrades and network-strengthening works will be executed on a Cost Plus Basis (CPB).
State Transmission Utilities will be the overall implementing agencies, while Transmission Service Providers will participate in projects awarded through TBCB on a Build-Own-Operate-Maintain (BOOM) model.
The government said the scheme would contribute to India’s long-term energy security and help reduce its carbon footprint. It is also expected to generate direct and indirect employment in the power, manufacturing and construction sectors.
The deployment and manufacturing of BESS will create jobs in the domestic energy storage industry, while the expansion of the transmission network will generate skilled employment in operations, maintenance and grid management.
show less
Bihar Cabinet approves draft Green Hydrogen Policy 2026; targets 1 lakh tonnes annual production by 2031
Patna: The Bihar Cabinet on Wednesday approved the draft Bihar Green Hydrogen Policy, 2026, aimed at promoting renewable energy, reducing carbon emissions and lowering dependence on imported natural gas, The Hindu reported.
SHOW MORE
The policy seeks to attract private investment in the green hydrogen sector and create employment opportunities in the state, Cabinet Secretariat Department Additional Chief Secretary Arvind Kumar Chaudhary said during a post-Cabinet briefing.
The policy is aligned with the Centre’s National Green Hydrogen Mission, launched in 2023. Chaudhary said the policy will promote green hydrogen production and consumption, market development, electrolyser manufacturing and other components across the value chain.
The state has set a target of producing 0.1 million metric tonnes (1 lakh tonnes) of green hydrogen annually by 2031.
The policy also envisages establishing 1 GW of electrolyser manufacturing capacity and developing around 2.5 GW of renewable energy capacity through green hydrogen and its derivative projects.
The Bihar government expects the policy to attract investments of around Rs 16,000 crore and generate approximately 12,000 direct and indirect jobs.
The Bihar Renewable Energy Development Agency (BREDA) has been designated as the nodal agency for implementing the policy.
According to Chaudhary, the policy is primarily aimed at decarbonisation and supporting the long-term goal of achieving net-zero emissions.
VAT on ATF reduced at RCS airports
The Cabinet also approved reducing the VAT rate on Aviation Turbine Fuel (ATF) from 1% to zero at airports covered under the Regional Connectivity Scheme (RCS).
The state had earlier reduced the VAT on ATF used as aircraft fuel from 29% to a uniform 4% in June 2025.
The latest decision is expected to support an increase in regional air connectivity and contribute to economic activity in the state.
Posts approved for universities
The Cabinet approved the creation of 34 posts of officers and employees for the administrative functioning of Dr Syama Prasad Mookerjee Artificial Intelligence and Computer Science University in Bhagalpur.
A similar 34 posts were approved for Shaheed Jubba Sahni University of Architecture and Civil Engineering in Muzaffarpur.
The Cabinet also approved the contractual engagement of 35 personnel across various categories for the Buddha Samyak Darshan Museum-cum-Memorial Stupa in Vaishali, as well as the Directorate of Museums and government museums. The appointments will be for 11 months or until regular appointments are made, whichever is earlier.
Hemophilia scheme approved
The Cabinet approved implementation of the Mukhya Mantri Hemophilia Yojana under the Mukhya Mantri Chikitsa Sahayta Kosh to improve treatment facilities for hemophilia patients in Bihar.
The government said there are 255 hemophilia patients in the state. The scheme will provide Emicizumab, a medicine used in the treatment of hemophilia.
Water cannons and Vajra vehicles
The Cabinet also approved the procurement of 30 water cannons at Rs 88 lakh each, costing Rs 26.40 crore, and 86 Vajra vehicles at Rs 42 lakh each, costing Rs 36.12 crore.
The combined expenditure on the two categories of vehicles will be Rs 62.52 crore.
The vehicles will be used for law-and-order management, crowd control, riots and emergency situations during festivals, fairs, election rallies and visits or movements of distinguished persons.
A total of 30 decisions were taken at the Cabinet meeting chaired by Chief Minister Samrat Choudhary.
show less
Odisha extends EV policy validity till December 31, 2026, to boost green mobility
Under the policy, the Odisha government provides 100 per cent exemption from road tax and registration fees, along with purchase subsidies for electric vehicles (EVs).
To promote green mobility and accelerate the transition towards sustainable transportation, the state government has extended the validity period of the Odisha Electric Vehicle Policy, 2021 till December 31, 2026, an official notification said.
SHOW MORE
A notification in this regard has been issued by the Commerce and Transport Department on Saturday.
It said, “In exercise of powers conferred under the provisions of para 11.5 of the Odisha Electric Vehicle Policy, 2021, the government has been pleased to extend the validity period of the policy till December 31, 2026.”
The extension was made keeping in view the state government’s commitment to reduce carbon emissions.
Under the policy, the Odisha government provides 100 per cent exemption from road tax and registration fees, along with purchase subsidies for electric vehicles (EVs). The state government had introduced the Odisha Electric Vehicle Policy, 2021, to encourage adoption of EVs and promote the manufacture of EVs and its components in the state.
As part of the policy, the state government extends financial incentives, including incentives for manufacturing industries, purchase incentives, scrapping incentives, interest subvention in loans, and waiving of road tax and registration fees to encourage adoption of EVs.
Under the policy, on purchase of a two-wheeler, a customer gets a subsidy of 15 per cent of the vehicle cost, capped at ₹5,000, or ₹5,000 per kWh, subject to a maximum subsidy of ₹20,000. The wheeler subsidy is 15 per cent of the vehicle cost, capped at ₹10,000, or a flat subsidy of ₹30,000.
For four-wheelers, the subsidy amount is 15 per cent of the vehicle cost, capped at ₹50,000, or ₹10,000 per kWh, subject to a maximum subsidy of ₹1.5 lakh.
Passenger buses are eligible for a subsidy of 10 per cent of the vehicle cost, ranging from ₹4 lakh to ₹20 lakh depending on specifications, while goods carriers are eligible for a ₹30,000 subsidy for the initial units.
show less
NTPC Green Energy Commences Commercial Operations at Kalasar Solar Project
NTPC Green Energy has initiated a new 66.18 MW solar capacity block at its Kalasar project in Bikaner, Rajasthan (as stated in the source alert; not independently verified). While the latest 66.18 MW launch is unverified, official disclosures confirm that the company’s verified operational capacity reached 11,262.51 MW earlier this month after a series of phase-wise commissionings at Kalasar.
SHOW MORE
SAHI Markets, Published: 9 Oct 2026, 09:48 PM IST (31 minutes ago)
Last Updated: 9 Oct 2026, 09:48 PM IST (31 minutes ago)
3 min read
Reviewed by Arpit Seth
Market snapshot: NTPC Green Energy has announced the start of a 66.18 MW power unit at its Kalasar Solar Project, pushing its claimed total capacity to 11,328.69 MW (as stated in the source alert; not independently verified). This development builds upon a series of rapid capacity additions by its wholly-owned subsidiary, NTPC Renewable Energy Limited, in Rajasthan.
Data Snapshot
NTPC Green Energy’s second and third parts of the Kalasar Solar Energy Project, totaling 153.94 MW, were declared on commercial operation w.e.f. October 1, 2026.
The company’s verified group capacity rose to 11,262.51 MW w.e.f. October 2, 2026, after commissioning a 50 MW solar unit in Rajasthan.
The first part of the Kalasar Solar Energy Project, comprising 81.34 MW, was commissioned w.e.f. September 26, 2026.
What’s Changed
The commercial capacity of NTPC Green Energy Limited group has expanded by 153.94 MW in Kalasar Solar Project (derived: 11,212.51 MW post-launch vs 11,058.57 MW pre-launch) under its wholly owned subsidiary NTPC Renewable Energy Limited.
The group’s total commercial capacity was further raised by 50 MW (derived: 11,262.51 MW post-launch vs 11,212.51 MW pre-launch) following the commercial operation of the fourth part capacity in Rajasthan w.e.f. October 2, 2026.
Key Takeaways
NTPC Green Energy continues its aggressive renewable capacity ramp-up, systematically executing its phase-wise solar commissioning plans in Rajasthan.
The commissioning of 153.94 MW (73.06 MW and 80.88 MW) at the Kalasar Solar Energy Project showcases robust execution by its stepdown subsidiary, NTPC Renewable Energy Limited.
The overall capacity additions are aligning with the group’s massive clean energy ambitions, utilizing strategic joint ventures like ONGC NTPC Green Private Limited.
SAHI Perspective
NTPC Green Energy’s structured execution model, relying heavily on step-down subsidiaries and JVs, reduces direct project risks. The continuous stream of commercial operations at Bikaner and other parts of Rajasthan shows strong project management. However, as the group scales toward its massive target, timely grid integration and battery storage implementation remain key to maintaining high Plant Load Factors (PLFs).
Market Implications
The continuous capacity additions are highly positive for NTPC Green Energy’s long-term revenue visibility, as commissioned capacities translate directly into commercial billing under long-term power purchase agreements (PPAs).
Trading Signals
Market Bias: Bullish
Steady commercial capacity additions (including 153.94 MW at Kalasar) provide strong revenue visibility. The expansion to a verified 11,262.51 MW reinforces its leadership in the Indian green utility space.
Overweight: Renewable Energy, Utilities, Power Infrastructure
Trigger Factors:
Commercial commissioning of the remaining 650 MW Kalasar solar component
Grid integration and generation metrics from newly launched Rajasthan units
Interim financial results reflecting the newly commissioned capacities
Time Horizon: Medium-term (3-12 months)
Industry Context
India’s renewable utility sector is undergoing rapid expansion, backed by aggressive public sector targets. Public sector majors like NTPC and NHPC are leading the transition with massive capital expenditure programs. NTPC’s overarching target involves establishing 60 GW of renewable energy capacity by 2032.
Key Risks to Watch
Transmission bottlenecks and potential grid curtailment in high-generation zones like Bikaner, Rajasthan.
Fluctuations in solar insolation levels affecting early-stage PLF and billing.
Supply chain delays for solar PV modules or storage components.
Recent Developments
In late September 2026, NTPC Green Energy declared commercial operation of the first part capacity of 81.34 MW of the Kalasar Solar Energy Project w.e.f. September 26, 2026. This was quickly followed by the second and third parts totaling 153.94 MW w.e.f. October 1, 2026. Additionally, the group’s joint venture, ONGC NTPC Green Private Limited, started commercial operations of a 50 MW solar capacity in Rajasthan w.e.f. October 2, 2026.
https://www.sahi.com/news/ntpc-green-energy-commences-commercial-operations-at-kalasar-solar-project
show less
State plans to set up CBG plants in Maharashtra
Government of Maharashtra (GoM) is planning to set up city gas distribution (CBG) plants and has directed the formation of a task force to identify suitable locations and implement projects in line with the state’s CBG policy.
SHOW MORE
The state has asked officials to explore CBG project development in the Brihanmumbai Municipal Corporation (BMC) area, Vasai-Virar, Mira-Bhayandar and Kalyan-Dombivli, and Hinjawadi and Chakan in Pune.
Source; https://cgdindia.net/state-plans-to-set-up-cbg-plants-in-maharashtra/
show less
INTERNATIONAL NEWS
Natural Gas / Transnational Pipelines/ Others
US: Texas project looks to move US pipeline gas to Mexico for export as LNG
In a US Department of Energy filing, Texas-based Freedom LNG applied to build a liquefaction and export project from floating barges on Mexico’s Gulf coast
Texas-based Freedom LNG has applied to the US Department of Energy (DOE) for authorisation to export US-sourced natural gas to Mexico for liquefaction and re-export from a proposed floating LNG facility near the Port of Matamoros, Tamaulipas.
SHOW MORE
In an application filed on 11 September 2026, Freedom LNG requested permission to export up to 343Bn ft³/year (Bcf/y) of US natural gas to Mexico, including 307 Bcf/y for re-export as LNG.
The proposed Bravo LNG project would have nominal capacity of 6M tonnes/year (mta), produced in one modular liquefaction train housed on pretreatment and liquefaction barges connected to a short feedgas pipeline. Freedom proposes a roughly 70-km subsea pipeline connecting the existing system to the project.
LNG would be transferred to two floating storage units (FSUs), from which visiting LNG carriers would load cargoes for export. The proposed marine infrastructure includes dedicated berthing facilities to accommodate LNG transfers and carrier loading for vessels up to Q-Flex capacity.
The project is being developed by Singapore-based LNG Alliance, an affiliate of Freedom LNG, and developer of Amigo LNG. A new, related company, Bravo LNG would own and operate the facility.
Freedom LNG proposes to transport gas through the existing offshore Sur de Texas-Tuxpan pipeline system. The gas would be used both for consumption in Mexico and as feedstock for LNG exports to international markets.
The company is seeking a 20-year authorisation, beginning when commercial exports commence. It has applied for permission to re-export LNG to countries without free-trade agreements with the US, with its request covering free-trade agreement countries to be considered separately by the DOE.
The Federal Register notice, published on 6 October, opens the DOE’s review of the application for exports to non-free-trade-agreement countries. Comments, protests and intervention requests are due by 7 December 2026. The notice does not approve the project.
Project affiliate Amigo LNG has already advanced plans for a 3.9-mta terminal at Guaymas, on Mexico’s Gulf of California, with feed gas also expected from the US Permian Basin.
Bravo LNG adds to a growing pipeline of Mexican LNG export developments. New Fortress Energy’s modular FAST LNG facility off Altamira has been operating since mid-2024, using converted jack-up rigs to support offshore gas treatment and liquefaction. The facility went offline in October 2026 due to a mechanical issue with a gas turbine, and NFE is actively seeking buyers or co-development partners to complete its second Fast LNG project (FLNG 2).
There are plans for a small-scale LNG hub at Salina Cruz, on Mexico’s Pacific coast, reflecting further interest in developing export and LNG infrastructure around the country. And across Mexico and Canada, projects are moving through construction, contracting and commercial development, adding to North America’s expanding LNG project pipeline.
show less
Egypt, Cyprus Fast-Track Gas Projects to Boost Europe LNG Supplies
Egypt and Cyprus are accelerating Cronos, Aphrodite and Glaucus gas projects, strengthening regional LNG flows and Europe’s energy security.
Egypt and Cyprus are moving to accelerate the development of major Cypriot natural gas resources, with both countries seeking to convert offshore discoveries into commercially viable production and LNG export projects through Egypt’s established energy infrastructure.
SHOW MORE
Egyptian Minister of Petroleum and Mineral Resources Karim Badawi and Cypriot Minister of Energy, Commerce and Industry Michael Damianos discussed the latest developments during an East Mediterranean Gas Forum (EMGF) roundtable in Greece. The discussions focused on speeding up agreements and infrastructure arrangements required to bring Cypriot gas into production and connect it with Egypt’s processing and liquefaction network.
A key focus was the Cronos gas field, where partners Eni and TotalEnergies reached a final investment decision (FID) in July. Production is targeted for 2028, with expected output of around 500 million cubic feet per day (mmcf/d), equivalent to approximately 2.8 million tonnes per year of LNG.
Under the planned development model, Cronos gas will be transported to Egypt through existing infrastructure before being processed and liquefied at the Damietta LNG facility. The resulting LNG is expected to be exported to international markets, particularly Europe, strengthening the region’s role as an alternative gas supply corridor.
The two ministers also discussed the Aphrodite gas field, estimated to contain between 3 trillion and 6 trillion cubic feet (Tcf) of natural gas. Egypt, Cyprus and project partners are working to finalize commercial and regulatory arrangements needed to move the project toward FID and implementation.
Egyptian gas company EGAS signed a 15-year agreement in April to purchase Aphrodite’s entire production, with an option to extend the arrangement by another five years. Cyprus has indicated that project partners remain on track for an FID in 2027, while first gas could arrive around 2030–2031.
Attention is also turning to Cyprus’ Glaucus gas field, where ExxonMobil and QatarEnergy hold interests. Egypt is seeking to accelerate implementation of an MoU signed in May to evaluate options for developing and marketing Cypriot gas and routing it through Egyptian infrastructure for liquefaction and re-export.
Badawi said Egypt-Cyprus cooperation is increasingly shifting from strategic discussions toward commercial projects and physical gas flows. Egypt’s processing and LNG infrastructure, combined with its geographic position between the Eastern Mediterranean and European markets, could provide a critical export route.
The broader regional push also involves Greece, whose LNG receiving and regasification infrastructure could support additional Eastern Mediterranean gas flows into European markets. Faster project execution could therefore increase regional gas connectivity while improving supply flexibility for European buyers.
Product and Chemical Commodity Price Impact
The acceleration of Cronos, Aphrodite and Glaucus could increase natural gas and LNG availability from the Eastern Mediterranean, particularly from 2028 onward. Higher regional supply and additional LNG export capacity through Egypt could reduce tightness in European gas markets, potentially limiting upside for European natural gas, LNG and gas-linked chemical feedstocks over the medium term. However, the price impact is unlikely to be immediate because major volumes remain years away and depend on infrastructure, commercial agreements and project execution. For chemicals tracked by ChemAnalyst, methanol, ammonia, urea, hydrogen and other gas-intensive products could eventually benefit from more diversified gas supply, potentially easing feedstock-cost pressure and improving producer margins.
show less
China completes main structure of first offshore CO2-injection platform for enhanced gas recovery
China has completed the main structure of its first offshore platform designed to inject carbon dioxide to boost natural gas recovery, CCTV News reported, citing China National Offshore Oil Corporation (CNOOC).
The new central platform at the Dongfang 1-1 gasfield has entered the commissioning stage. Once fully operational, the project is designed to store more than 1 million tons of CO2 annually in geological formations beneath the seabed, supporting efforts to cut emissions from offshore energy production.
SHOW MORE
The platform will capture and purify CO2 produced alongside natural gas, then pressurize and reinject it underground. The process is designed to improve the recovery of gas that is difficult to extract while permanently storing the CO2, according to the report.
Weighing nearly 17,000 tons, the platform stands taller than a 28-story building. Its decks cover more than 10,000 square meters, equivalent to nearly 22 standard basketball courts.
Dongfang 1-1, China’s first independently operated offshore gasfield, has produced more than 50 billion cubic meters of natural gas since entering production in 2003. It is also a representative example of the country’s offshore gasfields with high CO2 content.
As the field enters the mid-to-late stages of development, gas output is declining while the proportion of CO2 in the produced gas is rising. These conditions provide an opportunity to put CO2 injection technology into practice, the report said.
The project will mark China’s first large-scale offshore application of CO2 injection for enhanced gas recovery. It is expected to support the development of an offshore carbon storage industry and expand the resource utilization of captured CO2, according to CCTV News.
https://www.globaltimes.cn/page/202610/1371675.shtml
show less
Saudi Arabia: Natural Gas Distribution Company secures Al-Kharj gas network licence
Saudi Arabia’s Ministry of Energy has awarded Natural Gas Distribution Company a licence to construct, own and operate a natural gas distribution network in Al-Kharj Industrial City. The award follows a competitive tender process that included investor prequalification and a comprehensive assessment of bids.
SHOW MORE
The project supports the Kingdom’s Liquid Fuel Displacement Programme by enabling industries to replace liquid fuels with natural gas.
The initiative also aligns with Saudi Vision 2030, which aims to maximise the economic, environmental and social value of the Kingdom’s hydrocarbon resources. -TradeArabia News Service
show less
US: Trump says South Korea will invest $54B in Alaska natural gas pipeline
President Donald Trump speaks in the Oval Office of the White House, Wednesday, Sept. 30, 2026, in Washington, as Commerce Secretary Howard Lutnick, Sen. Dan Sullivan, R-Alaska, and Interior Secretary Doug Burgum listen. (AP Photo/Alex Brandon)
SHOW MORE
President Donald Trump on Wednesday touted what he described as a commitment by South Korea to invest $54 billion in a liquefied natural gas pipeline in Alaska.
Surrounded by Alaska leaders and members of his cabinet, Trump said that under a trade agreement his administration negotiated, South Korea would subsidize the construction of the costly 800-mile gasline that has been sought for decades.
The announcement comes as Glenfarne, a privately held company that owns a majority of the Alaska LNG project, has yet to announce a final investment decision, a critical step needed for the project to move forward. South Korean officials recently said that the Alaska LNG project was still under review for commercial viability, a Korean news outlet reported Wednesday.
Glenfarne executives previously indicated that they aimed to have the final investment decision by December 2025. The goalpost has repeatedly moved since then.
In a discussion with the Anchorage Daily News editorial board last week, Glenfarne executives again reiterated that they are confident the project will move forward, but said that a final investment decision is contingent on several steps that have yet to take place, including a change to Alaska’s tax structure that has faced obstacles in the Legislature.
Glenfarne Group’s CEO Brendan Duval and Glenfarne Alaska LNG president Adam Prestidge are recognized during Gov. Mike Dunleavy’s State of the State address to a joint session of the Alaska Legislature in Juneau on Jan. 22. (Marc Lester / ADN archive)
The investment in the gas line is part of what Trump described as an agreement between his administration and South Korea intended to reduce the tariffs he imposed on the country.
“They paid to get them reduced and part of that money is going into that project. Otherwise, this project is so big it probably, I don’t know, maybe the money wouldn’t be available,” said Trump.
Representatives of the Korean government were not part of the White House event.
The nearly $200 billion South Korean investment, as described by Trump, would also go toward a natural gas power plant in Texas and eight new nuclear power plants across the country.
In the Oval Office, Gov. Mike Dunleavy said the Alaska LNG project will “save the state of Alaska.”
But state Sen. Cathy Giessel, an Anchorage Republican who chairs the Senate Resources Committee, said the Trump announcement “was pretty void of detail” on how it would change or advance Alaska’s long-sought pipeline.
“I was disappointed that South Korea was not in the room to speak to these things,” Giessel said.
Earlier this month, Korean Industry Minister Kim Jung-kwan said the country “will review the Alaska LNG project under the clear principle that we will proceed only if its commercial viability is established.”
Given that statement, Giessel said she doesn’t “see them jumping in on this with actual cash.”
“Because of that, it felt like that whole press avail today was a campaign event,” she said.
President Donald Trump speaks in the Oval Office of the White House, Wednesday, Sept. 30, 2026, in Washington. Alaska elected officials in attendance include U.S. Rep. Nick Begich, third from left; Gov. Mike Dunleavy, fourth from left; and U.S. Sen. Dan Sullivan, center, behind Trump. (AP Photo/Alex Brandon)
Glenfarne chief executive Brendan Duval, who attended the White House event, said that the project could begin delivering natural gas to Alaskans within three years, and exporting liquefied natural gas within five years.
Dunleavy earlier this year asked the Alaska Legislature to pass a multibillion-dollar property tax break for the project in an effort to reduce its cost. The tax bill did not pass amid opposition from key lawmakers, who criticized the lack of publicly available information on the project, its cost and long-term prospects.
Lawmakers also sought to tie the tax break to a change to Alaska’s corporate income taxes that would ensure the tax applies to oil and gas companies that don’t currently pay it, including S corporations. Opposition to that change from Hilcorp, a privately held oil and gas company, contributed to the failure of this year’s legislative efforts.
Becky Windt Pearson, head of Alaska legal affairs for Glenfarne, said last week that the company would again pursue a tax overhaul during the legislative session that begins in January. But that reform could look very different from the one pursued by Dunleavy, depending on who succeeds him in the governor’s mansion.
“I think what we will see next session, our prediction, is going to be something not exactly like what was in this last bill. I mean, depending on who sits in the governor’s chair,” Windt Pearson said.
“Just depending on where the Legislature and the governor land, who knows what we’ll see on the S corp tax front,” she said.
Democratic gubernatorial candidate Jonathan Kreiss-Tomkins has repeatedly said he would seek to reform Alaska’s corporate income taxes on oil and gas companies, a move that could increase annual state revenue by over $100 million. The three Republicans in the race have denounced those efforts.
Republican candidate Dave Bronson called on Trump to “federalize” the Alaska LNG project.
Windt Pearson said last week that the trade agreement with South Korea could be a “potential option for a federal program to come to the table and support the project and potentially move the timeline up and expedite how quickly we could complete it.” But Glenfarne was not involved in trade agreement conversations, its executives said.
“We’ve got a lot of support from the Trump administration. There’s a dialogue back-and-forth about potential ways we could take the project forward, but right now there are pieces of the project that need to be sorted out in terms of having all of the contracts in place and having a project that is financeable,” said Adam Prestidge, president of Glenfarne Alaska LNG.
Giessel said that if South Korea does invest heavily in the project, it could have implications for Alaskans and the state’s ability to benefit from the project.
“What are they going to require for this $54 billion?” she said. “This gets pretty complicated when you bring in a foreign entity who’s putting down most of the money for the project. Suddenly, the control of the project changes significantly.”
Giessel said that the South Korean government could try to secure some of the associated construction jobs for Korean workers, rather than Alaskans, and affect the price that Alaskans pay for the natural gas produced through the project.
“This is our gas. We’re going to have a foreign company own our gas pipeline? Are they going to be the ones buying the gas, and then we’ll negotiate with them to buy it for ourselves? It gets really complicated when you think of all the questions,” she said.
The 800-mile pipeline to transport natural gas from the North Slope to Southcentral Alaska is a decades-old idea that has repeatedly been pursued, then scrapped, in large part due to the formidable cost of the project.
Trump promised to prioritize the project in an executive order signed in January 2025. He said Wednesday that he’d been hearing about the pipeline “from the time I’m a little boy.”
“I was always fascinated by it,” said Trump.
Alaska leaders, Trump and members of his cabinet used Wednesday’s event to rain effusive praise on U.S. Sen. Dan Sullivan, a Republican locked in a close race with Democratic challenger Mary Peltola, a former U.S. House representative.
Trump called Sullivan “a great senator who is totally responsible for this pipeline.”
In a statement released Wednesday, Peltola said she, too, supports the project.
Trump also used the Oval Office event to deride Dan J. Sullivan, another candidate in Alaska’s U.S. Senate race this year who shares a name with the incumbent.
“It’s crooked as hell,” Trump said. “They put up a man with his exact name, they picked him out of a hat.”
Asked why Sen. Sullivan appeared to be trailing in some polls, Trump said that “the people of Alaska, who I love, don’t know how good he is.”
“If the people of Alaska knew what I know, and I know the real facts, there wouldn’t even be a race,” said Trump.
show less
Egypt adds 45 MMcf/d of natural gas from 4 new wells
The expansion supports the Ministry of Petroleum and Mineral Resources’ efforts to boost local natural gas production, enhance market supplies, and reduce import Egyptian petroleum companies jointly added 45 million cubic feet of gas per day (MMcf/d) and 540 barrels of condensate per day from four wells across the Western Desert, the Nile Delta, and the Gulf of Suez.
SHOW MORE
The expansion supports the Ministry of Petroleum and Mineral Resources’ efforts to boost local natural gas production, enhance market supplies, and reduce imports.
Khalda Petroleum Company contributed to the achievement by bringing the SKAL-2 well in the West Kalabsha area of the Western Desert online, producing around 12 MMcf/d of gas.
Al Amal Petroleum Company (Amapetco) returned the Amal-23 A ST well in the Gulf of Suez to production following repair work, reaching a rate of 15 MMcf/d of gas.
In the Nile Delta, the Ezz-2 well generated 10 MMcf/d, alongside 460 barrels of condensate per day. Meanwhile, Disouq Petroleum Company (DISOUCO) started production from the MA-1X well at about 8 MMcf/d and 80 barrels of condensate per day.
Meanwhile, the petroleum sector is working with production companies and investment partners to accelerate drilling, development, and workover programs, while maximizing the use of existing infrastructure. The efforts aim to bring additional wells online and boost local gas supplies, helping reduce reliance on imports.
https://www.zawya.com/en/projects/egypt-adds-45-mmcfd-of-natural-gas-from-4-new-wells-1458964
show less
US: Baker Hughes signs agreements to expand Venezuela gas infrastructure
Oct 5 (Reuters) – Baker Hughes (BKR.O), opens new tab said on Monday it has signed an agreement with Venezuelan state oil company PDVSA, engineering firm Lindsayca and LNG developer Fulcrum LNG to develop natural gas infrastructure in the South American country.
SHOW MORE
The US oilfield services company also entered into a separate agreement with New Stratus Energy to support future oil and gas projects in the country.
Here are more details:
Baker Hughes said the agreements create a framework to tie the country’s upstream resource development, midstream infrastructure, gas monetization and LNG commercialization.
Under the first alliance, Baker Hughes, Lindsayca and Fulcrum will combine their capabilities to develop the infrastructure needed to process, transport, commercialize and potentially export natural gas.
Any projects developed under the alliance would be subject to separate definitive agreements, internal approvals and applicable US sanctions and export-control requirements, including authorizations from the US Treasury Department’s Office of Foreign Assets Control, Baker Hughes said.
Baker Hughes had earlier this year said it sees a significant revenue opportunity in Venezuela, with the main considerations for operating there being safety and conditions for employees, and clarity on legal and regulatory frameworks.
Venezuela’s oil industry has been state-controlled for two decades, since the government expropriated assets of foreign companies such as US giants ExxonMobil (XOM.N), opens new tab and ConocoPhillips (COP.N), opens new tab.
Chevron (CVX.N), opens new tab is the only US major that retained continuous operations in the country, as a partner of PDVSA.
Financial terms of Baker Hughes’ agreements were not disclosed.
Reporting by Katha Kalia in Bengaluru; Editing by Leroy Leo
show less
US: Kinder Morgan Lifts Force Majeure on US-Mexico Gas Pipeline
Kinder Morgan Inc. is restoring natural gas shipments on its Tennessee Gas Pipeline Co. to Mexico after making repairs that triggered a force majeure earlier this week.
Tennessee Gas has resolved issues identified on Oct. 5 that forced the company to isolate and shut some sections of pipe, including the Rio Bravo and Cenagas delivery meters, according to a filing. The force majeure declaration a day later sparked renewed concerns in Mexico about the nation’s dependence on US gas supplies.
SHOW MORE
Even a small hiccup in US-to-Mexico gas flows can have dire consequences for an electric grid heavily reliant on its northern neighbor’s production of the fuel.
Roughly 75% of Mexico’s gas comes from Texas, making the country the biggest overall buyer of US supplies. American pipeline exports to Mexico have surged during the past decade and a half from about 1 billion cubic feet a day in 2010 to roughly 8 billion now, according to BloombergNEF data.
In the event of outages, Mexico only has about three days of gas supplies in reserves, according to Cuitlahuac Garcia, director of Mexican pipeline operator CENAGAS.
“We don’t have storage facilities but we can find ways to manage the situation,” Garcia said during a media briefing Wednesday. CENAGAS had received a warning that flows could be cut by up to 20% on the outage, sparking a “critical situation” in Mexico, he said.
On Thursday, Garcia said there’s no gas crisis and that Pemex is producing more of the fuel domestically, alleviating shortage concerns.
Mexican President Claudia Sheinbaum has launched an effort to explore fracking in a bid to increase domestic gas production, but has placed limits on where the technique can be employed. Her government has also announced around $8 billion in investment in new pipelines to shore up the country’s gas network.
show less
Natural Gas / LNG Utilization / Bio-LNG
Canada: EIG’s MidOcean Energy to Participate in LNG Canada Phase 2
MidOcean Energy (“MidOcean”), a liquefied natural gas (“LNG”) company formed and managed by EIG, a leading institutional investor in the global energy and infrastructure sectors, today announced its participation in Phase 2 of LNG Canada through its partnership with PETRONAS, following the Final Investment Decision (FID) by the LNG Canada joint venture partners on September 29, 2026.
SHOW MORE
MidOcean’s participation in Phase 2 follows the completion of its December 2025 acquisition of a 20% interest in the North Montney Upstream Joint Venture (“NMJV”), which holds PETRONAS’ upstream investment in Canada, and a 20% interest in the North Montney LNG Limited Partnership (“NMLLP”), which holds PETRONAS’ 25% participating interest in the LNG Canada Project.
Phase 2 will add two liquefaction trains at LNG Canada’s facility in Kitimat, British Columbia, increasing the project’s production capacity from 14 mtpa to 28 mtpa. The expansion will build on LNG Canada’s position on Canada’s Pacific Coast and is expected to provide access to abundant Canadian natural gas resources and competitive shipping routes to key Asian markets.
MidOcean’s participation in Phase 2 will increase associated LNG volumes, from 0.7 mtpa to 1.4 mtpa, and deepen its position across the integrated LNG value chain, spanning upstream gas production in the North Montney and liquefaction and export through LNG Canada. The investment is consistent with MidOcean’s strategy to build a large, diversified, cost- and carbon-competitive global LNG portfolio, and reinforces its position as a long-term partner of choice for high-quality LNG projects across the Pacific Basin.
“We have long believed in LNG Canada as one of the world’s most advantaged projects: with the scale, resource depth, and Pacific Basin access to deliver reliable energy to global markets for decades,” said De la Rey Venter, CEO of MidOcean. “Participating in Phase 2 is a natural next step for us, and we have strengthened our partnership with PETRONAS while advancing our strategy of investing in high-quality, globally competitive LNG assets.”
show less
QatarEnergy expects first North Field East LNG train in first half of 2027
QatarEnergy’s chief executive targets first production from the North Field East project in the first half of 2027. Damage has also hit two LNG trains and one GTL line at Ras Laffan.
Saad al-Kaabi, chief executive of QatarEnergy, expects first production from the first North Field East (NFE) train in the first half of 2027. He spoke on September 20, 2026, at the Qatar Economic Forum Special Edition in New York. The timeline comes as other options are being studied in the market, such as floating LNG, which Wood Mackenzie links to 18 mmtpa, or the regasified LNG option Libya is studying. Liquefied natural gas (LNG) remains central to Qatar’s expansion strategy.
SHOW MORE
A four-train project with 32 million tonnes per year
NFE comprises four trains with a combined nominal capacity of 32 million tonnes of LNG per year (Mt/y), according to the configuration ExxonMobil published with the partnership agreement on June 21, 2022. Each train has a stated capacity of 8 Mt/y. These figures describe design capacity, not actual output.
The first-half 2027 deadline remains a management forecast. A facility ready to start up, a facility producing its first volumes and a facility able to deliver regular cargoes are separate milestones. The documents reviewed do not allow a date for available cargoes to be inferred.
Damage at Ras Laffan across two industrial chains
Saad al-Kaabi said two LNG trains and one gas-to-liquids (GTL) production line, a process that converts gas into liquid fuels, had been damaged at Ras Laffan. The information comes from an account by Qatar’s state news agency QNA and has not been independently verified. Repairing Pearl GTL concerns a different chain from the LNG production destined for carriers.
The repair timeline put forward by QatarEnergy’s management remains a forward-looking statement. Shell, the operator of Pearl GTL, provided separate industrial confirmation. Its initial estimate and the deadline later reported by the Qatari agency do not share the same reference date. No completion of the work is documented at this stage.
Equipment availability and export capacity
Shell documented a general shutdown of LNG production that preceded the damage described at Pearl GTL. That sequence prevents the entire drop in output from being attributed to physical destruction of the facilities. Equipment availability and the ability to export are two separate constraints.
The head of QatarEnergy also ruled out bypassing the strait by pipeline, citing commercial and technical reasons. In his explanation, moving the gas in gaseous form and liquefying it elsewhere would require new facilities and duplicate part of the investment already made in Qatar. The export system therefore remains dependent on maritime navigation.
https://energynews.pro/en/qatarenergy-expects-first-north-field-east-lng-train-in-first-half-of-2027
show less
\
UK: World’s first synthetic natural gas manufacturer opens in UK
The UK now has its first ever manufacturing facility for synthetic natural gas (SNG) systems at over 60,000 sqft – the first of its kind in the world and one of the largest new manufacturing facilities to open in London for over 20 years.
SHOW MORE
The UK currently has a large reliance on imported fossil gas, with imports meeting around 67% of gas demand in 2025. Rivan Industries, the company behind the facility, is the only company in the world at this stage of developing an SNG system that can compete with fossil gas.
Rivan designs and manufactures a 1MW modular SNG system that is fully integrated as it takes in electricity from off-grid solar assets and turns it into H2 and CO2, before feeding into a reactor that produces SNG.
When the facility is fully operational, it will run semi-automated and build up to 50 systems a year, which will then be deployed at sites across the UK to produce SNG.
The new development will also facilitate more than 100 roles over the next 12 months, working towards the company’s aim of bringing up to 1TWh of SNG online in the next three years.
show less
Malaysia: Air Products to Launch Malaysia’s First LNG-Based ASU by 2027
Air Products will build Malaysia’s first LNG-based air separation unit, supplying over 600 tonnes daily to industrial customers from 2027.
Air Products is strengthening its industrial gas footprint in Malaysia with a major new LNG-based air separation unit (ASU) planned at the Pengerang LNG regasification terminal in Johor. The company has concluded a definitive agreement with PG Cold Energy 1 Sdn. Bhd. (PGCE1), a joint venture led by PETRONAS Gas Berhad through PG Energia Sdn. Bhd. and DIALOG Group Berhad through DIALOG Equity (Three) Sdn. Bhd.
SHOW MORE
Under the agreement, Air Products will design, build and operate the new facility, which is expected to begin operations by early 2027. The plant is expected to produce more than 600 tonnes per day of liquid oxygen, nitrogen and argon, significantly strengthening the availability of industrial gases for Malaysia’s southern and central regions.
The project marks another expansion milestone for Air Products in Asia and will become its fifth LNG-based ASU in the region. It also reinforces the company’s more than five-decade presence in Malaysia, where it has operated since 1974.
The new production capacity is strategically positioned to serve Malaysia’s growing industrial base, particularly the electrical and electronics, petrochemical, aerospace and general manufacturing sectors. These industries rely heavily on high-purity industrial gases for processes including semiconductor manufacturing, metal processing, chemical production, inerting, combustion and specialty applications.
A key feature of the project is its integration with the LNG regasification process. The facility will utilize cold energy generated during LNG regasification to liquefy air at extremely low temperatures. This approach can improve energy efficiency compared with conventional production configurations while potentially reducing production-related emissions.
The development was marked by a document exchange ceremony at the PETRONAS Twin Towers, attended by senior executives from PETRONAS Gas Berhad, DIALOG and Air Products. The event highlighted the long-standing relationship between PETRONAS Gas and Air Products, which spans more than four decades.
For Air Products, the investment expands production capabilities while improving its ability to supply customers across Malaysia. The company already operates a network of production facilities, depots and pipeline infrastructure across the country. Its northern operations include advanced ASUs in the Prai Industrial Area and pipeline networks serving Batu Kawan and Bayan Lepas Industrial Park in Penang.
The Pengerang project could therefore provide Air Products with additional strategic capacity in southern Malaysia while positioning the company closer to major petrochemical and manufacturing clusters.
With industrial activity and demand for high-purity gases continuing to expand, the new ASU could improve supply reliability and reduce logistical dependence on transported liquid gases in the region.
Product and Chemical Commodity Price Impact
The new ASU is likely to have a moderately bearish-to-neutral impact on liquid oxygen, nitrogen and argon prices in Southern and Central Malaysia once commercial production begins in 2027. More than 600 tonnes/day of additional capacity could improve regional availability and reduce supply tightness, particularly for merchant-market customers. However, the impact on broader chemical commodity prices tracked by ChemAnalyst should remain limited because oxygen, nitrogen and argon are primarily industrial gases rather than feedstocks for most petrochemical products. Improved gas availability could nevertheless support Malaysia’s electronics, petrochemical and manufacturing sectors by lowering supply constraints and improving production reliability. LNG-linked energy efficiency may also strengthen Air Products’ cost competitiveness.
show less
Greece: Wärtsilä signs service agreement for TMS Cardiff Gas vessels
Wärtsilä has signed a five-year service agreement with Greece-based operator, TMS Cardiff Gas, to support the operation of two newbuild LNG carrier (LNG carrier) vessels. The agreement is designed to maximise vessel availability and operational reliability through optimised maintenance planning, expert support, and predictive maintenance services. The order was booked by Wärtsilä in 3Q26.
SHOW MORE
As LNG trade continues to grow, vessel operators face increasing pressure to maintain high levels of reliability, efficiency, and schedule adherence. Effective lifecycle support plays an important role in helping ship operators minimise unplanned downtime, optimise maintenance activities, and secure the long-term performance of critical onboard assets. The latest agreement builds on a successful relationship between Wärtsilä and TMS Cardiff Gas, following the renewal in 2025 of an existing agreement covering seven vessels in the company’s fleet.
“There is increasing global demand for LNG, and carrier operators place a high value on reliability. This is why this agreement with Wärtsilä is important to us. The existing agreement covering other vessels in our fleet has delivered a successful combination of technology, high-quality spare parts support and expert services, helping us maintain reliable and efficient operations. Extending this collaboration to these two newbuild vessels supports our goal of maximising availability and operational performance across the fleet,” said Alexandros Politis-Kalenteris, Deputy COO – TMS Cardiff Gas.
The agreement covers the recently delivered 174 000 m3 LNG carriers, Al Thurayya and Al Majhoulah. Through Wärtsilä’s Dynamic Maintenance Planning service, the vessels will benefit from flexible maintenance scheduling, extended maintenance intervals, and reduced spare parts consumption. The agreement also includes 24/7 remote operational support, contract management services, and Expert Insight, Wärtsilä’s predictive maintenance solution that uses real-time operational data to identify potential issues before problems arise. Each vessel is equipped with two WinGD 5X72DF two-stroke main engines, four Wärtsilä 34DF auxiliary engines, and Wärtsilä gas valve units.
“As vessel operations become increasingly complex, operators are looking for greater predictability, efficiency, and support throughout the asset lifecycle,” added Henrik Wilhelms, Director, Agreement Sales, Wärtsilä Marine. “By combining advanced digital capabilities, predictive maintenance and expert lifecycle services, we help our customers maximise asset performance, reduce operational risk, and maintain competitiveness in a rapidly evolving operating environment.”
The two vessels have recently entered service as part of a broader fleet expansion programme underway at TMS Cardiff Gas. In addition to the service agreement and equipment on board, TMS Cardiff Gas also utilises Wärtsilä Fleet Optimisation Solution across its wider fleet.
show less
Global LNG Development
Qatar: ConocoPhillips signs 20-year LNG deal with Venture Global
Oct 1 (Reuters) – Venture Global (VG.N), and ConocoPhillips (COP.N), said on Thursday they had signed a 20-year liquefied natural gas (LNG) supply agreement under which ConocoPhillips will buy 1 million tonnes a year of LNG starting in 2030.
SHOW MORE
The deal comes as ConocoPhillips looks to bolster its LNG portfolio while challenges stemming from the Iran conflict have affected QatarEnergy’s LNG operations and expansion projects in which ConocoPhillips holds interests.
Here are more details:
Under the agreement, ConocoPhillips will purchase 1.0 million tonnes a year of LNG from Venture Global for 20 years, with deliveries beginning in 2030.
Venture Global said the agreement will support ConocoPhillips’ growing global LNG portfolio.
ConocoPhillips holds a 30% interest in QatarEnergy’s Ras Laffan LNG project and also has stakes in LNG expansion projects in Qatar.
Venture Global said it has more than 100 MTPA of LNG capacity in production, construction or development.
The company’s first three LNG projects, Calcasieu Pass, Plaquemines LNG and CP2 LNG, are located in Louisiana.
OneSubsea to Deliver Production Systems for Rovuma LNG
OneSubsea said Wednesday it had received a contract from Exxon Mobil Corp to deliver subsea production systems for phase 1 of the planned Rovuma LNG project in Mozambique.
“The contract scope includes the delivery of subsea trees, manifolds, umbilicals and associated control systems designed to support efficient production from the deepwater field”, OneSubsea said in a press release, without disclosing the contract value. “SLB OneSubsea will provide engineering, procurement, manufacturing, along with installation services, leveraging its experience in delivering subsea systems for complex deepwater developments worldwide”.
SHOW MORE
show less
OneSubsea – an Oslo- and Houston-headquartered joint venture between SLB Ltd, Asker Solutions ASA and Subsea7 SA – said it plans to build a services base in the Eastern African country for Rovuma LNG.
With an expected production capacity of 18.6 million metric tons a year, the Cabo Delgado facility will liquefy gas from 18 wells in the Rovuma basin’s Area 4 deepwater block, according to ExxonMobil.
Last month ExxonMobil said it had signed a letter of intent with a consortium of Saipem SpA and Jan De Nul Group for the project’s upstream infrastructure.
“The letter of intent concerns limited preliminary engineering and procurement and other technical services, aimed at advancing project definition and execution planning, for an initial value of approximately EUR 11 million [nearly $12.5 million]”, Saipem said September 10.
“The final award of the engineering, procurement, construction and installation contract to the consortium is subject to positive FID [final investment decision] by the Area 4 partners and receipt of the necessary government and regulatory approvals, expected in 2026”.
The Rovuma LNG partners also awarded service contracts to two Mozambican companies: CFML Logistic SA for shorebase and infrastructure services at the Pemba Bulk Terminal and Alistair Group Mozambique LDA for shorebase logistics services, ExxonMobil said September 10.
On August 17 ExxonMobil said the Area 4 partners issued around $1.1 billion in engineering, procurement and manufacturing contracts for Rovuma LNG.
“The largest contract was granted to OneSubsea UK Ltd and OneSubsea AS, with in-country work to be supported by Aker Solutions Mozambique Ltda, for engineering, procurement, fabrication and manufacturing services related to subsea production systems, controls and umbilicals”, ExxonMobil said on its Mozambique website.
“Together, these contracts will enable suppliers to begin fabricating and manufacturing materials requiring significant quantities and specialized equipment with extended delivery schedules”, ExxonMobil said. “Awarding these contracts before FID optimizes project execution timelines and helps ensure the availability of critical infrastructure”.
On August 10 ExxonMobil said it had signed a letter of intent with a joint venture of Saipem, McDermott Energy Solutions (UK) Ltd, Daewoo Engineering & Construction Co Ltd and China Petroleum Engineering & Construction Corp for limited engineering and procurement services.
Last year Abu Dhabi National Oil Co PJSC joined the project through its international investment arm, XRG PJSC. XRG bought Galp Energia SGPS SA’s 10 percent stake in Area 4.
“This acquisition includes stakes in the operational Coral South Floating LNG, the planned Coral North FLNG and Rovuma LNG’s onshore development projects”, XRG said March 28, 2025.
The Area 4 consortium – which also includes Mozambique’s National Hydrocarbons Co, China National Petroleum Corp, Italy’s Eni SpA and South Korea’s Korea Gas Corp – expects to make an FID on Rovuma LNG this year.
show less
Ukraine, Germany discuss LNG supply to Ukraine
Ukrainian and German energy ministers have discussed supplying liquefied natural gas through German infrastructure to Ukraine and involving European companies in work with Ukraine’s gas storage facilities, Ukrainian energy ministry said on Sunday.
SHOW MORE
Ukraine had previously expressed interest in increasing LNG imports and had also offered European companies the option of storing their gas in Ukrainian underground storage facilities.
(This story has not been edited by Devdiscourse staff and is auto-generated from a syndicated feed.)
Abu Dhabi: ADNOC Secures 2 Million Tonnes LNG Deal with Thailand’s Gulf Group
ADNOC will supply approximately 2 million tonnes of LNG to Thailand’s Gulf Group from 2027, strengthening Asian energy trade and supply diversification.
Abu Dhabi National Oil Company (ADNOC) has strengthened its presence in Asia’s liquefied natural gas (LNG) market after signing a multi-year sales and purchase agreement (SPA) with Thailand’s Gulf Group. Under the agreement, ADNOC Trading will supply approximately 2 million tonnes of LNG to the Thai energy and infrastructure conglomerate over several years, with deliveries scheduled to begin in 2027.
SHOW MORE
show less
The agreement reinforces ADNOC’s strategy to expand its international gas marketing and trading operations while establishing long-term supply relationships across key Asian markets. It also builds on the companies’ existing partnership, which began with their first LNG supply agreement in 2025.
Nasser Al Muhairi, Acting CEO of ADNOC Downstream Industry, Marketing & Trading, said the latest agreement strengthens the company’s commitment to providing reliable energy supplies to Thailand and other Asian customers. He added that the deal represents another milestone in the development of ADNOC’s global LNG marketing and trading platform, enhancing supply flexibility and its ability to respond to growing international demand.
For Gulf Group, the agreement supports its strategy of building a diversified and resilient LNG portfolio to meet Thailand’s evolving energy requirements. The company is strengthening its position across the energy value chain through investments in midstream infrastructure, shipping capacity and relationships with major international suppliers.
Sarath Ratanavadi, Chief Executive Officer of Gulf Development Public Company Limited, said the partnership would provide greater flexibility and scale while supporting regional energy transition objectives. Securing additional LNG volumes through long-term arrangements can also help the company manage procurement requirements and diversify its supply sources.
The agreement comes as ADNOC continues to consolidate its LNG marketing and trading capabilities. In July 2026, the company launched its global LNG marketing and trading platform in Abu Dhabi Global Market, bringing its commercial activities together under an integrated structure. The platform is designed to improve customer access, strengthen shipping flexibility and optimise LNG portfolio management across international markets.
ADNOC has set a target of reaching 47 million tonnes per annum (mtpa) of marketable LNG capacity beyond 2030, positioning itself among the major global LNG suppliers. Its trading business has expanded its third-party LNG portfolio in recent years, supported by operations in Abu Dhabi, Singapore and Geneva.
The latest Thailand agreement highlights the growing importance of long-term LNG contracts in Asia, where energy companies are seeking dependable supplies to support electricity generation, industrial activity and changing fuel requirements. Although the contract strengthens ADNOC’s regional commercial position, its eventual market impact will depend on delivery schedules, wider LNG availability, competing supply offers and demand growth across Asia.
Product Impact and Chemical Commodity Price Outlook
The agreement is expected to improve LNG supply visibility for Thailand’s Gulf Group, support procurement diversification and strengthen ADNOC’s access to Asian customers from 2027. Greater long-term supply security could support gas-fired power generation and industrial energy consumption. For chemical markets tracked by ChemAnalyst, the direct price impact is likely to be limited initially because deliveries have not yet begun. Over time, improved LNG availability could moderate natural gas and electricity cost pressures for energy-intensive producers, potentially easing production costs for ammonia, methanol and other gas-based chemicals. However, prices will depend on regional gas benchmarks, feedstock availability, freight costs and global demand-supply balances.
show less
\
Brazil: Petrobras signs long-term agreement for the purchase and sale of Liquefied Natural Gas with U.S. company Cheniere Marketing, LLC.
Petrobras has signed a long-term Liquefied Natural Gas (LNG) purchase and sale agreement with Cheniere Marketing, LLC, a U.S. company and subsidiary of Cheniere Energy, Inc. (NYSE: LNG). The agreement provides for Petrobras to purchase 0.8 million tonnes per annum (mtpa) of LNG for a period of 22 years.
SHOW MORE
The contracting of long-term volumes reflects Petrobras’ strategy to reduce its exposure to volatility in the LNG spot market, strengthens the risk management of its natural gas portfolio, and increases flexibility and security in meeting its contractual commitments.
Cheniere Energy, Inc. is the leading producer and exporter of LNG in the United States. The company has one of the world’s largest liquefaction portfolios, comprising the Sabine Pass and Corpus Christi terminals in the states of Louisiana and Texas (USA), with a total LNG production capacity currently in operation of approximately 56 mtpa.
show less
US: Venture Global and ConocoPhillips play the long game with 20-year LNG pact
U.S.-headquartered energy company ConocoPhillips has locked in two decades of LNG supply with Venture Global, an American producer of liquefied natural gas (LNG) sourced from North American basins, reinforcing U.S. export footprint on the global stage.
SHOW MORE
Venture Global and ConocoPhillips have signed a new, long-term sales and purchase agreement (SPA) for 1.0 million tonnes per annum (mtpa) of LNG for 20 years, starting in 2030.
Mike Sabel, Venture Global’s CEO, commented: “Venture Global is proud to welcome ConocoPhillips, one of the world’s leading energy companies, as a long-term partner.
“This agreement reflects continued market confidence in our proven ability to deliver reliable, low-cost U.S. LNG quickly and at scale. We look forward to supporting ConocoPhillips’ growing global LNG portfolio for decades to come.”
With over 100 mtpa of capacity in production, construction, or development, Venture Global, which began producing LNG from its first facility in 2022, has assets across the LNG supply chain, including LNG production, natural gas transport, shipping, and regasification.
The company’s first three projects, Calcasieu Pass, Plaquemines LNG, and CP2 LNG, are located in Louisiana along the Gulf of America. The firm is also developing carbon capture and sequestration (CCS) projects at each of its LNG facilities.
Venture Global secured multiple SPAs this year, including those with European players, such as EnBW.
show less
Norway: Equinor, Eneco Seal Five-Year Gas Supply Deal for Netherlands
Equinor and Eneco signed a five-year gas supply agreement delivering 9 TWh annually, with verified emissions data supporting lower-carbon energy procurement. Norwegian energy major Equinor and Dutch energy company Eneco have signed a five-year natural gas supply agreement, strengthening the Netherlands’ energy security while increasing transparency around the environmental footprint of gas supplies. Under the agreement, Equinor will supply approximately 9 terawatt-hours (TWh) of natural gas annually, equivalent to around 0.9 billion cubic metres (bcm), to the Dutch gas grid.
SHOW MORE
Deliveries under the agreement began on October 1, 2026. The companies have not disclosed the commercial terms of the deal.
The natural gas will originate from the Norwegian continental shelf, where production and pipeline transportation have a comparatively low greenhouse gas footprint among gas sources supplied to Europe. Alongside physical gas deliveries, Equinor will transfer verified environmental attributes to Eneco through the digital platform operated by Attributes SA.
According to the companies, the greenhouse gas footprint of the gas supplied under the agreement is 11.8% lower than the average footprint of gas delivered through the Dutch gas grid. The verified environmental attributes provide documented information about the gas’s origin and its upstream greenhouse gas emissions, helping Eneco demonstrate the environmental characteristics of its procurement.
The agreement marks the third long-term deal signed between Equinor and Eneco this year. Equinor said all three agreements include verified environmental attributes through the Attributes platform, reflecting the growing importance of emissions transparency in European energy procurement.
“This is the third long-term agreement we have signed with Eneco this year, and I am very pleased that we are further expanding our relationship,” said Helle Østergaard Kristiansen, Equinor’s senior vice president for Gas & Power. She added that the agreements demonstrate the value European energy companies place on the reliability and comparatively low emissions footprint of Norwegian gas.
For Eneco, the deal supports its strategy of expanding sustainable energy solutions while maintaining reliable supplies for customers who continue to depend on natural gas. Selina Thurer, Board Member Customers at Eneco, said the agreement would enable the company to supply all its residential and small-business customers in the Netherlands with Norwegian gas.
The deal highlights the continuing role of natural gas in Europe’s energy mix as energy companies balance supply security, customer demand and emissions-reduction objectives. By combining long-term deliveries with verified environmental data, Equinor and Eneco are strengthening their commercial relationship while responding to increasing demand for traceable energy supplies.
Impact on ChemAnalyst-Tracked Chemical Commodity Prices
The deal could provide indirect support to European natural gas prices by reinforcing supply security and maintaining access to Norwegian pipeline gas. However, the contracted volume is not necessarily additional production, so the agreement alone is unlikely to trigger a major market-price shift. Natural gas remains a key feedstock and energy source for ammonia, urea, methanol and other energy-intensive chemicals. Reliable supply could help moderate production-cost volatility and ease upward pressure on these commodities, while effects on prices will depend on regional gas benchmarks, demand, inventories and competing supply. No immediate price movement can be established from the agreement alone.
show less
LNG as a Marine Fuel/Shipping
CLPe partners with CNOOC to complete Hong Kong’s first PCTC LNG bunkering operation
LPe and CNOOC (Shenzhen) International Marine Clean Energy Co., Ltd (CNOOC), completed Hong Kong’s first LNG ship-to-ship bunkering operation for a pure car and truck carrier (PCTC), the AICC Fenghuang, on 26 September. As a large and high-sided vessel with a substantial windage area, the AICC Fenghuang posed greater challenges in vessel berthing, stability control, operational co-ordination, and safety management during bunkering. This achievement demonstrates Hong Kong’s capability to support various types of green-fuel-powered vessels, reinforces its development as a world-class green marine fuel bunkering centre, and strengthens its position as a leading international maritime centre.
SHOW MORE
The operation was conducted at Western Anchorage No. 3 west of Victoria Harbour, where approximately 2600 m3 of LNG was delivered to the AICC Fenghuang in around six hours by CNOOC’s Haiyang Shiyou 301, the world’s largest LNG bunkering and transport vessel. The LNG dual-fuel PCTC measures around 200 m in length and 38 m in width, with 12 decks and a capacity for 7000 standard vehicles. Owned by Anhui Port and Shipping Group, which is based in Anhui, the Chinese Mainland’s leading automotive manufacturing province, the vessel departed for the Mediterranean immediately after bunkering, carrying vehicles exported from the Mainland.
As two large vessels were required to maintain a safe distance while remaining steadily alongside during the operation, the project team undertook meticulous planning covering anchorage, weather and sea conditions, vessel positioning, berthing procedures, and emergency arrangements. Close co-ordination was maintained throughout the bunkering process to ensure safe and efficient execution.
CLPe Managing Director, Ringo Ng, said: “Through close collaboration and meticulous operational planning, CLPe and CNOOC have successfully completed Hong Kong’s first LNG bunkering operation for a PCTC, demonstrating the expertise and capabilities of both companies in serving a diverse range of oceangoing vessels. CLPe will continue to promote the wider adoption of green marine fuels and support the accelerated green transformation of Hong Kong’s maritime industry.”
Source: https://www.lngindustry.com/small-scale-lng/14102026/clpe-partners-with-cnooc-to-complete-hong-kongs-first-pctc-lng-bunkering-operation/
show less
Qatar: More Qatari LNG cargoes transit Strait of Hormuz despite ongoing risks
SINGAPORE, Oct 5 (Reuters) – More liquefied natural gas cargoes loaded from Ras Laffan have reappeared outside the Strait of Hormuz over the weekend after transiting the waterway, extending a recent increase in Qatar’s LNG traffic despite ongoing security risks linked to the U.S.-Israeli war on Iran.
SHOW MORE
Four LNG vessels carrying Qatari cargoes reappeared outside the Strait of Hormuz around October 2-3, according to Kpler and LSEG shiptracking data
Three of the vessels – Bu Samra, Al Gattara and Al Sadd – are QatarEnergy-linked. Al Gattara is currently signalling for Zhejiang, China while Al Sadd delivered its cargo to the Dahej terminal in India on October 3
The fourth vessel, Al Kharsaah, is managed by Seapeak Maritime, an independent owner and operator of gas carriers
All four vessels were last seen inside the strait between September 18-27. Many vessels passing through the strait make “dark transits” by turning off their Automatic Identification System transponders to avoid detection
Meanwhile, another LNG vessel, Al Marrouna, also managed by Seapeak Maritime, reappeared in ballast inside the Strait of Hormuz off the coast of Qatar on October 2 after previously being tracked outside the waterway
QatarEnergy and Seapeak Maritime both did not respond to requests for comment
show less
Qatar: MISC Names First of Three LNG Carriers for QatarEnergy
MISC has named Th’ailib, the first of three new 174,000-cubic-metre liquefied natural gas (LNG) carriers secured under long-term charter agreements with QatarEnergy, at Samsung Heavy Industries (SHI) in South Korea.
SHOW MORE
Th’ailib will enter a firm 15-year charter with QatarEnergy starting in 2026, with two additional vessels scheduled for delivery as part of MISC’s participation in the energy company’s LNG fleet expansion programme.
The three vessels form part of the second phase of the program. MISC previously participated in its first phase through a consortium arrangement involving 12 LNG carriers, bringing its involvement across the two phases to 15 vessels.
Th’ailib is equipped with dual-fuel engines, a reliquefaction system, high-performance anti-fouling hull coating and an air lubrication system aimed at improving fuel efficiency and energy use and reducing emissions intensity.
The vessel also features navigation, safety and monitoring systems and was designed and built in accordance with applicable International Maritime Organization requirements and international maritime standards.
The vessel’s name is derived from Jabal Thuaileb in Qatar’s Fox Hills district and from the Arabic word for ‘fox’.
The naming ceremony on October 6 was attended by representatives of QatarEnergy, MISC, Samsung Heavy Industries and DNV.
“LNG will continue to play a critical role in meeting the world’s growing need for affordable energy while supporting the broader transition towards lower-emission energy systems, with Qatar remaining a major supplier to markets around the world.
“Against this backdrop, MISC is privileged to support QatarEnergy’s ambitions and remains focused on delivering the performance that will sustain this partnership well into the future.As the first of three newbuild LNG carriers secured by MISC under our long-term time charter agreement with QatarEnergy, she reflects the strength we have built over decades as an LNG shipowner and the confidence placed in our ability to own and operate sophisticated maritime assets safely, reliably and efficiently,” said Zahid Osman, MISC President and Group CEO.
https://www.marinelink.com/news/misc-names-first-three-lng-carriers-543491
show less
Technological Development for Cleaner and Greener Environment Hydrogen & Bio-Methane
Spain begins rapid planning of pipelines for three green hydrogen projects
Content could not be retrieved. The URL fetch failed with a 403 status code (Forbidden). The server recognized the request as coming from a non-browser source and refused to serve the content. This is typically a bot-detection or anti-scraping block.
SHOW MORE
Alternative suggestions:
Open the link directly in your browser. Since the 403 is likely tied to automated fetching, a normal browser visit may work fine.
Check the Wayback Machine. Paste the URL into web.archive.org to see if a snapshot exists.
Search for the headline. Searching “Spain begins rapid planning of pipelines for three green hydrogen projects” may surface the same story on other outlets.
Use Gasworld’s app or newsletter. The same content may be accessible there.
However, the story is widely covered by other outlets that were successfully retrieved. Based on those sources, the key details are: Spain Begins Rapid Planning of Pipelines for Three Green Hydrogen Projects
Key Details from Alternative Sources (Official MITECO Press Release and Energy News Coverage)
The Announcement
Spain’s Ministry for Ecological Transition and the Demographic Challenge (MITECO) has initiated the urgent processing of the first segments of the country’s renewable hydrogen backbone network (Red troncal de hidrógeno renovable), developed by Enagás .
These infrastructures are classified as Projects of Common European Interest (PCI) and will require an investment of €389 million (~$439 million) .
The Three Green Hydrogen Projects
The pipelines are linked to three major green hydrogen projects that have received public funding and are driving the infrastructure request :
Why the Urgent Procedure?
The developers of these three projects requested accelerated permitting so they can bring forward their final investment decisions . The urgent procedure halves the timeframe for certain administrative processes, though environmental impact assessments will not be shortened — each pipeline must still undergo its own full environmental review with the standard public consultation period .
Connection to H2Med
These pipeline segments are enablers of the H2Med corridor, which will connect the Iberian Peninsula with central Europe, ultimately linking to the BarMar subsea pipeline between Barcelona and Marseille . H2Med is scheduled to begin commercial operation in 2032 .
Economic Framework
Under the processing (pursuant to Additional Provision 38 of Law 34/1998 of the hydrocarbons sector), the segments will initially have negotiated access rights and will not accrue regulated remuneration from the gas system. Their economic and access framework will later be adapted to comply with the transposition of the European package on renewable gas, natural gas, and hydrogen markets .
Next Steps
Enagás is expected to soon request administrative authorization for the remaining segments of the future hydrogen backbone, including routes such as Mérida-Salamanca, Salamanca-León, León-Llanera, Arrigorriaga-Haro, Haro-Zaragoza, Tivissa-Salzadella, and others .
Broader Context
Spain has awarded more than €3,000 million to 124 renewable hydrogen projects under the Recovery, Transformation and Resilience Plan (PRTR) . The country’s abundant solar and wind resources are increasingly positioning it as a promising large-scale producer of green hydrogen for both domestic use and export into the EU
show less
