Monthly Production Report for March 2022

  1. Production of Natural Gas

Natural gas production during March 2022 was 2886.23 MMSCM, which is 7.46% higher than the production of March 2021 but 15.49% lower than the monthly target. Cumulative natural gas production during April-March 2021-22 was 34023.52 MMSCM, which is 18.66% higher than production during corresponding period of last year but 9.65% lower when compared with target for the period. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of March 2022 and cumulatively for April-March 2021-22 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.

Table-2: Natural Gas Production (in MMSCM)

Oil Company

Target

March (Month)

April-March (Cumulative)

2021-22 (Apr-Mar)*

2021-22

2020-21

% over last year

2021-22

2020-21

% over last year

Target*

Prod.*

Prod.

Target*

Prod.*

Prod.

ONGC

22599.73

1961.81

1755.72

1831.78

95.85

22599.73

20628.70

21872.07

94.32

OIL

3222.90

278.25

250.50

210.09

119.23

3222.90

2892.54

2479.75

116.65

PSC Fields

11834.60

1175.18

880.01

643.89

136.67

11834.60

10502.28

4320.74

243.07

Total

37657.24

3415.24

2886.23

2685.76

107.46

37657.24

34023.52

28672.56

118.66

Note:  Totals may not tally due to rounding off. *: Provisional

 

  

Figure-2: Monthly Natural Gas Production

    1. Natural gas production by ONGC (Oil and Natural Gas Corporation) in the nomination blocks during March 2022 was 1755.72 MMSCM, which is 10.51% lower than target for the month and 4.15% lower than the production of March 2021. Cumulative natural gas production by ONGC during April-March, 2021-22 was 20628.70 MMSCM, which is 8.72% and 5.68% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
  • Less than anticipated gas production from WO-16 cluster due to delay in mobilization of MOPU Sagar Samrat.
  • Less than planned production from Vasistha /S1 wells in EOA due to certain reservoir related issues.
  • Less gas production from KG-DWN-98/2 block in EOA as well U1-B is producing less than the estimated profile and there is delay in commissioning of well U1-A.
  • Less gas production in Tapti-Daman block in B&S Asset due to more than anticipated decline.
  • Delay of HF in Mandapeta & Natural Decline in Pasarlapudi and CA-16 fields in Rajahmundry
    1. Natural gas production by OIL (Oil India Ltd) in the nomination block during March 2022 was 250.50 MMSCM which is 19.23% higher than production of corresponding month of last year and 9.97% lower than the target for the month of current year. Cumulative natural gas production by OIL during April-March 2021-22 was 2892.54 MMSCM, which is 16.65% higher than production during corresponding period of last year but 10.25% lower than target for the period. Reasons for shortfall in production are as under:
  • Less than planned contribution from drilling wells /old wells.
  • Less offtake by the consumer (RRVUNL, Ramgarh, Rajasthan) due to technical problem, unscheduled shutdown, damaged due to fire incident of Gas Turbine.
    1. Natural gas production by Pvt/JVs companies in the PSC/RSC/CBM regime during March 2022 was 880.01 MMSCM, which is 36.67% higher than the production of March 2021 but 25.12% lower than the target for the month. Cumulative natural gas production by Pvt/JVs during April-March, 2021-22 was 10502.28 MMSCM, which is 143.07% higher than production during corresponding period of last year but 11.26% lower than target for the period. Reasons for shortfall in production are as under:
  • KG-DWN-98/2 (ONGC): Delay in commissioning of Well U1-A.
  • RJ-ON-90/1 (Cairn Energy India Ltd): Lower gas production from Eastern and Southern Corridor wells of RDG field.
  • KG-DWN-98/3 (RIL): Production shortfall due to closure of wells E2, C2 & Q1- Dev1 for reservoir studies. Observed less production from well AV1-DEV1 after workover job. Production loss due to closer of #AR2-Dev1 for Subsea Control Module replacement.
  • Raniganj East (Essar Oil and Gas Exploration and Production Ltd.): Shortfall because delay in scheduled operations. Reservoir uncertainties & well bore issues in certain areas of the field.
  • RJ-ON/6 (FEL): Production shortfall due to less offtake by customer.

Leave a Reply